메뉴 건너뛰기




Volumn 17, Issue 1, 2002, Pages 154-158

Optimal dispatch of generating units of the Itaipú hydroelectric plant

Author keywords

Hydroelectric power generation; Optimization method; Scheduling; Unit commitment

Indexed keywords

DYNAMIC PROGRAMMING; ELECTRIC POWER GENERATION; HYDROELECTRIC GENERATORS; HYDROELECTRIC POWER PLANTS; MATHEMATICAL MODELS; OPTIMIZATION; PENSTOCKS; PLANT SHUTDOWNS;

EID: 0036474056     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.982207     Document Type: Article
Times cited : (171)

References (7)
  • 5
    • 0031079225 scopus 로고    scopus 로고
    • Hydro unit start-up costs and their impact on the short term scheduling strategies of Swedish power producers
    • Feb.
    • (1997) IEEE Trans. Power Syst. , vol.12 , pp. 38-43


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.