메뉴 건너뛰기




Volumn 46, Issue 10, 2008, Pages 2827-2844

Determination of buffer sizes for drum-buffer-rope (DBR)-controlled production systems

Author keywords

Assembly buffer; Buffer size; Constraint buffer; Drum buffer rope (DBR)

Indexed keywords

CONSTRAINT THEORY; MATHEMATICAL MODELS; PROCESS DESIGN; PRODUCTION CONTROL; RELIABILITY ANALYSIS;

EID: 40849098595     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600922948     Document Type: Article
Times cited : (24)

References (24)
  • 1
    • 0023861277 scopus 로고
    • Multiproduct queueing networks with deterministic routing: Decomposition approach and the notion of interference
    • Bitran, G.R. and Tirupati, D., Multiproduct queueing networks with deterministic routing: decomposition approach and the notion of interference. Manag. Sci., 1988, 34, 75-100.
    • (1988) Manag. Sci , vol.34 , pp. 75-100
    • Bitran, G.R.1    Tirupati, D.2
  • 2
    • 0020877967 scopus 로고
    • Analysis of buffering techniques in MRP systems with a matrix loading model
    • Chang, C., Brown, L. and Johnson, L., Analysis of buffering techniques in MRP systems with a matrix loading model. IIE Trans., 1983, 15, 305-312.
    • (1983) IIE Trans , vol.15 , pp. 305-312
    • Chang, C.1    Brown, L.2    Johnson, L.3
  • 4
    • 40849135339 scopus 로고
    • a review
    • Buffering decisions under MRP environment
    • Chu, C.H. and Hayya, J., Buffering decisions under MRP environment: a review. OMEGA, 1988, 16, 325-331.
    • (1988) OMEGA , vol.16 , pp. 325-331
    • Chu, C.H.1    Hayya, J.2
  • 5
    • 0035737047 scopus 로고    scopus 로고
    • Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manag. J., 2001, Third/Fourth Quarter, 17-23.
    • Corbett, T. and Csillag, J.M., Analysis of the effects of seven drum-buffer-rope implementations. Prod. Invent. Manag. J., 2001, Third/Fourth Quarter, 17-23.
  • 6
    • 27644484071 scopus 로고    scopus 로고
    • Optimal design of work-in-process buffers
    • Faria, J., Manuel, M. and Nunes, E., Optimal design of work-in-process buffers. Int. J. Prod. Econ., 2006, 99, 144-155.
    • (2006) Int. J. Prod. Econ , vol.99 , pp. 144-155
    • Faria, J.1    Manuel, M.2    Nunes, E.3
  • 8
    • 0026202248 scopus 로고
    • Investigating dependence in packet queues with the index of dispersion for work
    • Fendick, K.W., Saksena, V.R. and Whitt, W., Investigating dependence in packet queues with the index of dispersion for work. IEEE Trans. Comm., 1991, COM-39, 1231-1244.
    • (1991) IEEE Trans. Comm , vol.COM-39 , pp. 1231-1244
    • Fendick, K.W.1    Saksena, V.R.2    Whitt, W.3
  • 9
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a reproduction environment
    • Guide, V.D.R., Scheduling using drum-buffer-rope in a reproduction environment. Int. J. Prod. Res., 1996, 34, 1081-1091.
    • (1996) Int. J. Prod. Res , vol.34 , pp. 1081-1091
    • Guide, V.D.R.1
  • 10
    • 0030869876 scopus 로고    scopus 로고
    • Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines
    • Kut, C.S., Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines. HE Trans., 1997, 29, 81-88.
    • (1997) HE Trans , vol.29 , pp. 81-88
    • Kut, C.S.1
  • 11
    • 1242265223 scopus 로고    scopus 로고
    • Queueing network analysis approach for estimating the sizes of the time buffer in theory of constraints-controlled production system
    • Louw, L. and Page, D.C., Queueing network analysis approach for estimating the sizes of the time buffer in theory of constraints-controlled production system. Int. J. Prod. Res., 2004, 42, 1207-1226.
    • (2004) Int. J. Prod. Res , vol.42 , pp. 1207-1226
    • Louw, L.1    Page, D.C.2
  • 12
    • 0031117128 scopus 로고    scopus 로고
    • Comparing JIT, MRP and TOC, and embedding TOC into MRP
    • Miltenburg, J., Comparing JIT, MRP and TOC, and embedding TOC into MRP. Int. J. Prod. Res., 1997, 35, 1147-1169.
    • (1997) Int. J. Prod. Res , vol.35 , pp. 1147-1169
    • Miltenburg, J.1
  • 13
    • 0001342394 scopus 로고
    • MRP with high uncertain yield losses
    • New, C. and Mapes, J., MRP with high uncertain yield losses. J. Oper. Manag., 1984, 4, 315-330.
    • (1984) J. Oper. Manag , vol.4 , pp. 315-330
    • New, C.1    Mapes, J.2
  • 14
    • 0029735339 scopus 로고    scopus 로고
    • Allocation of buffers to serial production lines with bottlenecks
    • Powell, S.G. and Pyke, D.F., Allocation of buffers to serial production lines with bottlenecks. IIE Trans., 1996, 28, 18-29.
    • (1996) IIE Trans , vol.28 , pp. 18-29
    • Powell, S.G.1    Pyke, D.F.2
  • 15
    • 0032114853 scopus 로고    scopus 로고
    • A quantitative approach to estimate the size of the time buffer in the theory of constraints
    • Radovilsky, Z.D., A quantitative approach to estimate the size of the time buffer in the theory of constraints. Int. J. Prod. Econ., 1998, 55, 113-119.
    • (1998) Int. J. Prod. Econ , vol.55 , pp. 113-119
    • Radovilsky, Z.D.1
  • 16
    • 0032376210 scopus 로고
    • Theory of constraints: A review of the philosophy and its applications
    • Rahman, S., Theory of constraints: a review of the philosophy and its applications. Int. J. Oper. & Prod. Manage., 1988, 18, 336-355.
    • (1988) Int. J. Oper. & Prod. Manage , vol.18 , pp. 336-355
    • Rahman, S.1
  • 17
    • 0009058971 scopus 로고
    • Material requirements planning and theory of constraints: Can they coexist? A case study
    • Fourth Quarter
    • Reimer, G., Material requirements planning and theory of constraints: can they coexist? A case study. Prod. Invent. Manag. J., 1991, Fourth Quarter, 48-52.
    • (1991) Prod. Invent. Manag. J , pp. 48-52
    • Reimer, G.1
  • 18
    • 0000354915 scopus 로고
    • Resolving uncertainty in production systems
    • Schmitt, T., Resolving uncertainty in production systems. J. Oper. Manag., 1984, 4, 331-345.
    • (1984) J. Oper. Manag , vol.4 , pp. 331-345
    • Schmitt, T.1
  • 19
    • 0025699540 scopus 로고
    • Drum-buffer-rope shop floor control
    • Third Quarter
    • Schragenheim, E. and Ronen, B., Drum-buffer-rope shop floor control. Prod. Invent. Manag. J., 1990, Third Quarter, 18-22.
    • (1990) Prod. Invent. Manag. J , pp. 18-22
    • Schragenheim, E.1    Ronen, B.2
  • 20
    • 0037233381 scopus 로고    scopus 로고
    • Optimal buffer allocation in product line
    • Shi, L. and Men, S., Optimal buffer allocation in product line. IIE Trans., 2003, 35, 1-10.
    • (2003) IIE Trans , vol.35 , pp. 1-10
    • Shi, L.1    Men, S.2
  • 21
    • 0032048282 scopus 로고    scopus 로고
    • Constraint time buffer determination model
    • Tu, Y.M. and Li, R.K., Constraint time buffer determination model. Int. J. Prod. Res., 1998, 36, 1091-1103.
    • (1998) Int. J. Prod. Res , vol.36 , pp. 1091-1103
    • Tu, Y.M.1    Li, R.K.2
  • 22
    • 0040976766 scopus 로고
    • Analyzing production problems using V-A-T analysis
    • Second Quarter
    • Umble, M., Analyzing production problems using V-A-T analysis. Prod. Invent. Manag. J., 1992, Second Quarter, 55-60.
    • (1992) Prod. Invent. Manag. J , pp. 55-60
    • Umble, M.1
  • 23
  • 24
    • 4444329378 scopus 로고
    • Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factory
    • Yenradee, P., Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory. Comput. Ind. Eng., 1994, 27, 217-220.
    • (1994) Comput. Ind. Eng , vol.27 , pp. 217-220
    • Yenradee, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.