메뉴 건너뛰기




Volumn 55, Issue 2, 2008, Pages 329-337

Critical path analysis with fuzzy activity times

Author keywords

Critical path analysis; Fuzzy sets; Mathematical programming; Project management; Project scheduling

Indexed keywords

CRITICAL PATH ANALYSIS; FUZZY LOGIC; FUZZY SETS; MATHEMATICAL PROGRAMMING; PERT; PROJECT MANAGEMENT; SCHEDULING;

EID: 43749100945     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2008.919678     Document Type: Article
Times cited : (23)

References (33)
  • 2
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • S. Chanas and P. Zielinski, "Critical path analysis in the network with fuzzy activity times," Fuzzy Sets Syst., vol. 123, pp. 195-204, 2001.
    • (2001) Fuzzy Sets Syst , vol.123 , pp. 195-204
    • Chanas, S.1    Zielinski, P.2
  • 3
    • 0036466460 scopus 로고    scopus 로고
    • The computational complexity of the criticality problems in a network with interval activity times
    • S. Chanas and P. Zielinski, "The computational complexity of the criticality problems in a network with interval activity times," Eur. J. Oper. Res., vol. 136, pp. 541-550, 2002.
    • (2002) Eur. J. Oper. Res , vol.136 , pp. 541-550
    • Chanas, S.1    Zielinski, P.2
  • 4
    • 0036683729 scopus 로고    scopus 로고
    • On the sure criticality of tasks in activity networks with imprecise durations
    • Aug
    • S. Chanas, D. Dubois, and P. Zielinski, "On the sure criticality of tasks in activity networks with imprecise durations," IEEE Trans. Syst., Man, Cybern. II, vol. 32, no. 4. pp. 393-407, Aug. 2002.
    • (2002) IEEE Trans. Syst., Man, Cybern. II , vol.32 , Issue.4 , pp. 393-407
    • Chanas, S.1    Dubois, D.2    Zielinski, P.3
  • 5
    • 0003745647 scopus 로고
    • Fuzzy multiple atttribute decision making: Methods and applications
    • Berlin, Germany: Springer-Verlag
    • S. Chen and C. Hwang, "Fuzzy multiple atttribute decision making: Methods and applications," in Lecture Notes in Economics and Mathematical Systems. Berlin, Germany: Springer-Verlag, 1992.
    • (1992) Lecture Notes in Economics and Mathematical Systems
    • Chen, S.1    Hwang, C.2
  • 7
    • 0037410243 scopus 로고    scopus 로고
    • On the latest starting times and floats in activity network with ill-known durations
    • D. Dubois, H. Fargier, and V. Galvagnon, "On the latest starting times and floats in activity network with ill-known durations," Eur. J. Oper. Res., vol. 147, pp. 266-280, 2003a.
    • (2003) Eur. J. Oper. Res , vol.147 , pp. 266-280
    • Dubois, D.1    Fargier, H.2    Galvagnon, V.3
  • 8
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge
    • D. Dubois, H. Fargier, and P. Fortemps, "Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge," Eur. J. Oper. Res., vol. 147, pp. 231-252, 2003.
    • (2003) Eur. J. Oper. Res , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 10
    • 0032273138 scopus 로고    scopus 로고
    • Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations
    • A. A. Fernandez, R. L. Armacost, and J. J. Pet-Edwards, "Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations," Eng. Manag. J., vol. 10, no. 4, pp. 5-13, 1998.
    • (1998) Eng. Manag. J , vol.10 , Issue.4 , pp. 5-13
    • Fernandez, A.A.1    Armacost, R.L.2    Pet-Edwards, J.J.3
  • 11
    • 33748958790 scopus 로고    scopus 로고
    • Project schedule risk analysis: Monte Carlo simulation or PERT?
    • D. Hulett, "Project schedule risk analysis: Monte Carlo simulation or PERT?," PM Netw., vol. 14, no. 2, pp. 43-47, 2000.
    • (2000) PM Netw , vol.14 , Issue.2 , pp. 43-47
    • Hulett, D.1
  • 12
    • 43749094630 scopus 로고    scopus 로고
    • ILOG, CA: Mountain View
    • ILOG, CPLEX 9.0. CA: Mountain View, 2005.
    • (2005) CPLEX 9.0
  • 13
    • 43749112624 scopus 로고    scopus 로고
    • Risk management - Why?
    • E. Jones, "Risk management - Why?," PM Netw., vol. 14, no. 2, pp. 39-42, 2000.
    • (2000) PM Netw , vol.14 , Issue.2 , pp. 39-42
    • Jones, E.1
  • 14
    • 0001996360 scopus 로고
    • Fuzzy activity duration times in critical path analysis
    • New Delhi, India
    • J. Kamburowski, "Fuzzy activity duration times in critical path analysis," in Proc. Int. Symp. Project Manag., New Delhi, India, 1983, pp. 194-199.
    • (1983) Proc. Int. Symp. Project Manag , pp. 194-199
    • Kamburowski, J.1
  • 15
    • 0001620447 scopus 로고
    • Critical path planning and scheduling - Mathematical basis
    • J. Kelley, "Critical path planning and scheduling - Mathematical basis," Oper. Res., vol. 9, pp. 296-320, 1961.
    • (1961) Oper. Res , vol.9 , pp. 296-320
    • Kelley, J.1
  • 17
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB: A project scheduling library
    • R. Kolische and A. Sprecher, "PSPLIB: A project scheduling library," Eur. J. Oper. Res., vol. 96, pp. 205-216, 1996.
    • (1996) Eur. J. Oper. Res , vol.96 , pp. 205-216
    • Kolische, R.1    Sprecher, A.2
  • 19
    • 0024770103 scopus 로고
    • Stochastic and fuzzy PERT
    • F. A. Lootsma, "Stochastic and fuzzy PERT," Eur. J. Oper. Res., vol. 43, pp. 174-183, 1989.
    • (1989) Eur. J. Oper. Res , vol.43 , pp. 174-183
    • Lootsma, F.A.1
  • 20
    • 0000732919 scopus 로고    scopus 로고
    • Project-network analysis using fuzzy sets theory
    • P. Lorterapong and O. Moselhi, "Project-network analysis using fuzzy sets theory," J. Constr. Eng. Manag., vol. 122, no. 4, pp. 308-318, 1996.
    • (1996) J. Constr. Eng. Manag , vol.122 , Issue.4 , pp. 308-318
    • Lorterapong, P.1    Moselhi, O.2
  • 21
    • 0001501655 scopus 로고
    • Application of a technique for research and development project evaluation
    • D. Malcolm, J. Rosenboom, C. Clark, and W. Fazar, "Application of a technique for research and development project evaluation," Oper. Res., vol. 7, pp. 646-669, 1959.
    • (1959) Oper. Res , vol.7 , pp. 646-669
    • Malcolm, D.1    Rosenboom, J.2    Clark, C.3    Fazar, W.4
  • 22
    • 0028196145 scopus 로고
    • Fuzzy critical path method
    • Jan
    • S. Nasution, "Fuzzy critical path method," IEEE Trans. Syst., Man, Cybern., vol. 24, no. 1. pp. 48-57, Jan. 1994.
    • (1994) IEEE Trans. Syst., Man, Cybern , vol.24 , Issue.1 , pp. 48-57
    • Nasution, S.1
  • 23
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • J. H. Patterson, "A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem," Manag. Sci., vol. 30, no. 7, pp. 854-867, 1984.
    • (1984) Manag. Sci , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 25
    • 0028528165 scopus 로고
    • Network analysis and information flow in fuzzy environment
    • H. J. Rommelfanger, "Network analysis and information flow in fuzzy environment," Fuzzy Sets Syst., vol. 67, pp. 119-128, 1994.
    • (1994) Fuzzy Sets Syst , vol.67 , pp. 119-128
    • Rommelfanger, H.J.1
  • 26
    • 0001918185 scopus 로고    scopus 로고
    • Risk management: The undiscovered dimension of project management
    • P. Royer, "Risk management: The undiscovered dimension of project management," Project Manag. J., vol. 31, no. 1, pp. 6-13, 2000.
    • (2000) Project Manag. J , vol.31 , Issue.1 , pp. 6-13
    • Royer, P.1
  • 27
    • 33751544819 scopus 로고    scopus 로고
    • Using unders to offset overs
    • A. Ruskin, "Using unders to offset overs," PM Netw., vol. 14, no. 2, pp. 31-37, 2000.
    • (2000) PM Netw , vol.14 , Issue.2 , pp. 31-37
    • Ruskin, A.1
  • 28
    • 0348167521 scopus 로고    scopus 로고
    • On the optimal management of project risk
    • L. V. Tavares, J. A. Ferreira, and J. S. Coelho, "On the optimal management of project risk," Eur. J. Oper. Res., vol. 107, pp. 451-469, 1998.
    • (1998) Eur. J. Oper. Res , vol.107 , pp. 451-469
    • Tavares, L.V.1    Ferreira, J.A.2    Coelho, J.S.3
  • 29
    • 0033524327 scopus 로고    scopus 로고
    • Statistical dependence in risk analysis for project networks using Monte Carlo methods
    • J. R. Van Dorp and M. R. Duffey, "Statistical dependence in risk analysis for project networks using Monte Carlo methods," Int. J. Prod. Econ., vol. 58, pp. 17-29, 1999.
    • (1999) Int. J. Prod. Econ , vol.58 , pp. 17-29
    • Van Dorp, J.R.1    Duffey, M.R.2
  • 30
    • 0000023481 scopus 로고
    • A characterization of the extension principle
    • R. Yager, "A characterization of the extension principle," Fuzzy Sets Syst., vol. 18, pp. 205-217, 1986.
    • (1986) Fuzzy Sets Syst , vol.18 , pp. 205-217
    • Yager, R.1
  • 32
    • 0002117495 scopus 로고
    • Calculus of fuzzy restrictions
    • L. A. Zadeh, K. S. Fu, K. Tanaka, and J. Shimara, Eds. New York: Academic
    • L. Zadeh, "Calculus of fuzzy restrictions," in Fuzzy Sets and Their Application to Cognitive and Decision Processes, L. A. Zadeh, K. S. Fu, K. Tanaka, and J. Shimara, Eds. New York: Academic, 1975, pp. 1-39.
    • (1975) Fuzzy Sets and Their Application to Cognitive and Decision Processes , pp. 1-39
    • Zadeh, L.1
  • 33
    • 11144288983 scopus 로고    scopus 로고
    • On computing the latest starting times and floats of activities in a network with imprecise durations
    • P. Zielinski, "On computing the latest starting times and floats of activities in a network with imprecise durations," Fuzzy Sets Syst. vol. 150, pp. 53-76, 2005.
    • (2005) Fuzzy Sets Syst , vol.150 , pp. 53-76
    • Zielinski, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.