메뉴 건너뛰기




Volumn 19, Issue 1, 2004, Pages 620-628

Unit Commitment by Enhanced Adaptive Lagrangian Relaxation

Author keywords

Heuristic search; Lagrangian relaxation; Unit commitment

Indexed keywords

COSTS; ELECTRIC GENERATORS; EVOLUTIONARY ALGORITHMS; GENETIC ALGORITHMS; HEURISTIC METHODS; LAGRANGE MULTIPLIERS; POWER GENERATION; PROBLEM SOLVING;

EID: 1442264390     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2003.820707     Document Type: Article
Times cited : (464)

References (23)
  • 2
    • 0020750196 scopus 로고
    • A new method for unit commitment at Electricite De France
    • May
    • A. Merlin and P. Sandrin, "A new method for unit commitment at Electricite De France," IEEE Trans. Power App. Syst., vol. PAS-102, pp. 1218-1225, May 1983.
    • (1983) IEEE Trans. Power App. Syst. , vol.PAS-102 , pp. 1218-1225
    • Merlin, A.1    Sandrin, P.2
  • 3
    • 0024765474 scopus 로고
    • Implementation of a Lagrangian relaxation based unit commitment problem
    • Oct.
    • S. Virmani, K. Imhof, and S. M. Jee, "Implementation of a Lagrangian relaxation based unit commitment problem," IEEE Trans. Power Syst., vol. 4, pp. 1373-1379, Oct. 1989.
    • (1989) IEEE Trans. Power Syst. , vol.4 , pp. 1373-1379
    • Virmani, S.1    Imhof, K.2    Jee, S.M.3
  • 4
    • 0032140597 scopus 로고    scopus 로고
    • A robust unit commitment algorithm for hydro-thermal optimization
    • Aug.
    • C. Li, R. B. Johnson, A. J. Svoboda, C. Tseng, and E. Hsu, "A robust unit commitment algorithm for hydro-thermal optimization," IEEE Trans. Power Syst., vol 13, pp. 1051-1056, Aug. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 1051-1056
    • Li, C.1    Johnson, R.B.2    Svoboda, A.J.3    Tseng, C.4    Hsu, E.5
  • 5
    • 0033079889 scopus 로고    scopus 로고
    • Short-term hydro-thermal coordination by Lagrangian relaxation: Solution of the dual problem
    • Feb.
    • N. J. Redondo and A. J. Conejo, "Short-term hydro-thermal coordination by Lagrangian relaxation: solution of the dual problem," IEEE Trans. Power Syst., vol. 14, pp. 89-95, Feb. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 89-95
    • Redondo, N.J.1    Conejo, A.J.2
  • 6
    • 0028371902 scopus 로고
    • Unit commitment literature synopsis
    • Feb.
    • G. B. Sheble and G. N. Fahd, "Unit commitment literature synopsis," IEEE Trans. Power Syst., vol. 9, pp. 128-135, Feb. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , pp. 128-135
    • Sheble, G.B.1    Fahd, G.N.2
  • 7
    • 0033079512 scopus 로고    scopus 로고
    • Auction implementation problems using Lagrangian relaxation
    • Feb.
    • S. Dekrajangpetch, G. B. Sheble, and A. J. Conejo, "Auction implementation problems using Lagrangian relaxation," IEEE Trans. Power Syst., vol. 14, pp. 82-88, Feb. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 82-88
    • Dekrajangpetch, S.1    Sheble, G.B.2    Conejo, A.J.3
  • 8
    • 0028596821 scopus 로고
    • Scheduling of hydrothermal power systems using the augmented Lagrangian decomposition and coordination technique
    • H. Van, P. B. Luh, and L. Zhang, "Scheduling of hydrothermal power systems using the augmented Lagrangian decomposition and coordination technique," in Proc. Amer. Control Conf., vol. 2, 1994, pp. 1558-1562.
    • (1994) Proc. Amer. Control Conf. , vol.2 , pp. 1558-1562
    • Van, H.1    Luh, P.B.2    Zhang, L.3
  • 9
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation
    • Aug.
    • S. J. Wang, S. M. Shahidehpour, D. S. Kirschen, S. Mokhtari, and G. D. Irisarri, "Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxation," IEEE Trans. Power Syst., vol. 10, pp. 1294-1301, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, S.M.2    Kirschen, D.S.3    Mokhtari, S.4    Irisarri, G.D.5
  • 10
    • 0034244118 scopus 로고    scopus 로고
    • Optimal response of a thermal unit to an electricity spot market
    • Aug.
    • J. M. Arroyo and A. J. Conejo, "Optimal response of a thermal unit to an electricity spot market," IEEE Trans. Power Syst., vol. 15, pp. 1098-1104, Aug. 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , pp. 1098-1104
    • Arroyo, J.M.1    Conejo, A.J.2
  • 11
    • 0030087188 scopus 로고    scopus 로고
    • Short term hydro generation and interchange contract scheduling for Swiss rail
    • Feb.
    • M. Christoforidis, B. Awobamise, R. J. Frowd, and F. A. Rahimi, "Short term hydro generation and interchange contract scheduling for Swiss rail," IEEE Trans. Power Syst., vol. 11, pp. 274-280, Feb. 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , pp. 274-280
    • Christoforidis, M.1    Awobamise, B.2    Frowd, R.J.3    Rahimi, F.A.4
  • 13
    • 0030082567 scopus 로고    scopus 로고
    • A genetic algorithm solution to the unit commitment problem
    • Feb.
    • S. A. Kazarlis, A. G. Bakirtzis, and V. Petridis, "A genetic algorithm solution to the unit commitment problem," IEEE Trans. Power Syst., vol. 11, pp. 83-92, Feb. 1996.
    • (1996) IEEE Trans. Power Syst. , vol.11 , pp. 83-92
    • Kazarlis, S.A.1    Bakirtzis, A.G.2    Petridis, V.3
  • 14
    • 0033222003 scopus 로고    scopus 로고
    • An evolutionary programming solution to the unit commitment problem
    • Nov.
    • K. A. Juste, H. Kita, E. Tanaka, and J. Hasegawa, "An evolutionary programming solution to the unit commitment problem," IEEE Trans. Power Syst., vol. 14, pp. 1452-1459, Nov. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 1452-1459
    • Juste, K.A.1    Kita, H.2    Tanaka, E.3    Hasegawa, J.4
  • 15
    • 0031999302 scopus 로고    scopus 로고
    • A simulated annealing algorithm for unit commitment
    • Feb.
    • A. H. Mantawy, Y. L. Abdel-Magid, and S. Z. Selim, "A simulated annealing algorithm for unit commitment," IEEE Trans. Power Syst., vol. 13, pp. 197-204, Feb. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 197-204
    • Mantawy, A.H.1    Abdel-Magid, Y.L.2    Selim, S.Z.3
  • 16
    • 0031675472 scopus 로고    scopus 로고
    • Unit commitment by tabu search
    • Jan.
    • _, "Unit commitment by tabu search," Proc. Inst. Elect. Eng., Gen. Transm. Dist., vol. 145, pp. 56-64, Jan. 1998.
    • (1998) Proc. Inst. Elect. Eng., Gen. Transm. Dist. , vol.145 , pp. 56-64
  • 17
    • 0034186815 scopus 로고    scopus 로고
    • Unit commitment by Lagrangian relaxation and genetic algorithms
    • May
    • C. P. Cheng, C. W. Liu, and C. C. Liu, "Unit commitment by Lagrangian relaxation and genetic algorithms," IEEE Trans. Power Syst., vol. 15, pp. 707-714, May 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , pp. 707-714
    • Cheng, C.P.1    Liu, C.W.2    Liu, C.C.3
  • 18
    • 0036082248 scopus 로고    scopus 로고
    • A unit commitment problem by using genetic algorithm based on characteristic classification
    • T. Senjyu, H. Yamashiro, K. Uezato, and T. Funabashi, "A unit commitment problem by using genetic algorithm based on characteristic classification," in Proc. IEEE/Power Eng. Soc. Winter Meet., vol. 1, 2002, pp. 58-63.
    • (2002) Proc. IEEE/Power Eng. Soc. Winter Meet. , vol.1 , pp. 58-63
    • Senjyu, T.1    Yamashiro, H.2    Uezato, K.3    Funabashi, T.4
  • 19
    • 0032072749 scopus 로고    scopus 로고
    • An algorithm for solving the dual problem of hydrothermal scheduling
    • May
    • P. B. Luh, D. Zhang, and R. N. Tomastik, "An algorithm for solving the dual problem of hydrothermal scheduling," IEEE Trans. Power Syst., vol. 13, pp. 593-600, May 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 593-600
    • Luh, P.B.1    Zhang, D.2    Tomastik, R.N.3
  • 20
    • 0033221396 scopus 로고    scopus 로고
    • A bundle method for hydrothermal scheduling
    • Nov.
    • D. Zhang, P. B. Luh, and Y. Zhang, "A bundle method for hydrothermal scheduling," IEEE Trans. Power Syst., vol. 14, pp. 1355-1361, Nov. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 1355-1361
    • Zhang, D.1    Luh, P.B.2    Zhang, Y.3
  • 22
    • 0027649191 scopus 로고
    • Scheduling of hydrothermal power systems
    • Aug.
    • H. Yan, P. B. Luh, X. Guan, and P. M. Rogan, "Scheduling of hydrothermal power systems," IEEE Trans. Power Syst., vol. 8, pp. 1358-1365, Aug. 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , pp. 1358-1365
    • Yan, H.1    Luh, P.B.2    Guan, X.3    Rogan, P.M.4
  • 23
    • 0019477279 scopus 로고
    • The Lagrangian relaxation method for solving integer programming problems
    • Jan.
    • M. L. Fisher, "The Lagrangian relaxation method for solving integer programming problems," Manage. Sci., vol. 27, pp. 1-18, Jan. 1981.
    • (1981) Manage. Sci. , vol.27 , pp. 1-18
    • Fisher, M.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.