-
1
-
-
0000308975
-
Discrete fuzzy optimization
-
R. Slowinski, Ed. Boston, MA: Kluwer, ch. 8
-
C. Chanas and D. Kuchta, "Discrete fuzzy optimization," in Fuzzy Sets in Decision Analysis, Operations Research and Statistics, R. Slowinski, Ed. Boston, MA: Kluwer, 1998, pp. 249-280, ch. 8.
-
(1998)
Fuzzy Sets in Decision Analysis, Operations Research and Statistics
, pp. 249-280
-
-
Chanas, C.1
Kuchta, D.2
-
2
-
-
0035885517
-
Critical path analysis in the network with fuzzy activity times
-
S. Chanas and P. Zielinski, "Critical path analysis in the network with fuzzy activity times," Fuzzy Sets Syst., vol. 123, pp. 195-204, 2001.
-
(2001)
Fuzzy Sets Syst
, vol.123
, pp. 195-204
-
-
Chanas, S.1
Zielinski, P.2
-
3
-
-
0036466460
-
The computational complexity of the criticality problems in a network with interval activity times
-
S. Chanas and P. Zielinski, "The computational complexity of the criticality problems in a network with interval activity times," Eur. J. Oper. Res., vol. 136, pp. 541-550, 2002.
-
(2002)
Eur. J. Oper. Res
, vol.136
, pp. 541-550
-
-
Chanas, S.1
Zielinski, P.2
-
4
-
-
0036683729
-
On the sure criticality of tasks in activity networks with imprecise durations
-
Aug
-
S. Chanas, D. Dubois, and P. Zielinski, "On the sure criticality of tasks in activity networks with imprecise durations," IEEE Trans. Syst., Man, Cybern. II, vol. 32, no. 4. pp. 393-407, Aug. 2002.
-
(2002)
IEEE Trans. Syst., Man, Cybern. II
, vol.32
, Issue.4
, pp. 393-407
-
-
Chanas, S.1
Dubois, D.2
Zielinski, P.3
-
5
-
-
0003745647
-
Fuzzy multiple atttribute decision making: Methods and applications
-
Berlin, Germany: Springer-Verlag
-
S. Chen and C. Hwang, "Fuzzy multiple atttribute decision making: Methods and applications," in Lecture Notes in Economics and Mathematical Systems. Berlin, Germany: Springer-Verlag, 1992.
-
(1992)
Lecture Notes in Economics and Mathematical Systems
-
-
Chen, S.1
Hwang, C.2
-
7
-
-
0037410243
-
On the latest starting times and floats in activity network with ill-known durations
-
D. Dubois, H. Fargier, and V. Galvagnon, "On the latest starting times and floats in activity network with ill-known durations," Eur. J. Oper. Res., vol. 147, pp. 266-280, 2003a.
-
(2003)
Eur. J. Oper. Res
, vol.147
, pp. 266-280
-
-
Dubois, D.1
Fargier, H.2
Galvagnon, V.3
-
8
-
-
0037410423
-
Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge
-
D. Dubois, H. Fargier, and P. Fortemps, "Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge," Eur. J. Oper. Res., vol. 147, pp. 231-252, 2003.
-
(2003)
Eur. J. Oper. Res
, vol.147
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
9
-
-
0033713684
-
Fuzzy PERT, in series-parallel graphs
-
San Antonio, TX
-
H. Fargier, V. Galvagnon, and D. Dubois, "Fuzzy PERT, in series-parallel graphs," in Proc. 9th IEEE Int. Conf. Fuzzy Syst. San Antonio, TX, 2000, pp. 717-722.
-
(2000)
Proc. 9th IEEE Int. Conf. Fuzzy Syst
, pp. 717-722
-
-
Fargier, H.1
Galvagnon, V.2
Dubois, D.3
-
10
-
-
0032273138
-
Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations
-
A. A. Fernandez, R. L. Armacost, and J. J. Pet-Edwards, "Understanding simulation solutions to resource constrained project scheduling problems with stochastic task durations," Eng. Manag. J., vol. 10, no. 4, pp. 5-13, 1998.
-
(1998)
Eng. Manag. J
, vol.10
, Issue.4
, pp. 5-13
-
-
Fernandez, A.A.1
Armacost, R.L.2
Pet-Edwards, J.J.3
-
11
-
-
33748958790
-
Project schedule risk analysis: Monte Carlo simulation or PERT?
-
D. Hulett, "Project schedule risk analysis: Monte Carlo simulation or PERT?," PM Netw., vol. 14, no. 2, pp. 43-47, 2000.
-
(2000)
PM Netw
, vol.14
, Issue.2
, pp. 43-47
-
-
Hulett, D.1
-
12
-
-
43749094630
-
-
ILOG, CA: Mountain View
-
ILOG, CPLEX 9.0. CA: Mountain View, 2005.
-
(2005)
CPLEX 9.0
-
-
-
13
-
-
43749112624
-
Risk management - Why?
-
E. Jones, "Risk management - Why?," PM Netw., vol. 14, no. 2, pp. 39-42, 2000.
-
(2000)
PM Netw
, vol.14
, Issue.2
, pp. 39-42
-
-
Jones, E.1
-
14
-
-
0001996360
-
Fuzzy activity duration times in critical path analysis
-
New Delhi, India
-
J. Kamburowski, "Fuzzy activity duration times in critical path analysis," in Proc. Int. Symp. Project Manag., New Delhi, India, 1983, pp. 194-199.
-
(1983)
Proc. Int. Symp. Project Manag
, pp. 194-199
-
-
Kamburowski, J.1
-
15
-
-
0001620447
-
Critical path planning and scheduling - Mathematical basis
-
J. Kelley, "Critical path planning and scheduling - Mathematical basis," Oper. Res., vol. 9, pp. 296-320, 1961.
-
(1961)
Oper. Res
, vol.9
, pp. 296-320
-
-
Kelley, J.1
-
17
-
-
0030788844
-
PSPLIB: A project scheduling library
-
R. Kolische and A. Sprecher, "PSPLIB: A project scheduling library," Eur. J. Oper. Res., vol. 96, pp. 205-216, 1996.
-
(1996)
Eur. J. Oper. Res
, vol.96
, pp. 205-216
-
-
Kolische, R.1
Sprecher, A.2
-
19
-
-
0024770103
-
Stochastic and fuzzy PERT
-
F. A. Lootsma, "Stochastic and fuzzy PERT," Eur. J. Oper. Res., vol. 43, pp. 174-183, 1989.
-
(1989)
Eur. J. Oper. Res
, vol.43
, pp. 174-183
-
-
Lootsma, F.A.1
-
20
-
-
0000732919
-
Project-network analysis using fuzzy sets theory
-
P. Lorterapong and O. Moselhi, "Project-network analysis using fuzzy sets theory," J. Constr. Eng. Manag., vol. 122, no. 4, pp. 308-318, 1996.
-
(1996)
J. Constr. Eng. Manag
, vol.122
, Issue.4
, pp. 308-318
-
-
Lorterapong, P.1
Moselhi, O.2
-
21
-
-
0001501655
-
Application of a technique for research and development project evaluation
-
D. Malcolm, J. Rosenboom, C. Clark, and W. Fazar, "Application of a technique for research and development project evaluation," Oper. Res., vol. 7, pp. 646-669, 1959.
-
(1959)
Oper. Res
, vol.7
, pp. 646-669
-
-
Malcolm, D.1
Rosenboom, J.2
Clark, C.3
Fazar, W.4
-
22
-
-
0028196145
-
Fuzzy critical path method
-
Jan
-
S. Nasution, "Fuzzy critical path method," IEEE Trans. Syst., Man, Cybern., vol. 24, no. 1. pp. 48-57, Jan. 1994.
-
(1994)
IEEE Trans. Syst., Man, Cybern
, vol.24
, Issue.1
, pp. 48-57
-
-
Nasution, S.1
-
23
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
J. H. Patterson, "A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem," Manag. Sci., vol. 30, no. 7, pp. 854-867, 1984.
-
(1984)
Manag. Sci
, vol.30
, Issue.7
, pp. 854-867
-
-
Patterson, J.H.1
-
25
-
-
0028528165
-
Network analysis and information flow in fuzzy environment
-
H. J. Rommelfanger, "Network analysis and information flow in fuzzy environment," Fuzzy Sets Syst., vol. 67, pp. 119-128, 1994.
-
(1994)
Fuzzy Sets Syst
, vol.67
, pp. 119-128
-
-
Rommelfanger, H.J.1
-
26
-
-
0001918185
-
Risk management: The undiscovered dimension of project management
-
P. Royer, "Risk management: The undiscovered dimension of project management," Project Manag. J., vol. 31, no. 1, pp. 6-13, 2000.
-
(2000)
Project Manag. J
, vol.31
, Issue.1
, pp. 6-13
-
-
Royer, P.1
-
27
-
-
33751544819
-
Using unders to offset overs
-
A. Ruskin, "Using unders to offset overs," PM Netw., vol. 14, no. 2, pp. 31-37, 2000.
-
(2000)
PM Netw
, vol.14
, Issue.2
, pp. 31-37
-
-
Ruskin, A.1
-
28
-
-
0348167521
-
On the optimal management of project risk
-
L. V. Tavares, J. A. Ferreira, and J. S. Coelho, "On the optimal management of project risk," Eur. J. Oper. Res., vol. 107, pp. 451-469, 1998.
-
(1998)
Eur. J. Oper. Res
, vol.107
, pp. 451-469
-
-
Tavares, L.V.1
Ferreira, J.A.2
Coelho, J.S.3
-
29
-
-
0033524327
-
Statistical dependence in risk analysis for project networks using Monte Carlo methods
-
J. R. Van Dorp and M. R. Duffey, "Statistical dependence in risk analysis for project networks using Monte Carlo methods," Int. J. Prod. Econ., vol. 58, pp. 17-29, 1999.
-
(1999)
Int. J. Prod. Econ
, vol.58
, pp. 17-29
-
-
Van Dorp, J.R.1
Duffey, M.R.2
-
30
-
-
0000023481
-
A characterization of the extension principle
-
R. Yager, "A characterization of the extension principle," Fuzzy Sets Syst., vol. 18, pp. 205-217, 1986.
-
(1986)
Fuzzy Sets Syst
, vol.18
, pp. 205-217
-
-
Yager, R.1
-
31
-
-
0003515853
-
-
Upper Saddle River, NJ: Prentice Hall
-
J. Yen and R. Langari, Fuzzy Logic: Intelligence, Control, and Information. Upper Saddle River, NJ: Prentice Hall, 1999.
-
(1999)
Fuzzy Logic: Intelligence, Control, and Information
-
-
Yen, J.1
Langari, R.2
-
32
-
-
0002117495
-
Calculus of fuzzy restrictions
-
L. A. Zadeh, K. S. Fu, K. Tanaka, and J. Shimara, Eds. New York: Academic
-
L. Zadeh, "Calculus of fuzzy restrictions," in Fuzzy Sets and Their Application to Cognitive and Decision Processes, L. A. Zadeh, K. S. Fu, K. Tanaka, and J. Shimara, Eds. New York: Academic, 1975, pp. 1-39.
-
(1975)
Fuzzy Sets and Their Application to Cognitive and Decision Processes
, pp. 1-39
-
-
Zadeh, L.1
-
33
-
-
11144288983
-
On computing the latest starting times and floats of activities in a network with imprecise durations
-
P. Zielinski, "On computing the latest starting times and floats of activities in a network with imprecise durations," Fuzzy Sets Syst. vol. 150, pp. 53-76, 2005.
-
(2005)
Fuzzy Sets Syst
, vol.150
, pp. 53-76
-
-
Zielinski, P.1
|