메뉴 건너뛰기




Volumn 2, Issue , 2004, Pages 1260-1267

Modeling concurrent operational interruptions in construction activities with simplified discrete event simulation approach (SDESA)

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; COMPUTER SOFTWARE; LARGE SCALE SYSTEMS; MATHEMATICAL MODELS; PROBABILITY; VISUALIZATION;

EID: 17744393498     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (15)

References (13)
  • 1
    • 17744380660 scopus 로고    scopus 로고
    • Construction Engineering and Management, the University of Alberta, Canada
    • AbouRizk, S., (2000), SIMPHONY User Guide, Construction Engineering and Management, the University of Alberta, Canada.
    • (2000) SIMPHONY User Guide
    • AbouRizk, S.1
  • 2
    • 0000834220 scopus 로고
    • Simulation of nonstaedy construction processes
    • ASCE
    • Bernold, Leonhard E. (1989), "Simulation of nonstaedy construction processes", Journal of Construction Engineering and Management, ASCE., Vol. 115, No.2, pp. 163-178
    • (1989) Journal of Construction Engineering and Management , vol.115 , Issue.2 , pp. 163-178
    • Bernold, L.E.1
  • 3
    • 0033709038 scopus 로고    scopus 로고
    • An alternative approach for modeling of interference in discreteevent systems
    • Damrianant, J. and Wakefield, R. R. (2000), "An alternative approach for modeling of interference in discreteevent systems", Civil. Eng. and Env. Syst., Vol. 17, pp. 213-235
    • (2000) Civil. Eng. and Env. Syst. , vol.17 , pp. 213-235
    • Damrianant, J.1    Wakefield, R.R.2
  • 4
    • 0017539255 scopus 로고
    • CYCLONE - Method for modeling job site processes
    • ASCE
    • Halpin, D. W. (1977), "CYCLONE - method for modeling job site processes.", Journal of Construction Division, ASCE., Vol. 103, No.3, pp.489-499
    • (1977) Journal of Construction Division , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 7
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • ASCE
    • Lu, M. (2003a) "Simplified Discrete-Event Simulation Approach for Construction Simulation", Journal of Construction Engineering and Management, ASCE, Vol. 129, No.5, pp 537-546
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 8
    • 17744368073 scopus 로고    scopus 로고
    • Hong Kong Polytechnic University
    • Lu, M. (2003b), SDESA's User Guide, Hong Kong Polytechnic University.
    • (2003) SDESA's User Guide
    • Lu, M.1
  • 9
  • 10
    • 0027662666 scopus 로고
    • Resource-oriented modeling and simulation in construction
    • ASCE
    • McCahill, D. F. and Bernold, Leonhard E. (1993), "Resource-oriented modeling and simulation in construction", Journal of Construction Engineering and Management, ASCE., Vol. 119, No. 3, pp. 590-606
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.3 , pp. 590-606
    • McCahill, D.F.1    Bernold, L.E.2
  • 12
    • 0342711009 scopus 로고
    • Computer and construction - Midcareer reflections
    • ASCE
    • Paulson, B. C. (1995), "Computer and Construction - Midcareer Reflections", Journal of Construction Engineering and Management, ASCE., Vol. 121, No. 2, pp. 197-200
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.2 , pp. 197-200
    • Paulson, B.C.1
  • 13
    • 0003119697 scopus 로고    scopus 로고
    • Resource based modeling for construction simulation
    • ASCE
    • Shi, J. and AbouRizk, S. (1997), "Resource Based Modeling for Construction Simulation", Journal of Construction Engineering and Management, ASCE., Vol. 123, No. 1, pp. 26-33
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.1 , pp. 26-33
    • Shi, J.1    AbouRizk, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.