메뉴 건너뛰기




Volumn 19, Issue 3, 2008, Pages 195-216

Dynamic flexibility metrics for capability and capacity

Author keywords

Flexible manufacturing system; Optimization; Rescheduling; Simulation

Indexed keywords

DYNAMICAL SYSTEMS; MAINTENANCE; OPTIMIZATION; SCHEDULING;

EID: 41549115506     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10696-007-9028-2     Document Type: Article
Times cited : (5)

References (39)
  • 1
    • 0031189107 scopus 로고    scopus 로고
    • Rescheduling job shops under disruptions
    • 7
    • Abumazar RJ, Svestka JA (1997) Rescheduling job shops under disruptions. Int J Prod Res 35(7):2065-2082
    • (1997) Int J Prod Res , vol.35 , pp. 2065-2082
    • Abumazar, R.J.1    Svestka, J.A.2
  • 2
    • 0002016604 scopus 로고    scopus 로고
    • A simulation study of FMS tool allocation procedures
    • 6
    • Amoako-Gyampah K, Meredith JR (1996) A simulation study of FMS tool allocation procedures. J Manuf Syst 15(6):419-431
    • (1996) J Manuf Syst , vol.15 , pp. 419-431
    • Amoako-Gyampah, K.1    Meredith, J.R.2
  • 5
    • 0022794511 scopus 로고
    • A branch and bound approach for machine load balancing in flexible manufacturing systems
    • 10
    • Berrada M, Stecke K (1986) A branch and bound approach for machine load balancing in flexible manufacturing systems. Manage Sci 32(10):1316-1335
    • (1986) Manage Sci , vol.32 , pp. 1316-1335
    • Berrada, M.1    Stecke, K.2
  • 7
    • 0035918739 scopus 로고    scopus 로고
    • An approach to the measurement of single-machine flexibility
    • 8
    • Chang A, Whitehouse DJ, Chang S, Hsieh Y (2001) An approach to the measurement of single-machine flexibility. Int J Prod Res 39(8):1589-1601
    • (2001) Int J Prod Res , vol.39 , pp. 1589-1601
    • Chang, A.1    Whitehouse, D.J.2    Chang, S.3    Hsieh, Y.4
  • 8
    • 0000522889 scopus 로고
    • Analysis of periodic and event-driven rescheduling policies in dynamic shops
    • Church LK, Uzsoy R (1992) Analysis of periodic and event-driven rescheduling policies in dynamic shops. Int J Comp Integ M 5:153-163
    • (1992) Int J Comp Integ M , vol.5 , pp. 153-163
    • Church, L.K.1    Uzsoy, R.2
  • 9
    • 0142216504 scopus 로고    scopus 로고
    • Real-time scheduling with deadlock avoidance in flexible manufacturing systems
    • 3-4
    • ElMekkawy TY, ElMaraghy HA (2003) Real-time scheduling with deadlock avoidance in flexible manufacturing systems. Int J Adv Manuf Tech 22(3-4):259-270
    • (2003) Int J Adv Manuf Tech , vol.22 , pp. 259-270
    • Elmekkawy, T.Y.1    Elmaraghy, H.A.2
  • 10
    • 84980248442 scopus 로고
    • Strategic flexibility for high technology maneuvers: A conceptual framework
    • 1
    • Evans JS (1991) Strategic flexibility for high technology maneuvers: a conceptual framework. J Manage Stud 28(1):69-89
    • (1991) J Manage Stud , vol.28 , pp. 69-89
    • Evans, J.S.1
  • 11
    • 0030676526 scopus 로고    scopus 로고
    • A rolling horizon job shop rescheduling strategy in the dynamic environment
    • Fang J, Xi Y (1997) A rolling horizon job shop rescheduling strategy in the dynamic environment. Int J Adv Manuf Tech 13:227-232
    • (1997) Int J Adv Manuf Tech , vol.13 , pp. 227-232
    • Fang, J.1    Xi, Y.2
  • 13
    • 0035482386 scopus 로고    scopus 로고
    • A review of different approaches to the FMS loading problem
    • Grieco A, Semeraro Q, Tolio T (2001) A review of different approaches to the FMS loading problem. Int J Flex Manuf Sys 13:361-384
    • (2001) Int J Flex Manuf Sys , vol.13 , pp. 361-384
    • Grieco, A.1    Semeraro, Q.2    Tolio, T.3
  • 14
    • 0002299755 scopus 로고
    • The measurement of manufacturing flexibility
    • Gupta YP, Somers TM (1992) The measurement of manufacturing flexibility. Eur J Oper Res 60:166-182
    • (1992) Eur J Oper Res , vol.60 , pp. 166-182
    • Gupta, Y.P.1    Somers, T.M.2
  • 15
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jian AK, ElMaraghy HA (1997) Production scheduling/rescheduling in flexible manufacturing. Int J Prod Res 35:281-309
    • (1997) Int J Prod Res , vol.35 , pp. 281-309
    • Jian, A.K.1    Elmaraghy, H.A.2
  • 16
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling mechanism in a flexible manufacturing system
    • Kim MH, Kim YD (1994) Simulation-based real-time scheduling mechanism in a flexible manufacturing system. J Manuf Syst 13:85-93
    • (1994) J Manuf Syst , vol.13 , pp. 85-93
    • Kim, M.H.1    Kim, Y.D.2
  • 17
    • 41549123463 scopus 로고    scopus 로고
    • Route-independent analysis of available capacity in flexible manufacturing systems
    • Koltai T, Stecke KE (2007) Route-independent analysis of available capacity in flexible manufacturing systems. Prod Oper Manag J (in press)
    • (2007) Prod Oper Manag J (In Press)
    • Koltai, T.1    Stecke, K.E.2
  • 18
    • 0033283986 scopus 로고    scopus 로고
    • A theoretical framework for analyzing the dimensions of manufacturing flexibility
    • Koste LL, Malhotra MK (1999) A theoretical framework for analyzing the dimensions of manufacturing flexibility. J Oper Manage 18:75-93
    • (1999) J Oper Manage , vol.18 , pp. 75-93
    • Koste, L.L.1    Malhotra, M.K.2
  • 19
    • 0023416625 scopus 로고
    • A new formulation of the operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
    • Lashkari RS, Dutta SP, Padhye AM (1987) A new formulation of the operation allocation problem in flexible manufacturing systems: mathematical modeling and computational experience. International Journal of Production Research 25:1267-1283
    • (1987) Int J Prod Res , vol.25 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 21
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling system
    • Li RK, Shyu YT, Adiga S (1993) A heuristic rescheduling algorithm for computer-based production scheduling system. Int J Prod Res 31:1815-1826
    • (1993) Int J Prod Res , vol.31 , pp. 1815-1826
    • Li, R.K.1    Shyu, Y.T.2    Adiga, S.3
  • 22
    • 0042844581 scopus 로고    scopus 로고
    • Convertibility measures for manufacturing systems
    • 1
    • Maier-Speredelozzi V, Koren Y, Hu SJ (2003) Convertibility Measures for Manufacturing Systems. Ann CIRP 52(1):367-370
    • (2003) Ann CIRP , vol.52 , pp. 367-370
    • Maier-Speredelozzi, V.1    Koren, Y.2    Hu, S.J.3
  • 23
    • 33748962343 scopus 로고    scopus 로고
    • Evaluation of entropy-based dispatching in flexible manufacturing systems
    • Piplani R, Wetjens D (2007) Evaluation of entropy-based dispatching in flexible manufacturing systems. Eur J Oper Res 176:3178-331
    • (2007) Eur J Oper Res , vol.176 , pp. 3178-331
    • Piplani, R.1    Wetjens, D.2
  • 25
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I, Bayiz M (2000) Analysis of reactive scheduling problems in a job shop environment. Eur J Oper Res 126:567-586
    • (2000) Eur J Oper Res , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 26
    • 0344443735 scopus 로고    scopus 로고
    • An evaluative study of operation grouping policies in an FMS
    • Sabuncuoglu I, Lahmar M (2003) An evaluative study of operation grouping policies in an FMS. Int J Flex Manuf Sys 15:217-239
    • (2003) Int J Flex Manuf Sys , vol.15 , pp. 217-239
    • Sabuncuoglu, I.1    Lahmar, M.2
  • 27
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin SC, Chen CS (1987) The machine loading and tool allocation problem in a flexible manufacturing system. Int J Prod Res 25:1081-1094
    • (1987) Int J Prod Res , vol.25 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 28
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • 4
    • Sethi AK, Sethi SP (1990) Flexibility in manufacturing: a survey. Int J Flex Manuf Sys 2(4):289-328
    • (1990) Int J Flex Manuf Sys , vol.2 , pp. 289-328
    • Sethi, A.K.1    Sethi, S.P.2
  • 29
    • 0032182983 scopus 로고    scopus 로고
    • Definition and classification of manufacturing flexibility types and measures
    • 4
    • Shewchuk JP, Moodie CL (1998) Definition and classification of manufacturing flexibility types and measures. Int J Flex Manuf Sys 10(4):325-349
    • (1998) Int J Flex Manuf Sys , vol.10 , pp. 325-349
    • Shewchuk, J.P.1    Moodie, C.L.2
  • 30
    • 33947589400 scopus 로고    scopus 로고
    • Filtered-beam-search algorithm for dynamic rescheduling in FMS
    • Shi-jin W, Li-feng X, Bing-hai Z (2007) Filtered-beam-search algorithm for dynamic rescheduling in FMS. Robot Comput Integ Manuf 23:457-468
    • (2007) Robot Comput Integ Manuf , vol.23 , pp. 457-468
    • Shi-Jin, W.1    Li-Feng, X.2    Bing-Hai, Z.3
  • 31
    • 13444310655 scopus 로고    scopus 로고
    • Entropy as a measure of operational flexibility
    • Shuiabi E, Thomson V, Bhuiyan N (2005) Entropy as a measure of operational flexibility. Eur J Oper Res 165:696-707
    • (2005) Eur J Oper Res , vol.165 , pp. 696-707
    • Shuiabi, E.1    Thomson, V.2    Bhuiyan, N.3
  • 32
    • 0028516734 scopus 로고
    • Tool addition strategies for flexible manufacturing systems
    • Sodhi MS, Agnetis A, Askin RG (1994) Tool addition strategies for flexible manufacturing systems. Int J Flex Manuf Sys 6:287-310
    • (1994) Int J Flex Manuf Sys , vol.6 , pp. 287-310
    • Sodhi, M.S.1    Agnetis, A.2    Askin, R.G.3
  • 33
    • 0028468444 scopus 로고
    • Analytical models for FMS design optimization: A survey
    • Solot P, Van Vliet M (1994) Analytical models for FMS design optimization: a survey. Int J Flex Manuf Sys 6:209-233
    • (1994) Int J Flex Manuf Sys , vol.6 , pp. 209-233
    • Solot, P.1    Van Vliet, M.2
  • 34
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems in flexible manufacturing systems
    • 3
    • Stecke KE (1983) Formulation and solution of nonlinear integer production planning problems in flexible manufacturing systems. Manage Sci 29(3):273-288
    • (1983) Manage Sci , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 35
    • 34250111322 scopus 로고
    • Design, planning scheduling, and control problems of flexible manufacturing systems
    • 1
    • Stecke KE (1985) Design, planning scheduling, and control problems of flexible manufacturing systems. Ann Oper Res 3(1):1-12
    • (1985) Ann Oper Res , vol.3 , pp. 1-12
    • Stecke, K.E.1
  • 36
    • 1442313011 scopus 로고    scopus 로고
    • Approach to measure the mix response flexibility of manufacturing systems
    • 7
    • Van Hop N (2004) Approach to measure the mix response flexibility of manufacturing systems. Int J Prod Res 42(7):1407-1418
    • (2004) Int J Prod Res , vol.42 , pp. 1407-1418
    • Van Hop, N.1
  • 37
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira GE, Herrmann JW, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies and methods. J Schedul 6:39-62
    • (2003) J Schedul , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 38
    • 0025398941 scopus 로고
    • Flexible parts routing in manufacturing system
    • 1
    • Yao DD (1990) Flexible parts routing in manufacturing system. IIE Trans 22(1):48-55
    • (1990) IIE Trans , vol.22 , pp. 48-55
    • Yao, D.D.1
  • 39
    • 33750036713 scopus 로고    scopus 로고
    • Availability assessment of multi-state manufacturing systems using universal generating function
    • 1
    • Youssef AMA, Mohib A, ElMaraghy HA (2006) Availability assessment of multi-state manufacturing systems using universal generating function. Ann CIRP 55(1):445-448
    • (2006) Ann CIRP , vol.55 , pp. 445-448
    • Youssef, A.M.A.1    Mohib, A.2    Elmaraghy, H.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.