Workforce allocation in cyclical scheduling problems: A survey
-
Baker, K. R., Workforce allocation in cyclical scheduling problems: A survey. Operational Research Quarterly, 1976, 27, 155-167.
-
(1976)
Operational Research Quarterly
, vol.27
, pp. 155-167
-
-
Baker, K.R.1
-
2
-
-
0031223441
-
Integrated project task and labor scheduling
-
Alfares, H. K. and Bailey, J. E., Integrated project task and labor scheduling. IIE Transactions, 1997, 29, 711-718.
-
(1997)
IIE Transactions
, vol.29
, pp. 711-718
-
-
Alfares, H.K.1
Bailey, J.E.2
-
3
-
-
0026821861
-
Multiproject staff scheduling with variable resource constraints
-
Dean, B. V., Denzler, D. R. and Watkins, J. J., Multiproject staff scheduling with variable resource constraints. IEEE Transactions on Engineering Management, 1992, 39, 59-72.
-
(1992)
IEEE Transactions on Engineering Management
, vol.39
, pp. 59-72
-
-
Dean, B.V.1
Denzler, D.R.2
Watkins, J.J.3
-
4
-
-
0027756229
-
Inventory reduction and manpower scheduling in a job shop using discrete event simulation: A case study
-
Los Angeles, CA
-
Bivens, L. and Kroll, D. E., Inventory reduction and manpower scheduling in a job shop using discrete event simulation: a case study. Proceedings of the 44th International Industrial Engineering Conference. Los Angeles, CA, 1993, pp. 246-253.
-
(1993)
Proceedings of the 44th International Industrial Engineering Conference
, pp. 246-253
-
-
Bivens, L.1
Kroll, D.E.2
-
5
-
-
0022750309
-
Decomposition principles applied to the dynamic production and workforce scheduling problem
-
Aardal, K. and Ari, A., Decomposition principles applied to the dynamic production and workforce scheduling problem. Engineering Costs and Production Economics, 1987, 12, 39-49.
-
(1987)
Engineering Costs and Production Economics
, vol.12
, pp. 39-49
-
-
Aardal, K.1
Ari, A.2
-
6
-
-
0031096922
-
Airline crew scheduling
-
Vance, P. H., Barnhart, C., Johnson, E. L. and Nemhauser, G. L., Airline crew scheduling. Operations Research, 1997, 45, 188-200.
-
(1997)
Operations Research
, vol.45
, pp. 188-200
-
-
Vance, P.H.1
Barnhart, C.2
Johnson, E.L.3
Nemhauser, G.L.4
-
7
-
-
0031103502
-
Solving large scale crew scheduling problems
-
Chu, H. D., Gelman, E. and Johnson, E. L., Solving large scale crew scheduling problems. European Journal of Operation Research, 1997, 97, 260-268.
-
(1997)
European Journal of Operation Research
, vol.97
, pp. 260-268
-
-
Chu, H.D.1
Gelman, E.2
Johnson, E.L.3
-
8
-
-
0019059991
-
Cyclic scheduling via integer programs with circular ones
-
Bartholdi, J. J., III., Orlin, J. B. and Ratliff, H. D., Cyclic scheduling via integer programs with circular ones. Operations Research, 1980, 28, 1074-1085.
-
(1980)
Operations Research
, vol.28
, pp. 1074-1085
-
-
Bartholdi J.J. III1
Orlin, J.B.2
Ratliff, H.D.3
-
9
-
-
0016091890
-
Scheduling a full-time workforce to cyclic staffing requirements
-
Baker, K. R., Scheduling a full-time workforce to cyclic staffing requirements. Management Science, 1974, 20, 1561-1568.
-
(1974)
Management Science
, vol.20
, pp. 1561-1568
-
-
Baker, K.R.1
-
10
-
-
0001518161
-
On manpower scheduling algorithms
-
Tien, J. M. and Kamiyama, A., On manpower scheduling algorithms. SIAM Review, 1982, 24, 275-287.
-
(1982)
SIAM Review
, vol.24
, pp. 275-287
-
-
Tien, J.M.1
Kamiyama, A.2
-
11
-
-
0004193076
-
-
John Wiley and Sons, New York, NY
-
Bedworth, D. D. and Bailey, J. E., Integrated Production Control Systems: Management, Analysis, Design, 2nd edn. John Wiley and Sons, New York, NY, 1987, pp. 387-420.
-
(1987)
Integrated Production Control Systems: Management, Analysis, Design, 2nd Edn.
, pp. 387-420
-
-
Bedworth, D.D.1
Bailey, J.E.2
-
12
-
-
0000722156
-
A comment on Edie's traffic delays at toll booths
-
Dantzig, G. B., A comment on Edie's traffic delays at toll booths. Operations Research, 1954, 2, 339-341.
-
(1954)
Operations Research
, vol.2
, pp. 339-341
-
-
Dantzig, G.B.1
-
13
-
-
0015404282
-
Optimal scheduling of two consecutive idle periods
-
Tiberwala, R., Philippe, D. and Browne, J., Optimal scheduling of two consecutive idle periods. Management Science, 1972, 19, 71-75.
-
(1972)
Management Science
, vol.19
, pp. 71-75
-
-
Tiberwala, R.1
Philippe, D.2
Browne, J.3
-
14
-
-
0016544504
-
Manpower scheduling
-
Browne, J. E. and Tiberwala, R. K., Manpower scheduling. Industrial Engineering, 1975, 7, 22-23.
-
(1975)
Industrial Engineering
, vol.7
, pp. 22-23
-
-
Browne, J.E.1
Tiberwala, R.K.2
-
15
-
-
0016037765
-
Scheduling full-time and part-time staff to meet cyclic requirements
-
Baker, K. R., Scheduling full-time and part-time staff to meet cyclic requirements. Operational Research Quarterly, 1974, 25, 65-76.
-
(1974)
Operational Research Quarterly
, vol.25
, pp. 65-76
-
-
Baker, K.R.1
-
16
-
-
0001381381
-
The cost of consecutivity in the (5, 7) cyclic staffing problem
-
Vohra, R. V., The cost of consecutivity in the (5, 7) cyclic staffing problem. IIE Transactions, 1987, 29, 942-950.
-
(1987)
IIE Transactions
, vol.29
, pp. 942-950
-
-
Vohra, R.V.1
-
17
-
-
0017951234
-
Unnetworks, with applications to idle time scheduling
-
Bartholdi, J. J., III and Ratliff., H. D., Unnetworks, with applications to idle time scheduling. Management Science, 1978, 24, 850-858.
-
(1978)
Management Science
, vol.24
, pp. 850-858
-
-
Bartholdi J.J. III1
Ratliff, H.D.2
-
18
-
-
0019562318
-
A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering
-
Bartholdi, J. J., III., A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering. Operations Research, 1981, 29, 501-510.
-
(1981)
Operations Research
, vol.29
, pp. 501-510
-
-
Bartholdi J.J. III1
-
19
-
-
0347566854
-
An efficient two-stage algorithm for manpower days-off scheduling
-
Ann Arbor, Michigan, U.S.A., August 15-19
-
Alfares, H. K., An efficient two-stage algorithm for manpower days-off scheduling. 15th International Symposium on Mathematical Programming. Ann Arbor, Michigan, U.S.A., August 15-19, 1994.
-
(1994)
15th International Symposium on Mathematical Programming
-
-
Alfares, H.K.1
-
20
-
-
0027543260
-
A simulated annealing approach to the cyclic staff-scheduling problem
-
Brusco, M. J. and Jacobs, L. W., A simulated annealing approach to the cyclic staff-scheduling problem. Naval Research Logistics, 1993, 40, 69-84.
-
(1993)
Naval Research Logistics
, vol.40
, pp. 69-84
-
-
Brusco, M.J.1
Jacobs, L.W.2
|