메뉴 건너뛰기




Volumn 42, Issue 4, 1996, Pages 591-602

Optimal shift scheduling with multiple break windows

Author keywords

Integer Programming; Manpower Scheduling; Service Operations Management

Indexed keywords

HEURISTIC PROGRAMMING; INTEGER PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION; PERSONNEL; SCHEDULING; WORK-REST SCHEDULES;

EID: 0030125115     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.42.4.591     Document Type: Article
Times cited : (114)

References (21)
  • 1
    • 85033857080 scopus 로고
    • GSM Working Paper #94-25, Graduate School of Management Rutgers, The State University of New Jersey, Newark, NJ
    • Aykin, T., "Reformulating the Tour Scheduling Problem to Improve Solvability," GSM Working Paper #94-25, Graduate School of Management Rutgers, The State University of New Jersey, Newark, NJ, 1994.
    • (1994) Reformulating the Tour Scheduling Problem to Improve Solvability
    • Aykin, T.1
  • 2
  • 3
    • 0010767738 scopus 로고
    • Personnel Scheduling with Flexshift Models
    • Bailey, J. and J. Fields, "Personnel Scheduling With Flexshift Models," J. Oper. Management, 5, 3 (1985), 327-338.
    • (1985) J. Oper. Management , vol.5 , Issue.3 , pp. 327-338
    • Bailey, J.1    Fields, J.2
  • 4
    • 0000309722 scopus 로고
    • Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
    • Bechtold, S. E. and L. W. Jacobs, "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Sci., 36, 11 (1990), 1339-1351.
    • (1990) Management Sci. , vol.36 , Issue.11 , pp. 1339-1351
    • Bechtold, S.E.1    Jacobs, L.W.2
  • 5
    • 0027543260 scopus 로고
    • A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem
    • Brusco, M. J. and L. W. Jacobs, "A Simulated Annealing Approach to the Cyclic Staff-Scheduling Problem," Naval Res. Logistics Quarterly, 40 (1993), 69-84.
    • (1993) Naval Res. Logistics Quarterly , vol.40 , pp. 69-84
    • Brusco, M.J.1    Jacobs, L.W.2
  • 6
    • 84989491929 scopus 로고
    • An Integrated Work Shift Scheduling System
    • Buffa, E. S., M. J. Cosgrove, and B. J. Luce, "An Integrated Work Shift Scheduling System," Decision Sci., 7 (1976), 620-630.
    • (1976) Decision Sci. , vol.7 , pp. 620-630
    • Buffa, E.S.1    Cosgrove, M.J.2    Luce, B.J.3
  • 7
    • 0000722156 scopus 로고
    • A Comment on Edie's Traffic Delays at Toll Booths'
    • Dantzig, G. B., "A Comment on Edie's Traffic Delays at Toll Booths'," Oper. Res., 2, 3 (1954), 339-341.
    • (1954) Oper. Res. , vol.2 , Issue.3 , pp. 339-341
    • Dantzig, G.B.1
  • 8
    • 0000722157 scopus 로고
    • Traffic Delays at Toll Booths
    • Edie, L. C., "Traffic Delays at Toll Booths," Oper. Res., 2, 2 (1954), 107-138.
    • (1954) Oper. Res. , vol.2 , Issue.2 , pp. 107-138
    • Edie, L.C.1
  • 9
    • 0001296956 scopus 로고
    • Sufficient Working Subsets for the Tour Scheduling Problem
    • Easton, F. F. and D. F. Rossin, "Sufficient Working Subsets for the Tour Scheduling Problem," Management Sci., 37 (1991), 1441-1451.
    • (1991) Management Sci. , vol.37 , pp. 1441-1451
    • Easton, F.F.1    Rossin, D.F.2
  • 10
    • 0002267839 scopus 로고
    • Telephone Sales Manpower Planning at Qantas
    • Gaballa, A. and W. Pearce, "Telephone Sales Manpower Planning at Qantas," Interfaces, 9, 3 (1979), 1-9.
    • (1979) Interfaces , vol.9 , Issue.3 , pp. 1-9
    • Gaballa, A.1    Pearce, W.2
  • 11
    • 0004545053 scopus 로고
    • A Heuristic Programming Approach to the Employee Scheduling Problem and Some Thoughts on 'Managerial Robots'
    • Glover, F., C. McMillan, and R. Grover, "A Heuristic Programming Approach to the Employee Scheduling Problem and Some Thoughts on 'Managerial Robots'," J. Oper. Management, 4 (1984), 113-128.
    • (1984) J. Oper. Management , vol.4 , pp. 113-128
    • Glover, F.1    McMillan, C.2    Grover, R.3
  • 12
    • 0016985083 scopus 로고
    • Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis
    • Henderson, W. B. and W. L. Berry, "Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis," Management Sci., 22, 12 (1976), 1372-1380.
    • (1976) Management Sci. , vol.22 , Issue.12 , pp. 1372-1380
    • Henderson, W.B.1    Berry, W.L.2
  • 13
    • 0018444711 scopus 로고
    • Operator Scheduling
    • Keith, E. G., "Operator Scheduling," AIIE Trans., 11 (1979), 37-41.
    • (1979) AIIE Trans. , vol.11 , pp. 37-41
    • Keith, E.G.1
  • 14
    • 5244285137 scopus 로고
    • Operating to Schedule Operators
    • July 30
    • Klasskin, P. M., "Operating to Schedule Operators," Telephony, July 30 (1973).
    • (1973) Telephony
    • Klasskin, P.M.1
  • 15
    • 0003391424 scopus 로고
    • An L.P. Model for Work Force Scheduling for Banks
    • Moondra, S. L., "An L.P. Model for Work Force Scheduling for Banks," J. Bank Res., Winter (1976), 299-301.
    • (1976) J. Bank Res. , vol.WINTER , pp. 299-301
    • Moondra, S.L.1
  • 17
    • 0016079835 scopus 로고
    • The Operator-Scheduling Problem: A Network Flow Approach
    • Segal, M., "The Operator-Scheduling Problem: A Network Flow Approach," Oper. Res., 22 (1974), 808-823.
    • (1974) Oper. Res. , vol.22 , pp. 808-823
    • Segal, M.1
  • 18
    • 85033838519 scopus 로고    scopus 로고
    • Personal Communication, June, 1993
    • _, Personal Communication, June, 1993.
  • 20
    • 0002116639 scopus 로고
    • A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization based Decision Support System
    • Taylor, P. E. and J. Huxley, "A Break from Tradition for the San Francisco Police: Patrol Officer Scheduling Using an Optimization based Decision Support System," Interfaces, 19, 1 (1989), 4-24.
    • (1989) Interfaces , vol.19 , Issue.1 , pp. 4-24
    • Taylor, P.E.1    Huxley, J.2
  • 21
    • 38249019798 scopus 로고
    • Shift Scheduling in Services When Employees Have Limited Availability: An L.P. Approach
    • Thompson, G. M., "Shift Scheduling in Services When Employees Have Limited Availability: An L.P. Approach," J. Oper. Management, 9, 3 (1990), 352-370.
    • (1990) J. Oper. Management , vol.9 , Issue.3 , pp. 352-370
    • Thompson, G.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.