메뉴 건너뛰기




Volumn 23, Issue 4, 2007, Pages 457-468

Filtered-beam-search-based algorithm for dynamic rescheduling in FMS

Author keywords

Beam search; Flexible manufacturing system; Heuristic algorithm; Rescheduling; Scheduling

Indexed keywords

COMPUTATIONAL EFFICIENCY; HEURISTIC ALGORITHMS; OPTIMAL CONTROL SYSTEMS; PROBLEM SOLVING; ROBUST CONTROL; SCHEDULING;

EID: 33947589400     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2006.05.005     Document Type: Article
Times cited : (27)

References (34)
  • 1
    • 0032640820 scopus 로고    scopus 로고
    • General heuristic procedures and solution strategies for FMS scheduling
    • Liu J., and MacCarthy B.L. General heuristic procedures and solution strategies for FMS scheduling. Int. J. Prod. Res. 37 14 (1999) 3305-3333
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.14 , pp. 3305-3333
    • Liu, J.1    MacCarthy, B.L.2
  • 2
    • 0032121915 scopus 로고    scopus 로고
    • A competitive neural network approach to multi-objective FMS scheduling
    • Min H- S., and Kim C- O. A competitive neural network approach to multi-objective FMS scheduling. Int. J. Prod. Res. 36 4 (1998) 1749-1765
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.4 , pp. 1749-1765
    • Min H-, S.1    Kim C-, O.2
  • 3
    • 0030106944 scopus 로고    scopus 로고
    • The classification of FMS scheduling problems
    • Liu J., and MacCarthy B.L. The classification of FMS scheduling problems. Int. J. Prod. Res. 34 3 (1996) 647-656
    • (1996) Int. J. Prod. Res. , vol.34 , Issue.3 , pp. 647-656
    • Liu, J.1    MacCarthy, B.L.2
  • 4
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin C., and Kilic S.E. Integrating flexible process plans with scheduling in flexible manufacturing systems. Int. J. Adv. Manuf. Technol. 15 (1999) 268-280
    • (1999) Int. J. Adv. Manuf. Technol. , vol.15 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 6
    • 0142154202 scopus 로고    scopus 로고
    • The application of adaptive genetic algorithms in FMS dynamic rescheduling
    • Yang H.H., and Wu Z.M. The application of adaptive genetic algorithms in FMS dynamic rescheduling. Int. J. Computer Integrat. Manuf. 16 6 (2003) 382-397
    • (2003) Int. J. Computer Integrat. Manuf. , vol.16 , Issue.6 , pp. 382-397
    • Yang, H.H.1    Wu, Z.M.2
  • 7
    • 23344453490 scopus 로고    scopus 로고
    • Modelling and heuristics of FMS scheduling with multiple objectives
    • Low C.Y., Yip Y.L., and Wu T.H. Modelling and heuristics of FMS scheduling with multiple objectives. Comput. Operat. Res. 33 (2006) 674-694
    • (2006) Comput. Operat. Res. , vol.33 , pp. 674-694
    • Low, C.Y.1    Yip, Y.L.2    Wu, T.H.3
  • 8
    • 0024716540 scopus 로고
    • Real-time tool control and job dispatching in flexible manufacturing systems
    • Han M., Na Y.K., and Hogg G.L. Real-time tool control and job dispatching in flexible manufacturing systems. Int. J. Prod. Res. 27 (1989) 1257-1267
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1257-1267
    • Han, M.1    Na, Y.K.2    Hogg, G.L.3
  • 9
    • 33947598921 scopus 로고    scopus 로고
    • Hutchinson J, Leong K, Snyder D, Ward F. Scheduling for random job shop flexible manufacturing. Proceedings of the third ORSA/TIMS conference on flexible manufacturing system, Cambridge, MA, USA. 1989. p.161-6.
  • 10
    • 84952242943 scopus 로고
    • Loading and control problem for a flexible manufacturing system
    • Stecke K.E., and Solberg J.J. Loading and control problem for a flexible manufacturing system. Int. J. Prod. Res. 19 (1981) 481-490
    • (1981) Int. J. Prod. Res. , Issue.19 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.J.2
  • 11
    • 0026374056 scopus 로고
    • A transient-based real-time scheduling algorithm in FMS
    • Ishii N., and Talavage J. A transient-based real-time scheduling algorithm in FMS. Int. J. Prod. Res. 29 (1991) 2501-2520
    • (1991) Int. J. Prod. Res. , vol.29 , pp. 2501-2520
    • Ishii, N.1    Talavage, J.2
  • 12
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling in a flexible manufacturing system
    • Kim M.H., and Kim Y.D. Simulation-based real-time scheduling in a flexible manufacturing system. J. Manuf. Syst. 13 2 (1994) 85-93
    • (1994) J. Manuf. Syst. , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.H.1    Kim, Y.D.2
  • 13
    • 0038481221 scopus 로고    scopus 로고
    • Analysis of dynamic dispatching rules for a flexible manufacturing system
    • Chan F.T.S., Chan H.K., Lau H.C.W., and Ip R.W.L. Analysis of dynamic dispatching rules for a flexible manufacturing system. J. Mater. Process. Technol. 138 (2003) 325-331
    • (2003) J. Mater. Process. Technol. , vol.138 , pp. 325-331
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3    Ip, R.W.L.4
  • 14
    • 0033207947 scopus 로고    scopus 로고
    • Towards the integration of flexible manufacturing system scheduling
    • Balogun O.O., and Popplewell K. Towards the integration of flexible manufacturing system scheduling. Int. J. Prod. Res. 37 15 (1999) 3399-3428
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.15 , pp. 3399-3428
    • Balogun, O.O.1    Popplewell, K.2
  • 15
    • 0034802653 scopus 로고    scopus 로고
    • Dynamic scheduling for a flexible manufacturing system-the pre-emptive approach
    • Chan F.T.S., and Chan H.K. Dynamic scheduling for a flexible manufacturing system-the pre-emptive approach. Int. J. Adv. Manuf. Technol. 17 (2001) 760-768
    • (2001) Int. J. Adv. Manuf. Technol. , vol.17 , pp. 760-768
    • Chan, F.T.S.1    Chan, H.K.2
  • 16
    • 0026982303 scopus 로고    scopus 로고
    • Lee DY, DiCesare F. FMS scheduling using Petri nets and heuristic search. Proceedings of the 1992 IEEE international conference on robotics and automation, Nice, France, vol. 2. 1992. p. 1057-62.
  • 17
    • 0027644831 scopus 로고
    • A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements
    • Thawonmas R., Shiratori N., and Noguchi S. A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements. IEICE Trans. Inform. Syst. E 76 (1993) 947-955
    • (1993) IEICE Trans. Inform. Syst. E , vol.76 , pp. 947-955
    • Thawonmas, R.1    Shiratori, N.2    Noguchi, S.3
  • 19
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
    • Jeong K- C., and Kim Y- D. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. Int. J. Prod. Res. 36 9 (1998) 2609-2626
    • (1998) Int. J. Prod. Res. , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong K-, C.1    Kim Y-, D.2
  • 20
    • 0023844415 scopus 로고
    • Filtered beam search in scheduling
    • Ow P.S., and Morton T.E. Filtered beam search in scheduling. Int. J. Prod. Res. 26 1 (1988) 35-62
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.1 , pp. 35-62
    • Ow, P.S.1    Morton, T.E.2
  • 21
    • 0033357382 scopus 로고    scopus 로고
    • Job shop scheduling with beam search
    • Sabuncuoglu I., and Bayiz M. Job shop scheduling with beam search. Eur. J. Operat. Res. 118 (1999) 390-412
    • (1999) Eur. J. Operat. Res. , vol.118 , pp. 390-412
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 22
    • 0242485199 scopus 로고    scopus 로고
    • Reactive scheduling in a dynamic and stochastic FMS environment
    • Sabuncuoglu I., and Kizilisik O.B. Reactive scheduling in a dynamic and stochastic FMS environment. Int. J. Prod. Res. 41 17 (2003) 4211-4231
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.17 , pp. 4211-4231
    • Sabuncuoglu, I.1    Kizilisik, O.B.2
  • 23
    • 18144398185 scopus 로고    scopus 로고
    • Zhou BH, Xi LF, Cao YS. A beam-search-based algorithm for the tool switching problem on a flexible machine
    • Zhou BH, Xi LF, Cao YS. A beam-search-based algorithm for the tool switching problem on a flexible machine. Int. J. Adv. Manuf. Technol. 25 9-10 (2005) 876-882
    • (2005) Int. J. Adv. Manuf. Technol. , vol.25 , Issue.9-10 , pp. 876-882
  • 24
    • 0024765468 scopus 로고
    • A bottleneck-based beam search for job scheduling in a flexible manufacturing system
    • Chang Y., Matsuo H., and Sullivan R.S. A bottleneck-based beam search for job scheduling in a flexible manufacturing system. Int. J. Prod. Res. 27 11 (1989) 1949-1961
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.11 , pp. 1949-1961
    • Chang, Y.1    Matsuo, H.2    Sullivan, R.S.3
  • 25
    • 0006463310 scopus 로고
    • Flexible manufacturing system (FMS) scheduling using filtered beam search
    • De S., and Lee A. Flexible manufacturing system (FMS) scheduling using filtered beam search. J. Intel. Manuf. 1 (1990) 165-183
    • (1990) J. Intel. Manuf. , vol.1 , pp. 165-183
    • De, S.1    Lee, A.2
  • 26
    • 0025797863 scopus 로고    scopus 로고
    • Shih HM, Sekiguchi T. A timed Petri net and beam search based on-line FMS scheduling system with routing flexibility. Proceedings of IEEE international conference on robotics and automation, Sacramento, CA. 1991. p. 2548-53.
  • 27
    • 0032000573 scopus 로고    scopus 로고
    • A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
    • Sabuncuoglu I., and Karabuk S. A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Trans. 30 2 (1998) 179-191
    • (1998) IIE Trans. , vol.30 , Issue.2 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 28
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • Sabuncuoglu I., and Karabuk S. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. J. Manuf. Syst. 18 4 (1999) 268-283
    • (1999) J. Manuf. Syst. , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 29
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I., and Bayiz M. Analysis of reactive scheduling problems in a job shop environment. Eur. J. Operat. Res. 126 (2000) 567-586
    • (2000) Eur. J. Operat. Res. , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 31
    • 0030081775 scopus 로고    scopus 로고
    • R&D project selection and scheduling with a filtered beam search approach
    • Coffin M.A., and Taylor III B.W. R&D project selection and scheduling with a filtered beam search approach. IIE Trans. 28 (1996) 167-176
    • (1996) IIE Trans. , vol.28 , pp. 167-176
    • Coffin, M.A.1    Taylor III, B.W.2
  • 32
    • 33947600800 scopus 로고    scopus 로고
    • Shih HM. Fuzzy inference and beam search based scheduling. Proceedings of the IEEE international conference on industrial technology, Guangzhou, China. 1994. p. 183-7.
  • 33
    • 0031118685 scopus 로고    scopus 로고
    • Evaluation of alternative routing policies in scheduling a job-shop type FMS
    • Tunali S. Evaluation of alternative routing policies in scheduling a job-shop type FMS. Comput. Ind. Eng. 32 2 (1997) 243-250
    • (1997) Comput. Ind. Eng. , vol.32 , Issue.2 , pp. 243-250
    • Tunali, S.1
  • 34
    • 0028368897 scopus 로고
    • Time complexity of a path formulated optimal routing algorithm
    • Antonio J.K., Tsai W.K., and Huang G.M. Time complexity of a path formulated optimal routing algorithm. IEEE Trans. Automat. Control 39 9 (1994) 1839-1844
    • (1994) IEEE Trans. Automat. Control , vol.39 , Issue.9 , pp. 1839-1844
    • Antonio, J.K.1    Tsai, W.K.2    Huang, G.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.