-
1
-
-
0025682920
-
Probabilistic simulation studies for repetitive construction process
-
AbouRizk, S. M., and Halpin, D. W. (1990). " Probabilistic simulation studies for repetitive construction process. " J. Constr. Eng. Manage., 116 (4), 575-594.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 575-594
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
2
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr, M. I., and Meyer, W. L. (1974). " Planning construction of repetitive building units. " J. Constr. Div., Am. Soc. Civ. Eng., 100 (3), 403-412.
-
(1974)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, M.I.1
Meyer, W.L.2
-
3
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rays, K., and Moselhi, O. (2001). " Optimizing resource utilization for repetitive construction projects. " J. Constr. Eng. Manage., 127 (1), 18-27.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rays, K.1
Moselhi, O.2
-
5
-
-
0037408628
-
Development of an object-oriented scheduling model for construction projects
-
Elsevier, Amsterdam, The Netherlands
-
Fan, S.L., Tserng, H.P., and Wang, M.T. (2002). " Development of an object-oriented scheduling model for construction projects. " Automation in construction, Vol. 12, Elsevier, Amsterdam, The Netherlands, 283-302.
-
(2002)
Automation in Construction
, vol.12
, pp. 283-302
-
-
Fan, S.L.1
Tserng, H.P.2
Wang, M.T.3
-
6
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink, D. J., and Rowings, J. E. (1998). " Linear scheduling model: Development of controlling activity path. " J. Constr. Eng. Manage., 124 (4), 263-268.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
7
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy, T., and Wassef, N. (2001). " Cost optimization in projects with repetitive nonserial activities. " J. Constr. Eng. Manage., 127 (3), 183-191.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
8
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D. W. (1981). " Linear scheduling method for highway construction. " J. Constr. Div., Am. Soc. Civ. Eng., 107 (2), 247-261.
-
(1981)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
9
-
-
0035454358
-
Optimal scheduling planning for multiple, repetitive construction process
-
Kang, L. S., Park, I. C., and Lee, B. H. (2001). " Optimal scheduling planning for multiple, repetitive construction process. " J. Constr. Eng. Manage., 127 (5), 382-390.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 382-390
-
-
Kang, L.S.1
Park, I.C.2
Lee, B.H.3
-
10
-
-
0022128947
-
SIREN: A repetitive construction simulation model
-
Kavanagh, D. P. (1985). " SIREN: A repetitive construction simulation model. " J. Constr. Eng. Manage., 111 (3), 308-323.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.3
, pp. 308-323
-
-
Kavanagh, D.P.1
-
12
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization. " J. Constr. Eng. Manage., 119 (4), 681-697.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
13
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
O'Brien, J. J. (1975). " VPM scheduling for high-rise buildings. " J. Constr. Div., Am. Soc. Civ. Eng., 101 (4), 895-905.
-
(1975)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien, J.J.1
-
14
-
-
0022076783
-
Network scheduling variations for repetitive work
-
O'Brien, J. J., Kreitzberg, F. C., and Mikes, W. F. (1985). " Network scheduling variations for repetitive work. " J. Constr. Eng. Manage., 111 (2), 105-116.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.2
, pp. 105-116
-
-
O'Brien, J.J.1
Kreitzberg, F.C.2
Mikes, W.F.3
-
15
-
-
33645526508
-
Network planning of project comprising repetitive activities
-
International Association of Housing Science, Vienna, Austria
-
Perera, S. (1982). " Network planning of project comprising repetitive activities. " Proc., IAHS Conf. on Impact of Economy and Technology, International Association of Housing Science, Vienna, Austria, 927-985.
-
(1982)
Proc., IAHS Conf. on Impact of Economy and Technology
, pp. 927-985
-
-
Perera, S.1
-
17
-
-
0025447970
-
RPM: Repetitive project modeling
-
Reda, R. (1990). " RPM: Repetitive project modeling. " J. Constr. Eng. Manage., 116 (2), 316-330.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.1
-
18
-
-
0027097188
-
Repetitive activity scheduling process
-
Orlando, Fla.
-
Rhabar, F.F., and Rowings, J.E. (1992). " Repetitive activity scheduling process. " ASCE Transaction., 36th Annual Meeting, Orlando, Fla., O.5.1-O.5.8.
-
(1992)
ASCE Transaction., 36th Annual Meeting
-
-
Rhabar, F.F.1
Rowings, J.E.2
-
19
-
-
0028495816
-
CPM/LOB: New methodology to integrate CPM and line of Balance
-
Sahail, S. A., and Neale, R. H. (1994). " CPM/LOB: New methodology to integrate CPM and line of Balance. " J. Constr. Eng. Manage., 120 (3), 667-684.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.3
, pp. 667-684
-
-
Sahail, S.A.1
Neale, R.H.2
-
20
-
-
0019030431
-
Construction planning for linear projects
-
Selinger, S. (1980). " Construction planning for linear projects. " J. Constr. Div., Am. Soc. Civ. Eng., 106 (2), 195-205.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.2
, pp. 195-205
-
-
Selinger, S.1
-
21
-
-
0024050376
-
Soft logic in network analysis
-
Tamimi, S., and Diekmann, J. (1988). " Soft logic in network analysis. " J. Constr. Eng. Manage., 2 (3), 289-300.
-
(1988)
J. Constr. Eng. Manage.
, vol.2
, Issue.3
, pp. 289-300
-
-
Tamimi, S.1
Diekmann, J.2
-
22
-
-
0030825017
-
SCaRC: Space-constrained resource-constrained scheduling system
-
Thabet, W. Y., and Beliveau, Y. J. (1997). " SCaRC: Space-constrained resource-constrained scheduling system. " J. Comput. Civ. Eng., 11 (1), 48-59.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
23
-
-
84930116614
-
Discussion of 'Formal development of line-of-balance technique' by Z. M. Al Sarraj
-
Vorster, M. C., and Bafna, T. (1992). " Discussion of 'Formal development of line-of-balance technique' by Z. M. Al Sarraj. " J. Constr. Eng. Manage., 118 (1), 210-211.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 210-211
-
-
Vorster, M.C.1
Bafna, T.2
-
24
-
-
1642438329
-
Network creation and development for repetitive-unit projects
-
Yi, K. J., Lee, H. S., and Choi, Y. K. (2002). " Network creation and development for repetitive-unit projects. " J. Constr. Eng. Manage., 128 (3), 257-264.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.3
, pp. 257-264
-
-
Yi, K.J.1
Lee, H.S.2
Choi, Y.K.3
|