메뉴 건너뛰기




Volumn 143, Issue 6, 1996, Pages 599-607

Response health constraints in economic load dispatch considering standby units, interruptible loads and postponable outages

Author keywords

Economic load dispatch; Response health constraints; Standby units

Indexed keywords

ELECTRIC LOAD DISPATCHING; ELECTRIC LOAD MANAGEMENT; ELECTRIC POWER GENERATION; OUTAGES; STANDBY POWER SYSTEMS;

EID: 0030291434     PISSN: 13502360     EISSN: None     Source Type: Journal    
DOI: 10.1049/ip-gtd:19960625     Document Type: Article
Times cited : (4)

References (14)
  • 4
    • 0028480974 scopus 로고
    • A basic framework for generating system operating health analysis
    • BILLINTON, R., and FOTUHI-FIRUZABAD, M.: 'A basic framework for generating system operating health analysis', IEEE Trans., 1994, PWRS-9, (3), pp. 1610-1617
    • (1994) IEEE Trans. , vol.PWRS-9 , Issue.3 , pp. 1610-1617
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 5
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering standby units, interruptible load and postponable outages
    • BILLINTON, R., and FOTUHI-FIRUZABAD, M.: 'Generating system operating health analysis considering standby units, interruptible load and postponable outages', IEEE Trans., 1994, PWRS-9, (3), pp. 1618-1625
    • (1994) IEEE Trans. , vol.PWRS-9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 7
    • 0026820887 scopus 로고
    • A security based approach to composite power system reliability evaluation
    • BILLINTON, R., and KHAN, E.: 'A security based approach to composite power system reliability evaluation', IEEE Trans., 1992, PWRS-7, (1), pp. 65-71
    • (1992) IEEE Trans. , vol.PWRS-7 , Issue.1 , pp. 65-71
    • Billinton, R.1    Khan, E.2
  • 8
    • 0023563981 scopus 로고
    • Composite-system reliability evaluation: Phase 1-Scooping Study
    • Final Report: project 2581-1
    • Final Report: 'Composite-system reliability evaluation: phase 1-Scooping Study. Technical report EPRI EL-5290, project 2581-1, 1987
    • (1987) Technical Report EPRI EL-5290
  • 9
    • 84938165404 scopus 로고
    • Generating unit commitment by dynamic programming
    • LOWERY, P.G.: 'Generating unit commitment by dynamic programming', IEEE Trans., 1966, PAS-85, (5), pp. 422-426
    • (1966) IEEE Trans. , vol.PAS-85 , Issue.5 , pp. 422-426
    • Lowery, P.G.1
  • 10
    • 0017495536 scopus 로고
    • Optimal power dispatch - A comprehensive survey
    • HAPP, H.H.: 'Optimal power dispatch - a comprehensive survey', IEEE Trans., 1977, PAS-96, (3)
    • (1977) IEEE Trans. , vol.PAS-96 , Issue.3
    • Happ, H.H.1
  • 12
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE COMMITTEE REPORT
    • IEEE COMMITTEE REPORT : 'IEEE reliability test system', IEEE Trans., 1979, PAS-98, (6), pp. 2047-2054
    • (1979) IEEE Trans. , vol.PAS-98 , Issue.6 , pp. 2047-2054
  • 13
    • 0022807554 scopus 로고
    • The IEEE reliability test system - Extension to and evaluation of the generating system
    • ALLAN, R.N., BILLINTON, R., and ABDEL-GAWAD, N.M.K.: 'The IEEE reliability test system - extension to and evaluation of the generating system', IEEE Trans., 1986, PWRS-I, (4), pp. 1-7
    • (1986) IEEE Trans. , vol.PWRS-I , Issue.4 , pp. 1-7
    • Allan, R.N.1    Billinton, R.2    Abdel-Gawad, N.M.K.3
  • 14
    • 85095904143 scopus 로고
    • Outage postponability effects in operating capacity reliability studies
    • Paper A78064-8, New York
    • BILLINTON, R., and ALAM, M.: 'Outage postponability effects in operating capacity reliability studies'. Paper A78064-8, IEEE Winter power meeting. New York, 1978
    • (1978) IEEE Winter Power Meeting
    • Billinton, R.1    Alam, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.