메뉴 건너뛰기




Volumn , Issue , 2007, Pages

Improved merit order and augmented Lagrange Hopfield network for ramp rate and transmission constrained unit commitment

Author keywords

Augmented Lagrange Hopfield neural network; Heuristic search; Merit order; Ramp rate and transmission constrained unit commitment

Indexed keywords

COSTS; GENETIC ALGORITHMS; HEURISTIC METHODS; POWER TRANSMISSION;

EID: 42549147868     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2007.385925     Document Type: Conference Paper
Times cited : (17)

References (30)
  • 2
    • 0026153944 scopus 로고
    • The application of commitment utilization factor (CUF) to thermal unit commitments
    • May
    • F. N. Lee, "The application of commitment utilization factor (CUF) to thermal unit commitments." IEEE Trans. Power Systems, vol. 6. no. 2, pp. 691-698, May 1991.
    • (1991) IEEE Trans. Power Systems , vol.6 , Issue.2 , pp. 691-698
    • Lee, F.N.1
  • 3
    • 0026173024 scopus 로고
    • Short-term unit commitment with simplified economic dispatch
    • Jun
    • C. L. Chen and S. L. Chen, "Short-term unit commitment with simplified economic dispatch," Electric Power Systems Research pp. 115-120, Jun. 1991.
    • (1991) Electric Power Systems Research , pp. 115-120
    • Chen, C.L.1    Chen, S.L.2
  • 4
    • 0018032040 scopus 로고
    • Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination
    • Nov./Dec
    • T. S. Dillon, K. W. Edwin, H. D. Kochs, and R. J. Taud, "Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination," IEEE Trans. Power App. Syst., vol. PAS-97, pp. 2154-2166, Nov./Dec. 1978.
    • (1978) IEEE Trans. Power App. Syst , vol.PAS-97 , pp. 2154-2166
    • Dillon, T.S.1    Edwin, K.W.2    Kochs, H.D.3    Taud, R.J.4
  • 5
    • 0031076834 scopus 로고    scopus 로고
    • Short-term resource scheduling with ramp rate constraints
    • Feb
    • A. J. Svoboda, C.-L. Tseng, C. A. Li, and R. B. Johnson. "Short-term resource scheduling with ramp rate constraints," IEEE Trans. Power Systems, vol. 12, no. 1, pp. 77-83, Feb. 1997.
    • (1997) IEEE Trans. Power Systems , vol.12 , Issue.1 , pp. 77-83
    • Svoboda, A.J.1    Tseng, C.-L.2    Li, C.A.3    Johnson, R.B.4
  • 6
    • 1442264390 scopus 로고    scopus 로고
    • Unit commitment by enhanced adaptive Lagrangian relaxation
    • Feb
    • W. Ongsakul and N. Petcharaks, "Unit commitment by enhanced adaptive Lagrangian relaxation," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 620-628, Feb. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.1 , pp. 620-628
    • Ongsakul, W.1    Petcharaks, N.2
  • 7
    • 0026908034 scopus 로고
    • A solution method of unit commitment by artificial neural networks
    • Aug
    • H. Sasaki, M. Watanabe, R. Yokoyama, "A solution method of unit commitment by artificial neural networks," IEEE Trans. Power Systems, vol. 7, no. 3, pp. 974-981, Aug. 1992.
    • (1992) IEEE Trans. Power Systems , vol.7 , Issue.3 , pp. 974-981
    • Sasaki, H.1    Watanabe, M.2    Yokoyama, R.3
  • 8
    • 0031999302 scopus 로고    scopus 로고
    • A simulated annealing algorithm for unit commitment
    • Feb
    • A. H. Mantawy, Y. L. Abdel-Magid, and S. Z. Selim, "A simulated annealing algorithm for unit commitment," IEEE Trans. Power Systems, vol. 13, no. 1, pp. 197-204, Feb. 1998.
    • (1998) IEEE Trans. Power Systems , vol.13 , Issue.1 , pp. 197-204
    • Mantawy, A.H.1    Abdel-Magid, Y.L.2    Selim, S.Z.3
  • 10
    • 0030082567 scopus 로고    scopus 로고
    • A genetic algorithm solution to the unit commitment problem
    • Feb
    • S. A. Kazarlis, A. G. Bakirtzis, and V. Petridis, "A genetic algorithm solution to the unit commitment problem." IEEE Trans. Power Systems, vol. 11, no. 1, pp. 83-92, Feb. 1996.
    • (1996) IEEE Trans. Power Systems , vol.11 , Issue.1 , pp. 83-92
    • Kazarlis, S.A.1    Bakirtzis, A.G.2    Petridis, V.3
  • 11
    • 0033222003 scopus 로고    scopus 로고
    • An evolutionary programming solution to the unit commitment problem
    • Nov
    • K. A. Juste, H. Kita, E. Tanaka, and J. Hasegawa. "An evolutionary programming solution to the unit commitment problem," IEEE Trans. Power Systems, vol. 14, no. 4, pp. 1452-1459, Nov. 1999.
    • (1999) IEEE Trans. Power Systems , vol.14 , Issue.4 , pp. 1452-1459
    • Juste, K.A.1    Kita, H.2    Tanaka, E.3    Hasegawa, J.4
  • 12
    • 0034186815 scopus 로고    scopus 로고
    • Unit commitment by Lagrange relaxation and genetic algorithms
    • May
    • C. P. Cheng, C. W. Liu, and C. C. Liu, "Unit commitment by Lagrange relaxation and genetic algorithms." IEEE Trans. Power Systems, vol. 15, no. 2, pp. 707-714, May 2000.
    • (2000) IEEE Trans. Power Systems , vol.15 , Issue.2 , pp. 707-714
    • Cheng, C.P.1    Liu, C.W.2    Liu, C.C.3
  • 13
    • 1442288866 scopus 로고    scopus 로고
    • An evolutionary programming-based tabu search method for solving the unit commitment problem
    • Feb
    • C. C. A. Rajan and M. R. Mohan, "An evolutionary programming-based tabu search method for solving the unit commitment problem," IEEE Trans. Power Systems, vol. 19, no. 1, pp. 577-585, Feb. 2004.
    • (2004) IEEE Trans. Power Systems , vol.19 , Issue.1 , pp. 577-585
    • Rajan, C.C.A.1    Mohan, M.R.2
  • 14
    • 0038723185 scopus 로고    scopus 로고
    • Neural-based tabu search method for solving unit commitment problem
    • July
    • C. C. A. Rajan, M. R. Mohan, and K. Manivannan, "Neural-based tabu search method for solving unit commitment problem," IEE Proc. Gener., Transm. Distrib., vol. 150, no. 4, pp. 469-474, July 2003.
    • (2003) IEE Proc. Gener., Transm. Distrib , vol.150 , Issue.4 , pp. 469-474
    • Rajan, C.C.A.1    Mohan, M.R.2    Manivannan, K.3
  • 15
    • 33746484868 scopus 로고    scopus 로고
    • Schedule electric power generators using particle swarm optimization combined with the Lagrangian relaxation method
    • H. H. Balci, J. F. Valenzuela, "Schedule electric power generators using particle swarm optimization combined with the Lagrangian relaxation method," Int. J. Appl. Math. Compul. Sci., vol. 14, no. 3, pp. 411-421, 2004.
    • (2004) Int. J. Appl. Math. Compul. Sci , vol.14 , Issue.3 , pp. 411-421
    • Balci, H.H.1    Valenzuela, J.F.2
  • 17
    • 51549092326 scopus 로고    scopus 로고
    • Transmission and ramp constrained unit commitment using enhanced adaptive Lagrangian relaxation
    • St. Petersburg, Russia, June 27-30
    • W. Ongsakul and N. Petcharaks, "Transmission and ramp constrained unit commitment using enhanced adaptive Lagrangian relaxation," in Proc. 2005 IEEE St. Petersburg PowerTech, St. Petersburg, Russia, June 27-30, 2005.
    • (2005) Proc. 2005 IEEE St. Petersburg PowerTech
    • Ongsakul, W.1    Petcharaks, N.2
  • 18
    • 0035518675 scopus 로고    scopus 로고
    • Advanced hybrid genetic algorithm for short term generation scheduling
    • Nov
    • A. A. El Desouky, R. Aggarwal, M. M. Elkateb, and F. Li, "Advanced hybrid genetic algorithm for short term generation scheduling," IEE Proc. Gener. Trans. Distrib., vol 48, no. 6, pp. 511-517, Nov. 2001.
    • (2001) IEE Proc. Gener. Trans. Distrib , vol.48 , Issue.6 , pp. 511-517
    • El Desouky, A.A.1    Aggarwal, R.2    Elkateb, M.M.3    Li, F.4
  • 20
    • 42549138064 scopus 로고    scopus 로고
    • Improved merit order and augmented Lagrange Hopfield network for unit commitment
    • accepted for publication in
    • V. N. Dieu and W. Ongsakul, "Improved merit order and augmented Lagrange Hopfield network for unit commitment," accepted for publication in IEE Proc. Gener., Transm. Distrib.
    • IEE Proc. Gener., Transm. Distrib
    • Dieu, V.N.1    Ongsakul, W.2
  • 22
    • 0027646289 scopus 로고
    • Economic load dispatch for piecewise quadratic cost function using Hopfield neural network
    • August
    • J. H. Park, Y. S. Kim. I. K. Eom, and K. Y. Lee, "Economic load dispatch for piecewise quadratic cost function using Hopfield neural network", IEEE Trans. Power Syst., vol. 8, no. 3, August 1993, pp. 1030 - 1038.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.3 , pp. 1030-1038
    • Park, J.H.1    Kim, Y.S.2    Eom, I.K.3    Lee, K.Y.4
  • 23
    • 33750160576 scopus 로고    scopus 로고
    • Enhanced augmented Lagrangian Hopfield network for unit commitment
    • Nov
    • V. N. Dieu and W. Ongsakul, "Enhanced augmented Lagrangian Hopfield network for unit commitment." IEE Proc. Gener., Transm. Distrib., vol. 153, no. 6, pp. 624-632, Nov. 2006.
    • (2006) IEE Proc. Gener., Transm. Distrib , vol.153 , Issue.6 , pp. 624-632
    • Dieu, V.N.1    Ongsakul, W.2
  • 24
    • 42549147868 scopus 로고    scopus 로고
    • Enhanced merit order and augmented Lagrange Hopfield network for ramp rate constrained unit commitment
    • Montreal, Canada, Jun
    • V. N. Dieu and W. Ongsakul, "Enhanced merit order and augmented Lagrange Hopfield network for ramp rate constrained unit commitment," in Proc. IEEE Power System Society General Meeting, Montreal, Canada, Jun. 2006.
    • (2006) Proc. IEEE Power System Society General Meeting
    • Dieu, V.N.1    Ongsakul, W.2
  • 25
    • 0019541396 scopus 로고
    • Generalized generation distribution factors for power system security evaluations
    • Nov./Dec
    • Wai Y. Ng, "Generalized generation distribution factors for power system security evaluations," Power Systems, vol. PAS-100, no. 3, pp. 1001-1005, Nov./Dec. 1981.
    • (1981) Power Systems , vol.PAS-100 , Issue.3 , pp. 1001-1005
    • Ng, W.Y.1
  • 27
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • IEEE Reliability Test System Task Force, Nov./Dec
    • IEEE Reliability Test System Task Force, "IEEE Reliability Test System," IEEE Trans. Power Systems, vol. PAS-98, no. 6, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans. Power Systems , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 28
    • 0027647348 scopus 로고
    • Effects of ramp rate limits on unit commitment and economic dispatch
    • Aug
    • C. Wang and S. M. Shahidehpour, "Effects of ramp rate limits on unit commitment and economic dispatch," IEEE Trans. Power Systems, vol. 8, no. 3, pp. 1341-1350, Aug. 1993.
    • (1993) IEEE Trans. Power Systems , vol.8 , Issue.3 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 29
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission with transmission and environmental constraints using an augmented Lagrangian relaxation
    • Aug
    • S. J. Wang, S. M. Shalhidehpour, D. S. Kirschen, S. Mokhtari, and G. D. Irisarri, "Short-term generation scheduling with transmission with transmission and environmental constraints using an augmented Lagrangian relaxation", IEEE Trans. Power Systems, vol. 10, no. 3, pp. 1294-1301, Aug. 1995.
    • (1995) IEEE Trans. Power Systems , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shalhidehpour, S.M.2    Kirschen, D.S.3    Mokhtari, S.4    Irisarri, G.D.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.