Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling

Author keywords

Hybrid evolutionary algorithm (HEA); Time coupling methods (TCM); Time cost relationship

Indexed keywords

CONSTRUCTION INDUSTRY; GRAPHIC METHODS; OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 49549103081     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.04.002     Document Type: Article
Times cited : (79)

References (34)
  • 1
    • 11644260552 scopus 로고
    • O'Brien J.J. (Ed), McGraw-Hill Inc., New York
    • In: O'Brien J.J. (Ed). Scheduling Handbook (1969), McGraw-Hill Inc., New York
    • (1969) Scheduling Handbook
  • 2
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • Carr R.I., and Meyer W.L. Planning construction of repetitive building units. J. Constr. Div., ASCE 100 3 (1974) 403-412
    • (1974) J. Constr. Div., ASCE , vol.100 , Issue.3 , pp. 403-412
    • Carr, R.I.1    Meyer, W.L.2
  • 4
    • 2142649813 scopus 로고
    • Network analysis and construction planning
    • Peer S. Network analysis and construction planning. J. Constr. Div., ASCE 100 3 (1974) 203-210
    • (1974) J. Constr. Div., ASCE , vol.100 , Issue.3 , pp. 203-210
    • Peer, S.1
  • 5
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Sellinger S. Construction planning for linear projects. J. Constr. Div., ASCE 106 2 (1980) 195-205
    • (1980) J. Constr. Div., ASCE , vol.106 , Issue.2 , pp. 195-205
    • Sellinger, S.1
  • 6
    • 0022779734 scopus 로고
    • Linear scheduling using optimal control theory
    • Handa V.K., and Barcia R.M. Linear scheduling using optimal control theory. J. Constr. Eng., ASCE 112 3 (1986) 387-393
    • (1986) J. Constr. Eng., ASCE , vol.112 , Issue.3 , pp. 387-393
    • Handa, V.K.1    Barcia, R.M.2
  • 8
    • 0016643558 scopus 로고
    • VPM scheduling for high-rise buildings
    • O'Brien J.J. VPM scheduling for high-rise buildings. J. Constr. Div., ASCE 101 4 (1975) 895-905
    • (1975) J. Constr. Div., ASCE , vol.101 , Issue.4 , pp. 895-905
    • O'Brien, J.J.1
  • 10
    • 0019064535 scopus 로고
    • Construction planning beyond the critical path
    • Birrell G.S. Construction planning beyond the critical path. J. Constr. Div., ASCE 106 3 (1980) 389-407
    • (1980) J. Constr. Div., ASCE , vol.106 , Issue.3 , pp. 389-407
    • Birrell, G.S.1
  • 11
    • 0019583188 scopus 로고
    • Linear scheduling methods for highway construction
    • Johnston D.W. Linear scheduling methods for highway construction. J. Constr. Div., ASCE 107 C02 (1981) 247-261
    • (1981) J. Constr. Div., ASCE , vol.107 , Issue.C02 , pp. 247-261
    • Johnston, D.W.1
  • 12
    • 0020178299 scopus 로고
    • Time space scheduling method
    • Stradal O., and Cacha J. Time space scheduling method. J. Constr. Div., ASCE 108 3 (1982) 445-457
    • (1982) J. Constr. Div., ASCE , vol.108 , Issue.3 , pp. 445-457
    • Stradal, O.1    Cacha, J.2
  • 13
    • 0028750185 scopus 로고
    • HVLS: horizontal and vertical logic scheduling for multistorey projects
    • Thabet W.Y., and Beliveau Y.J. HVLS: horizontal and vertical logic scheduling for multistorey projects. J. Constr. Eng. Manag., ASCE 120 4 (1994) 875-892
    • (1994) J. Constr. Eng. Manag., ASCE , vol.120 , Issue.4 , pp. 875-892
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 16
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities on construction projects
    • El-Rayes K., and Moselhi O. Resource-driven scheduling of repetitive activities on construction projects. J. Constr. Manag. Econ., ASCE 16 4 (1998) 433-446
    • (1998) J. Constr. Manag. Econ., ASCE , vol.16 , Issue.4 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 17
    • 0035132257 scopus 로고    scopus 로고
    • Optimal resource utilization for repetitive construction projects
    • El-Rayes K., and Moselhi O. Optimal resource utilization for repetitive construction projects. J. Constr. Eng. Manag., ASCE 127 1 (2001) 18-27
    • (2001) J. Constr. Eng. Manag., ASCE , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 18
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • Harris R.B., and Ioannou P.G. Scheduling projects with repeating activities. J. Constr. Eng. Manag., ASCE 124 4 (1998) 269-278
    • (1998) J. Constr. Eng. Manag., ASCE , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1    Ioannou, P.G.2
  • 19
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction
    • Adeli H., and Karim A. Scheduling/cost optimization and neural dynamics model for construction. J. Constr. Eng. Manag., ASCE 123 4 (1997) 450-458
    • (1997) J. Constr. Eng. Manag., ASCE , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 20
    • 26644445713 scopus 로고    scopus 로고
    • Time-cost optimization of construction projects with generalized activity constraints
    • Chassiakos A.P., and Sakellaropoulos S.P. Time-cost optimization of construction projects with generalized activity constraints. J. Constr. Eng. Manag., ASCE 131 10 (2005) 1115-1124
    • (2005) J. Constr. Eng. Manag., ASCE , vol.131 , Issue.10 , pp. 1115-1124
    • Chassiakos, A.P.1    Sakellaropoulos, S.P.2
  • 22
    • 49549092299 scopus 로고    scopus 로고
    • Evolutionary heuristics for hard permutational optimization problems
    • Bożejko W., and Wodecki M. Evolutionary heuristics for hard permutational optimization problems. Int. J. Comput. Intell. Res., Res. India Publ. 2 2 (2006) 151-158
    • (2006) Int. J. Comput. Intell. Res., Res. India Publ. , vol.2 , Issue.2 , pp. 151-158
    • Bozejko, W.1    Wodecki, M.2
  • 24
    • 49549107606 scopus 로고    scopus 로고
    • Afanasev V.A. and Afanasev A.V. (2000). Stream scheduling of works in civil engineering. (P{cyrillic}o{cyrillic}t{cyrillic}o{cyrillic}ch{cyrillic}n{cyrillic}a{cy rillic}ya{cyrillic} o{cyrillic}r{cyrillic}g{cyrillic}a{cyrillic}n{cyrillic}i{cyrillic}z{cyri llic}a{cyrillic}ts{cyrillic}i{cyrillic}ya{cyrillic} r{cyrillic}a{cyrillic}b{cyrillic}o{cyrillic}t{cyrillic} v{cyrillic} s{cyrillic}t{cyrillic}r{cyrillic}o{cyrillic}i{cyrillic}t{cyrillic}ye{cyr illic}l{cyrillic}{cyrillic small soft sign}s{cyrillic}t{cyrillic}v{cyrillic}ye{cyrillic}), St. Petersburg.
    • Afanasev V.A. and Afanasev A.V. (2000). Stream scheduling of works in civil engineering. (P{cyrillic}o{cyrillic}t{cyrillic}o{cyrillic}ch{cyrillic}n{cyrillic}a{cy rillic}ya{cyrillic} o{cyrillic}r{cyrillic}g{cyrillic}a{cyrillic}n{cyrillic}i{cyrillic}z{cyri llic}a{cyrillic}ts{cyrillic}i{cyrillic}ya{cyrillic} r{cyrillic}a{cyrillic}b{cyrillic}o{cyrillic}t{cyrillic} v{cyrillic} s{cyrillic}t{cyrillic}r{cyrillic}o{cyrillic}i{cyrillic}t{cyrillic}ye{cyr illic}l{cyrillic}{cyrillic small soft sign}s{cyrillic}t{cyrillic}v{cyrillic}ye{cyrillic}), St. Petersburg.
  • 25
    • 49549085567 scopus 로고    scopus 로고
    • Mrozowicz J. (1982). Methods of organizing construction processes. Monographs No.14. Wrocław University of Technology, Doctoral thesis.
    • Mrozowicz J. (1982). Methods of organizing construction processes. Monographs No.14. Wrocław University of Technology, Doctoral thesis.
  • 27
    • 49549101857 scopus 로고    scopus 로고
    • Stream methods of construction work organisation: an introduction to the problem
    • Hejducki Z., and Mrozowicz J. Stream methods of construction work organisation: an introduction to the problem. Eng., Constr. Archit. Manag., Emerald Publ. 8 2 (2001) 80-89
    • (2001) Eng., Constr. Archit. Manag., Emerald Publ. , vol.8 , Issue.2 , pp. 80-89
    • Hejducki, Z.1    Mrozowicz, J.2
  • 28
    • 84997776142 scopus 로고    scopus 로고
    • Scheduling model of construction activity with time couplings
    • Hejducki Z. Scheduling model of construction activity with time couplings. J. Civ. Eng. Manag., Vilnius Gediminas Tech. Univ. 9 4 (2003) 284-291
    • (2003) J. Civ. Eng. Manag., Vilnius Gediminas Tech. Univ. , vol.9 , Issue.4 , pp. 284-291
    • Hejducki, Z.1
  • 29
    • 2342538328 scopus 로고    scopus 로고
    • Sequencing problems in methods of organizing construction processes
    • Hejducki Z. Sequencing problems in methods of organizing construction processes. Eng., Constr. Archit. Manag., Emerald Publ. 11 1 (2004) 20-32
    • (2004) Eng., Constr. Archit. Manag., Emerald Publ. , vol.11 , Issue.1 , pp. 20-32
    • Hejducki, Z.1
  • 33
    • 0002511908 scopus 로고
    • A survey of constraint handling techniques in evolutionary computation methods
    • Michalewicz Z. A survey of constraint handling techniques in evolutionary computation methods. Evol. Program. (1995) 135-155
    • (1995) Evol. Program. , pp. 135-155
    • Michalewicz, Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.