메뉴 건너뛰기




Volumn 9, Issue 4, 2003, Pages 284-291

Scheduling model of construction activity with time couplings

Author keywords

Construction; Couplings; Scheduling model

Indexed keywords


EID: 84997776142     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.1080/13923730.2003.10531341     Document Type: Article
Times cited : (14)

References (13)
  • 6
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost tradeoff analysis using genetic algorithms
    • Hegazy, T. Optimization of construction time-cost tradeoff analysis using genetic algorithms. Canadian Journal of Civil Engineering, 26, 1999, p. 685-697.
    • (1999) Canadian Journal of Civil Engineering , vol.26 , pp. 685-697
    • Hegazy, T.1
  • 10
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D. W. Linear scheduling method for highway construction. J. Constr. Div., Am. Soc. Civ. Eng., 107(2), 1984, p. 247-261.
    • (1984) J. Constr. Div., Am. Soc. Civ. Eng. , vol.107 , Issue.2 , pp. 247-261
    • Johnston, D.W.1
  • 11
    • 85024190995 scopus 로고    scopus 로고
    • which take into account time couplings. Dolnośląskie Wydawnictwo Edukacyjne, Wrocław, (in Polish)
    • Mrozowicz, J. Methods of organizing construction processes, which take into account time couplings. Dolnośląskie Wydawnictwo Edukacyjne, Wrocław, 1997 (in Polish).
    • (1997) Methods of Organizing Construction Processes
    • Mrozowicz, J.1
  • 13
    • 85024185598 scopus 로고    scopus 로고
    • Multicriteria decision-making system for building refurbishment
    • Statyba). Vilnius: Technika
    • Zavadskas, E. K.; Kaklauskas, A.; Turskis, Z. Multicriteria decision-making system for building refurbishment. Civil Engineering (Statyba). Vilnius: Technika, No 4(12), 1997, p. 62-68 (in Lithuanian).
    • (1997) Civil Engineering , vol.4 , Issue.12 , pp. 62-68
    • Zavadskas, E.K.1    Kaklauskas, A.2    Turskis, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.