-
1
-
-
0002434022
-
Equity consideration in traditional full-cost allocation practices: An axiomatic perspective
-
Moriarty S. (Ed), University of Oklahoma, Norman
-
Banker R. Equity consideration in traditional full-cost allocation practices: An axiomatic perspective. In: Moriarty S. (Ed). Joint Cost Allocations (1981), University of Oklahoma, Norman
-
(1981)
Joint Cost Allocations
-
-
Banker, R.1
-
2
-
-
29244445484
-
-
Cheng, A., Friedman, E., 2005. Sybilproof reputation mechanisms. In: SIGCOMM'05 Workshops, August 22-26, Philadelphia, USA
-
Cheng, A., Friedman, E., 2005. Sybilproof reputation mechanisms. In: SIGCOMM'05 Workshops, August 22-26, Philadelphia, USA
-
-
-
-
3
-
-
0034386243
-
Agreement, separability, and other axioms for quasi-linear social choice problems
-
Chun Y. Agreement, separability, and other axioms for quasi-linear social choice problems. Soc. Choice Welfare 17 (2000) 507-521
-
(2000)
Soc. Choice Welfare
, vol.17
, pp. 507-521
-
-
Chun, Y.1
-
4
-
-
44649085295
-
-
Chun, Y., 2004. Consistency and monotonicity in sequencing problems. Mimeo. Seoul National University
-
Chun, Y., 2004. Consistency and monotonicity in sequencing problems. Mimeo. Seoul National University
-
-
-
-
5
-
-
32644468156
-
A pessimistic approach to the queuing problem
-
Chun Y. A pessimistic approach to the queuing problem. Math. Soc. Sci. 51 2 (2006) 171-181
-
(2006)
Math. Soc. Sci.
, vol.51
, Issue.2
, pp. 171-181
-
-
Chun, Y.1
-
6
-
-
0000625331
-
Coalitional manipulations in a bankruptcy problem
-
De Frutos M.A. Coalitional manipulations in a bankruptcy problem. Rev. Econ. Design 4 (1999) 255-272
-
(1999)
Rev. Econ. Design
, vol.4
, pp. 255-272
-
-
De Frutos, M.A.1
-
7
-
-
0018006862
-
Incentive mechanisms for priority queuing problems
-
Dolan R. Incentive mechanisms for priority queuing problems. Bell J. Econ. 9 (1978) 421-436
-
(1978)
Bell J. Econ.
, vol.9
, pp. 421-436
-
-
Dolan, R.1
-
9
-
-
38249014155
-
Induced binary probabilities and the linear ordering polytope: A status report
-
Fishburn P. Induced binary probabilities and the linear ordering polytope: A status report. Math. Soc. Sci. 23 (1992) 67-80
-
(1992)
Math. Soc. Sci.
, vol.23
, pp. 67-80
-
-
Fishburn, P.1
-
11
-
-
3242802231
-
Simple sequencing problems with interdependent costs
-
Hain R., and Mitra M. Simple sequencing problems with interdependent costs. Games Econ. Behav. 48 (2004) 271-291
-
(2004)
Games Econ. Behav.
, vol.48
, pp. 271-291
-
-
Hain, R.1
Mitra, M.2
-
12
-
-
1542398756
-
Manipulations via merging and splitting in claim problems
-
Ju B.G. Manipulations via merging and splitting in claim problems. Rev. Econ. Design 8 (2003) 205-215
-
(2003)
Rev. Econ. Design
, vol.8
, pp. 205-215
-
-
Ju, B.G.1
-
13
-
-
44649109246
-
-
Ju, B.G., Miyagawa, E., Sakai, T., 2005. Non-manipulable division rules in claim problems and generalizations. J. Econ. Theory. In press
-
Ju, B.G., Miyagawa, E., Sakai, T., 2005. Non-manipulable division rules in claim problems and generalizations. J. Econ. Theory. In press
-
-
-
-
14
-
-
44649128274
-
-
Kittsteiner, T., Moldovanu, B., 2003. Auction-based queue disciplines. Mimeo. University of Bonn
-
Kittsteiner, T., Moldovanu, B., 2003. Auction-based queue disciplines. Mimeo. University of Bonn
-
-
-
-
15
-
-
14944353770
-
Priority auctions and queue disciplines that depend on processing time
-
Kittsteiner T., and Moldovanu B. Priority auctions and queue disciplines that depend on processing time. Manage. Sci. 51 2 (2005) 236-248
-
(2005)
Manage. Sci.
, vol.51
, Issue.2
, pp. 236-248
-
-
Kittsteiner, T.1
Moldovanu, B.2
-
16
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
Chapter 9 in:, Elsevier
-
Lawler E., Lenstra J.K., Rinnooy K.A., and Shmoys D. Sequencing and scheduling: Algorithms and complexity. Chapter 9 in:. Handbooks in Operations Research and Management Science, vol. 4 (1993), Elsevier
-
(1993)
Handbooks in Operations Research and Management Science, vol. 4
-
-
Lawler, E.1
Lenstra, J.K.2
Rinnooy, K.A.3
Shmoys, D.4
-
17
-
-
0038287385
-
A characterization of the Shapley value in queuing problems
-
Maniquet F. A characterization of the Shapley value in queuing problems. J. Econ. Theory 109 1 (2003) 90-103
-
(2003)
J. Econ. Theory
, vol.109
, Issue.1
, pp. 90-103
-
-
Maniquet, F.1
-
18
-
-
0035530139
-
Mechanism design in queuing problems
-
Mitra M. Mechanism design in queuing problems. Econ. Theory 17 (2001) 277-305
-
(2001)
Econ. Theory
, vol.17
, pp. 277-305
-
-
Mitra, M.1
-
19
-
-
3242768469
-
Achieving the first best in sequencing problems
-
Mitra M. Achieving the first best in sequencing problems. Rev. Econ. Design 7 (2002) 75-91
-
(2002)
Rev. Econ. Design
, vol.7
, pp. 75-91
-
-
Mitra, M.1
-
20
-
-
0002570538
-
Egalitarianism and utilitarianism in quasi-linear bargaining
-
Moulin H. Egalitarianism and utilitarianism in quasi-linear bargaining. Econometrica 53 1 (1985) 49-67
-
(1985)
Econometrica
, vol.53
, Issue.1
, pp. 49-67
-
-
Moulin, H.1
-
21
-
-
0000156646
-
Equal or proportional division of a surplus, and other methods
-
Moulin H. Equal or proportional division of a surplus, and other methods. Int. J. Game Theory 16 3 (1987) 161-186
-
(1987)
Int. J. Game Theory
, vol.16
, Issue.3
, pp. 161-186
-
-
Moulin, H.1
-
22
-
-
0036525814
-
The proportional random allocation of indivisible units
-
Moulin H. The proportional random allocation of indivisible units. Soc. Choice Welfare 19 2 (2002) 381-413
-
(2002)
Soc. Choice Welfare
, vol.19
, Issue.2
, pp. 381-413
-
-
Moulin, H.1
-
23
-
-
44649133571
-
-
Moulin, H., 2004. On scheduling fees to prevent merging, splitting and transferring jobs. Math. Operations Res. In press
-
Moulin, H., 2004. On scheduling fees to prevent merging, splitting and transferring jobs. Math. Operations Res. In press
-
-
-
-
24
-
-
44649130362
-
-
Moulin, H., 2005. Minimizing the worst slowdown: Offline, online. Operations Res. In press
-
Moulin, H., 2005. Minimizing the worst slowdown: Offline, online. Operations Res. In press
-
-
-
-
25
-
-
27844594372
-
On demand responsiveness in additive cost sharing
-
Moulin H., and Sprumont Y. On demand responsiveness in additive cost sharing. J. Econ. Theory 125 (2005) 1-35
-
(2005)
J. Econ. Theory
, vol.125
, pp. 1-35
-
-
Moulin, H.1
Sprumont, Y.2
-
26
-
-
0036474458
-
Fair queuing and other probabilistic allocation methods
-
Moulin H., and Stong R. Fair queuing and other probabilistic allocation methods. Math. Operations Res. 27 1 (2002) 1-31
-
(2002)
Math. Operations Res.
, vol.27
, Issue.1
, pp. 1-31
-
-
Moulin, H.1
Stong, R.2
-
27
-
-
0141726786
-
Filling a multicolor urn: An axiomatic analysis
-
Moulin H., and Stong R. Filling a multicolor urn: An axiomatic analysis. Games Econ. Behav. 45 (2003) 242-269
-
(2003)
Games Econ. Behav.
, vol.45
, pp. 242-269
-
-
Moulin, H.1
Stong, R.2
-
28
-
-
44649187159
-
-
Ozsoy, H., 2005. Coordinated splitting in probabilistic scheduling. Mimeo. Rice University
-
Ozsoy, H., 2005. Coordinated splitting in probabilistic scheduling. Mimeo. Rice University
-
-
-
-
29
-
-
0001267667
-
Structure of a simple scheduling polyhedron
-
Queyranne M. Structure of a simple scheduling polyhedron. Math. Programming 58 (1993) 263-285
-
(1993)
Math. Programming
, vol.58
, pp. 263-285
-
-
Queyranne, M.1
-
31
-
-
27744607807
-
On the discrete version of the Aumann-Shapley cost-sharing method
-
Sprumont Y. On the discrete version of the Aumann-Shapley cost-sharing method. Econometrica 73 (2005) 1693-1712
-
(2005)
Econometrica
, vol.73
, pp. 1693-1712
-
-
Sprumont, Y.1
-
32
-
-
0000738264
-
On incentive compatibility and budget balancedness in public decision making
-
Suijs J. On incentive compatibility and budget balancedness in public decision making. Econ. Design 2 (1996) 193-209
-
(1996)
Econ. Design
, vol.2
, pp. 193-209
-
-
Suijs, J.1
|