메뉴 건너뛰기




Volumn 19, Issue 4, 2008, Pages 299-319

Parameter design considering the impact of design changes on downstream processes based upon the Taguchi method

Author keywords

Design and process changes; Design parameters; Processes; Taguchi method

Indexed keywords


EID: 46049110970     PISSN: 09544828     EISSN: 14661837     Source Type: Journal    
DOI: 10.1080/09544820701376654     Document Type: Article
Times cited : (8)

References (27)
  • 3
    • 2642514834 scopus 로고    scopus 로고
    • Concurrent design and manufacturing of aircraft torque tubes
    • Chang, K.H. and Bryant, I.H., Concurrent design and manufacturing of aircraft torque tubes. J. Mater. Process. Technol., 2004, 150(1-2), 151-162.
    • (2004) J. Mater. Process. Technol , vol.150 , Issue.1-2 , pp. 151-162
    • Chang, K.H.1    Bryant, I.H.2
  • 4
    • 0034187269 scopus 로고    scopus 로고
    • Changchien, S.W. and Lin, L., Concurrent design of machined products: a multivariate decision approach. IEEE Trans. Systems Man Cybernet. Part C Applicat. Rev., 2000, 30(2), 252-264.
    • Changchien, S.W. and Lin, L., Concurrent design of machined products: a multivariate decision approach. IEEE Trans. Systems Man Cybernet. Part C Applicat. Rev., 2000, 30(2), 252-264.
  • 6
    • 0344114404 scopus 로고
    • Design for automated manufacturing
    • edited by A. Kusiak, pp, John Wiley & Sons: New York
    • Dong, Z., Design for automated manufacturing. In Concurrent Engineering: Automation, Tools, and Techniques, edited by A. Kusiak, pp. 207-234, 1993b (John Wiley & Sons: New York).
    • (1993) Concurrent Engineering: Automation, Tools, and Techniques , pp. 207-234
    • Dong, Z.1
  • 8
    • 0003403722 scopus 로고
    • Gu, P. and Kusiak, A, eds, Elsevier Science Publishers: Amsterdam
    • Gu, P. and Kusiak, A., eds., Concurrent Engineering: Methodology and Applications, 1993 (Elsevier Science Publishers: Amsterdam).
    • (1993) Concurrent Engineering: Methodology and Applications
  • 9
    • 30444450126 scopus 로고    scopus 로고
    • Information system based on a working situation model for a new design approach in concurrent engineering
    • Houssin, R., Bernard, A., Martin, P., Ris, G. and Cherrier, F., Information system based on a working situation model for a new design approach in concurrent engineering. J. Eng. Design, 2006, 17(1), 35-54.
    • (2006) J. Eng. Design , vol.17 , Issue.1 , pp. 35-54
    • Houssin, R.1    Bernard, A.2    Martin, P.3    Ris, G.4    Cherrier, F.5
  • 10
    • 0036466692 scopus 로고    scopus 로고
    • Quantitative measurement of component accessibility and product assemblability for design for assembly application
    • Hsu, H.Y. and Lin, G.C.I., Quantitative measurement of component accessibility and product assemblability for design for assembly application. Robot. Comput.-Integr. Manufact., 2002, 18(1), 13-27.
    • (2002) Robot. Comput.-Integr. Manufact , vol.18 , Issue.1 , pp. 13-27
    • Hsu, H.Y.1    Lin, G.C.I.2
  • 11
    • 0004652780 scopus 로고    scopus 로고
    • size issues
    • Quantitative impacts of project change
    • Ibbs, C.W., Quantitative impacts of project change: size issues. J. Construct. Eng. Manage. ASCE, 1997, 123(3), 308-311.
    • (1997) J. Construct. Eng. Manage. ASCE , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, C.W.1
  • 12
    • 13944260870 scopus 로고    scopus 로고
    • quantitative analysis
    • Project delivery systems and project change
    • Ibbs, C.W., Kwak,Y.H., Ng, T. and Odabasi, A.M., Project delivery systems and project change: quantitative analysis. J. Construct. Eng. Manage. ASCE, 2003, 129(4), 382-387.
    • (2003) J. Construct. Eng. Manage. ASCE , vol.129 , Issue.4 , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Odabasi, A.M.4
  • 13
    • 0035399179 scopus 로고    scopus 로고
    • Project change management system
    • Ibbs, C.W., Wong, C.K. and Kwak,Y.H., Project change management system. J. Manage. Eng., 2001, 17(3), 159-165.
    • (2001) J. Manage. Eng , vol.17 , Issue.3 , pp. 159-165
    • Ibbs, C.W.1    Wong, C.K.2    Kwak, Y.H.3
  • 14
    • 0032670219 scopus 로고    scopus 로고
    • an OO construction scheduling and change management system
    • CONSCOM
    • Karim, A. and Adeli, H., CONSCOM: an OO construction scheduling and change management system. J. Construct. Eng. Manage. ASCE, 1999, 125(5), 368-376.
    • (1999) J. Construct. Eng. Manage. ASCE , vol.125 , Issue.5 , pp. 368-376
    • Karim, A.1    Adeli, H.2
  • 17
    • 0038714399 scopus 로고    scopus 로고
    • Homogeneous state - space representation of concurrent design
    • Ong, K.L., Lee, S.G. and Khoo, L.P., Homogeneous state - space representation of concurrent design. J. Eng. Design, 2003, 14(2), 221-245.
    • (2003) J. Eng. Design , vol.14 , Issue.2 , pp. 221-245
    • Ong, K.L.1    Lee, S.G.2    Khoo, L.P.3
  • 20
    • 30444449967 scopus 로고    scopus 로고
    • State ofthe artof the concurrent engineering technique in the automotive industry
    • Sapuan, S.M., Osman, M.R. and Nukman,Y., State ofthe artof the concurrent engineering technique in the automotive industry. J. Eng. Design, 2006, 17(2), 143-157.
    • (2006) J. Eng. Design , vol.17 , Issue.2 , pp. 143-157
    • Sapuan, S.M.1    Osman, M.R.2    Nukman, Y.3
  • 22
    • 0000611747 scopus 로고    scopus 로고
    • A multi-level optimization approach considering product realization process alternatives and parameters for improving manufacturability
    • Xue, D., A multi-level optimization approach considering product realization process alternatives and parameters for improving manufacturability. J. Manufact. Systems, 1997, 16(5), 337-351.
    • (1997) J. Manufact. Systems , vol.16 , Issue.5 , pp. 337-351
    • Xue, D.1
  • 23
    • 0032205574 scopus 로고    scopus 로고
    • Optimal fuel cell system design considering functional performance and production costs
    • Xue, D. and Dong, Z., Optimal fuel cell system design considering functional performance and production costs. J. Power Sources, 1998, 76(1), 69-80.
    • (1998) J. Power Sources , vol.76 , Issue.1 , pp. 69-80
    • Xue, D.1    Dong, Z.2
  • 25
    • 0002640759 scopus 로고    scopus 로고
    • Joint optimization of performance and cost in integrated concurrent design: The tolerance synthesis part
    • Xue, D., Rousseau, J.H. and Dong, Z., Joint optimization of performance and cost in integrated concurrent design: the tolerance synthesis part. J. Eng. Design Automat., 1996, 2(1), 73-89.
    • (1996) J. Eng. Design Automat , vol.2 , Issue.1 , pp. 73-89
    • Xue, D.1    Rousseau, J.H.2    Dong, Z.3
  • 26
    • 0035576315 scopus 로고    scopus 로고
    • Optimal concurrent design based upon distributed product development life-cycle modeling
    • Zhang, F. and Xue, D., Optimal concurrent design based upon distributed product development life-cycle modeling. Robot. Comput. Integrat. Manufact., 2001, 17(6), 469-486.
    • (2001) Robot. Comput. Integrat. Manufact , vol.17 , Issue.6 , pp. 469-486
    • Zhang, F.1    Xue, D.2
  • 27
    • 0001378506 scopus 로고    scopus 로고
    • Environmentally conscious design and manufacturing: A state-of-the-art survey
    • Zhang, H.C., Kuo, T.C., Lu, H. and Huang, S.H., Environmentally conscious design and manufacturing: a state-of-the-art survey. J. Manufact. Systems, 1997, 16(5), 352-371.
    • (1997) J. Manufact. Systems , vol.16 , Issue.5 , pp. 352-371
    • Zhang, H.C.1    Kuo, T.C.2    Lu, H.3    Huang, S.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.