Transmission and ramp constrained unit commitment using enhanced adaptive lagrangian relaxation

Author keywords

Lagrangian relaxation; Transmission and ramp constrained unit commitment; Transmission constrained dynamic economic dispatch

Indexed keywords

BANDPASS FILTERS; COMPUTER NETWORKS; ELECTRIC LINES; LAGRANGE MULTIPLIERS; MATHEMATICAL PROGRAMMING; NONLINEAR PROGRAMMING; POWER TRANSMISSION; REPAIR; TRANSMISSION LINE THEORY;

EID: 51549092326     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PTC.2005.4524599     Document Type: Conference Paper
Times cited : (7)

References (19)
  • 2
    • 0018032040 scopus 로고
    • Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination
    • T. S. Dillon, TK. W. Edwin, H. D. Kochs, and R. J. Taud, "Integer programming approach to the problem of optimal unit commitment with probabilistic reserve determination," IEEE Trans. Power Apparatus and Systems vol. PAS-97, pp. 2154-2166, 1978.
    • (1978) IEEE Trans. Power Apparatus and Systems , vol.PAS-97 , pp. 2154-2166
    • Dillon, T.S.1    Edwin, T.W.2    Kochs, H.D.3    Taud, R.J.4
  • 3
    • 0024054074 scopus 로고
    • An enhanced dynamic programming approach for unit commitment
    • Aug
    • W. J. Hobbs, G. Hermon, S. Warner, and G. B. Sheble, "An enhanced dynamic programming approach for unit commitment," IEEE Trans. Power Sys., vol. 3, 3, pp. 1201-1205, Aug. 1988.
    • (1988) IEEE Trans. Power Sys , vol.3 , Issue.3 , pp. 1201-1205
    • Hobbs, W.J.1    Hermon, G.2    Warner, S.3    Sheble, G.B.4
  • 4
    • 0027647348 scopus 로고
    • Effects of ramp rate limits on unit commitment and economic dispatch
    • Aug
    • C. Wang and S. M. Shahidehpour, "Effects of ramp rate limits on unit commitment and economic dispatch," IEEE Trans. Power Sys., vol. 8, pp. 1341-1350, Aug.1993.
    • (1993) IEEE Trans. Power Sys , vol.8 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 5
    • 0028480021 scopus 로고
    • Ramp rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect
    • Aug
    • C. Wang and S. M. Shahidehpour, "Ramp rate limits in unit commitment and economic dispatch incorporating rotor fatigue effect," IEEE Trans. Power Sys., vol. 9, pp. 1539-1545, Aug. 1994.
    • (1994) IEEE Trans. Power Sys , vol.9 , pp. 1539-1545
    • Wang, C.1    Shahidehpour, S.M.2
  • 6
    • 0029253063 scopus 로고
    • Optimal generation scheduling with ramping costs
    • Feb
    • C. Wang and S. M. Shahidehpour, "Optimal generation scheduling with ramping costs," IEEE Trans. Power Sys., vol. 10, pp. 60-67, Feb.1995.
    • (1995) IEEE Trans. Power Sys , vol.10 , pp. 60-67
    • Wang, C.1    Shahidehpour, S.M.2
  • 7
    • 0029307071 scopus 로고
    • A capacity based Lagrangian relaxation unit commitment with ramp rate constraints
    • May
    • W. L. Peterson and S. R. Brammer, "A capacity based Lagrangian relaxation unit commitment with ramp rate constraints," IEEE Trans. on Power Sys., vol.10, pp. 1077-1084, May 1995.
    • (1995) IEEE Trans. on Power Sys , vol.10 , pp. 1077-1084
    • Peterson, W.L.1    Brammer, S.R.2
  • 8
    • 0031076834 scopus 로고    scopus 로고
    • Short term resource scheduling with ramp constraints
    • Feb
    • A. J. Svoboda, C. L. Tseng, C. Li, and R. B. Johnson, "Short term resource scheduling with ramp constraints.," IEEE Trans. Power Sys., vol. 12, pp. 77-83, Feb. 1997.
    • (1997) IEEE Trans. Power Sys , vol.12 , pp. 77-83
    • Svoboda, A.J.1    Tseng, C.L.2    Li, C.3    Johnson, R.B.4
  • 9
    • 0033079910 scopus 로고    scopus 로고
    • Unit commitment with ramp multipliers
    • Feb
    • S. Y. Lai, and R. Baldick, "Unit commitment with ramp multipliers," IEEE Trans. Power Sys., vol. 14, pp. 58-64, Feb. 1999.
    • (1999) IEEE Trans. Power Sys , vol.14 , pp. 58-64
    • Lai, S.Y.1    Baldick, R.2
  • 10
    • 0032652412 scopus 로고    scopus 로고
    • Optimal scheduling of spinning reserve with ramp constraints
    • New York, U.S.A, 31 January -4 February
    • H. Wu, and H. B. Gooi, "Optimal scheduling of spinning reserve with ramp constraints," in Proceeding of IEEE Power Engineering Society Winter Meeting. 2: New York, U.S.A., 31 January -4 February, 1999.
    • (1999) Proceeding of IEEE Power Engineering Society Winter Meeting , vol.2
    • Wu, H.1    Gooi, H.B.2
  • 13
    • 0032640594 scopus 로고    scopus 로고
    • Unit commitment with transmission security and voltage constraints
    • May
    • H. Ma, and S. M. Shahidehpour, "Unit commitment with transmission security and voltage constraints," IEEE Trans. Power Sys., vol. 14, pp. 757-764, May 1999.
    • (1999) IEEE Trans. Power Sys , vol.14 , pp. 757-764
    • Ma, H.1    Shahidehpour, S.M.2
  • 14
    • 0029356616 scopus 로고
    • Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxtion
    • Aug
    • S. J. Wang, S. M. Shahidehpour, D. S. Kirschen, S. Mokhtari, and G. D. Irisaari, "Short-term generation scheduling with transmission and environmental constraints using augmented Lagrangian relaxtion," IEEE Trans. Power Sys., vol. 10, pp. 1294-1301, Aug. 1995.
    • (1995) IEEE Trans. Power Sys , vol.10 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, S.M.2    Kirschen, D.S.3    Mokhtari, S.4    Irisaari, G.D.5
  • 16
    • 0037632191 scopus 로고    scopus 로고
    • Congestion management for generation scheduling in a deregulated Chinese power system
    • J. Lei, Y. Deng, R. Xhang, and Y. Wu, "Congestion management for generation scheduling in a deregulated Chinese power system," in Proceedings of IEEE/PES Winter Meet., pp. 1262-1265, 2001
    • (2001) Proceedings of IEEE/PES Winter Meet , pp. 1262-1265
    • Lei, J.1    Deng, Y.2    Xhang, R.3    Wu, Y.4
  • 17
    • 1442264390 scopus 로고    scopus 로고
    • W. Ongsakul and N. Petcharaks. N., Unit commitment by enhanced adaptive Lagrangian relaxation, IEEE Trans. Power Sys., 19, pp. 620-628, Feb. 2004.
    • W. Ongsakul and N. Petcharaks. N., "Unit commitment by enhanced adaptive Lagrangian relaxation," IEEE Trans. Power Sys., vol. 19, pp. 620-628, Feb. 2004.
  • 18
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE RTS Task Force of APM Subcommittee, Pas- Nov./Dec
    • IEEE RTS Task Force of APM Subcommittee, " IEEE reliability test system," IEEE Trans. Power Apparatus Systems Pas- vol. 98, pp. 2047-2054, Nov./Dec. 1979.
    • (1979) IEEE Trans. Power Apparatus Systems , vol.98 , pp. 2047-2054
  • 19
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system - 1996
    • IEEE reliability test system task force, Aug
    • IEEE reliability test system task force, "The IEEE reliability test system - 1996," IEEE Trans. Power Sys., vol. 14, pp. 1010-1020, Aug. 1999.
    • (1999) IEEE Trans. Power Sys , vol.14 , pp. 1010-1020


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.