-
2
-
-
14344249645
-
Generation system operating reserve assessment practices used by Canadian utilities
-
NISH, J.I., and MILLAR, N.A.: 'Generation system operating reserve assessment practices used by Canadian utilities'. Electrical Association, power system planning and operation section, Spring meeting, 1984
-
(1984)
Electrical Association, Power System Planning and Operation Section, Spring Meeting
-
-
Nish, J.I.1
Millar, N.A.2
-
4
-
-
0028480974
-
A basic framework for generating system operating health analysis
-
BILLINTON, R., and FOTUHI-FIRUZABAD, M.: 'A basic framework for generating system operating health analysis', IEEE Trans., 1994, PWRS-9, (3), pp. 1610-1617
-
(1994)
IEEE Trans.
, vol.PWRS-9
, Issue.3
, pp. 1610-1617
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
5
-
-
0028482457
-
Generating system operating health analysis considering standby units, interruptible load and postponable outages
-
BILLINTON, R., and FOTUHI-FIRUZABAD, M.: 'Generating system operating health analysis considering standby units, interruptible load and postponable outages', IEEE Trans., 1994, PWRS-9, (3), pp. 1618-1625
-
(1994)
IEEE Trans.
, vol.PWRS-9
, Issue.3
, pp. 1618-1625
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
7
-
-
0026820887
-
A security based approach to composite power system reliability evaluation
-
BILLINTON, R., and KHAN, E.: 'A security based approach to composite power system reliability evaluation', IEEE Trans., 1992, PWRS-7, (1), pp. 65-71
-
(1992)
IEEE Trans.
, vol.PWRS-7
, Issue.1
, pp. 65-71
-
-
Billinton, R.1
Khan, E.2
-
8
-
-
0023563981
-
Composite-system reliability evaluation: Phase 1-Scooping Study
-
Final Report: project 2581-1
-
Final Report: 'Composite-system reliability evaluation: phase 1-Scooping Study. Technical report EPRI EL-5290, project 2581-1, 1987
-
(1987)
Technical Report EPRI EL-5290
-
-
-
9
-
-
84938165404
-
Generating unit commitment by dynamic programming
-
LOWERY, P.G.: 'Generating unit commitment by dynamic programming', IEEE Trans., 1966, PAS-85, (5), pp. 422-426
-
(1966)
IEEE Trans.
, vol.PAS-85
, Issue.5
, pp. 422-426
-
-
Lowery, P.G.1
-
10
-
-
0017495536
-
Optimal power dispatch - A comprehensive survey
-
HAPP, H.H.: 'Optimal power dispatch - a comprehensive survey', IEEE Trans., 1977, PAS-96, (3)
-
(1977)
IEEE Trans.
, vol.PAS-96
, Issue.3
-
-
Happ, H.H.1
-
12
-
-
0018544097
-
IEEE reliability test system
-
IEEE COMMITTEE REPORT
-
IEEE COMMITTEE REPORT : 'IEEE reliability test system', IEEE Trans., 1979, PAS-98, (6), pp. 2047-2054
-
(1979)
IEEE Trans.
, vol.PAS-98
, Issue.6
, pp. 2047-2054
-
-
-
13
-
-
0022807554
-
The IEEE reliability test system - Extension to and evaluation of the generating system
-
ALLAN, R.N., BILLINTON, R., and ABDEL-GAWAD, N.M.K.: 'The IEEE reliability test system - extension to and evaluation of the generating system', IEEE Trans., 1986, PWRS-I, (4), pp. 1-7
-
(1986)
IEEE Trans.
, vol.PWRS-I
, Issue.4
, pp. 1-7
-
-
Allan, R.N.1
Billinton, R.2
Abdel-Gawad, N.M.K.3
-
14
-
-
85095904143
-
Outage postponability effects in operating capacity reliability studies
-
Paper A78064-8, New York
-
BILLINTON, R., and ALAM, M.: 'Outage postponability effects in operating capacity reliability studies'. Paper A78064-8, IEEE Winter power meeting. New York, 1978
-
(1978)
IEEE Winter Power Meeting
-
-
Billinton, R.1
Alam, M.2
|