Study on multiple objective optimization method in construction project management

Author keywords

Cost; Multiple objective; Quality; Resource equilibrium; Time limit; TOPSIS

Indexed keywords

CONSTRUCTION INDUSTRY; COSTS; MATHEMATICAL MODELS; OPTIMIZATION; QUALITY CONTROL;

EID: 38049076522     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WICOM.2007.1301     Document Type: Conference Paper
Times cited : (6)

References (8)
  • 1
    • 38049009576 scopus 로고    scopus 로고
    • Project performance control in reconstruction projects
    • March
    • Mckim R, Hegazy T, and Attaila M, "Project performance control in reconstruction projects," Journal of Project Management., vol. 17(4), pp. 137-141, March 2000.
    • (2000) Journal of Project Management , vol.17 , Issue.4 , pp. 137-141
    • Mckim, R.1    Hegazy, T.2    Attaila, M.3
  • 2
    • 0033177842 scopus 로고    scopus 로고
    • Time cost and quality trade-off in project management: A case study
    • August
    • Do Ba Khang, and Yin Mon Myint, "Time cost and quality trade-off in project management: a case study", Journal of Project Management, vol. 17, pp. 249-256, August 1999.
    • (1999) Journal of Project Management , vol.17 , pp. 249-256
    • Khang, D.B.1    Mon Myint, Y.2
  • 3
    • 52249108822 scopus 로고    scopus 로고
    • the Multi-goal optimization problem in network project
    • in Chinese, Journal of East China Jiaotong University, April
    • Zhou Shu-fa, and Liu Li, "the Multi-goal optimization problem in network project" (in Chinese), Journal of East China Jiaotong University., vol. 21, pp. 10-13, April 2004.
    • (2004) , vol.21 , pp. 10-13
    • Shu-fa, Z.1    Li, L.2
  • 4
    • 0037265925 scopus 로고    scopus 로고
    • Zhang Li-xia, and Shi Ke-bin, Construction network's optimization under multi-goal conditions (in Chinese), Systems Engineering-theory and Practice., 23, pp. 56-61, Januray 2003.
    • Zhang Li-xia, and Shi Ke-bin, "Construction network's optimization under multi-goal conditions" (in Chinese), Systems Engineering-theory and Practice., vol.23, pp. 56-61, Januray 2003.
  • 5
    • 38049064600 scopus 로고    scopus 로고
    • Analysis of time-cost-quality tradeoff optimization in construction project management (in Chinese)
    • April
    • Wang Jian, LIU Er-lie, and LUO Gang, "Analysis of time-cost-quality tradeoff optimization in construction project management" (in Chinese), Journal of Systems Engineering., vol. 19, pp.148-153, April 2004.
    • (2004) Journal of Systems Engineering , vol.19 , pp. 148-153
    • Wang Jian, L.I.U.E.1    Gang, L.U.O.2
  • 6
    • 38049089494 scopus 로고    scopus 로고
    • Construction project investment optimization based on genetic algorithm(in Chinese), China Engineering
    • July
    • Chen Yao-ming, Zhong Deng-hua, and Fu Jin-qiang, "Construction project investment optimization based on genetic algorithm"(in Chinese), China Engineering Science., vol. 23, pp. 68-71, July 2006
    • (2006) Science , vol.23 , pp. 68-71
    • Yao-ming, C.1    Deng-hua, Z.2    Jin-qiang, F.3
  • 7
    • 33845516338 scopus 로고    scopus 로고
    • Application of PSO to multiple-objective project optimization(in Chinese)
    • October
    • Liu Xiao-feng, Chen Tong, and Zhang Lian-ying, "Application of PSO to multiple-objective project optimization"(in Chinese), China Civil Engineering Journal., vol.39, pp. 122-126, October 2006.
    • (2006) China Civil Engineering Journal , vol.39 , pp. 122-126
    • Xiao-feng, L.1    Tong, C.2    Lian-ying, Z.3
  • 8
    • 33748444828 scopus 로고    scopus 로고
    • The least variance priority method (LVM) for fuzzy complementary judgment matrix
    • in Chinese, October
    • Xu Ze-shui, "The least variance priority method (LVM) for fuzzy complementary judgment matrix"(in Chinese), Systems Engineering-theory & Practice., vol. 21, pp. 93-99, October 2001.
    • (2001) Systems Engineering-theory & Practice , vol.21 , pp. 93-99
    • Ze-shui, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.