메뉴 건너뛰기




Volumn 46, Issue 4 SPEC. ISS., 2004, Pages 793-802

A heuristic approach to batching and scheduling a single machine to minimize setup costs

Author keywords

Batching; Flexible manufacturing cell; Heuristic; Setup; Tool switch

Indexed keywords

COSTS; HEURISTIC METHODS; MACHINING; OPERATIONS RESEARCH; PROBLEM SOLVING; SYNCHRONIZATION;

EID: 3242724127     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2004.05.010     Document Type: Article
Times cited : (13)

References (12)
  • 1
    • 3242707580 scopus 로고    scopus 로고
    • Part batching and scheduling in a flexible cell to minimize setup costs
    • Agnetis A., Alfieri A., Nicosia G. Part batching and scheduling in a flexible cell to minimize setup costs. Journal of Scheduling. 6:2003;83-104.
    • (2003) Journal of Scheduling , vol.6 , pp. 83-104
    • Agnetis, A.1    Alfieri, A.2    Nicosia, G.3
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi A., Gupta J.N.D., Aldowaisan T. A review of scheduling research involving setup considerations. Omega. 27:(2):1999;219-239.
    • (1999) Omega , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 5
    • 0029388133 scopus 로고
    • Solving the combined part sequencing and tool replacement problem for an automated machining center: A Tabu search approach
    • Kolahan F., Liang M., Zuo M. Solving the combined part sequencing and tool replacement problem for an automated machining center: A Tabu search approach. Computers and Industrial Engineering. 28:1995;731-743.
    • (1995) Computers and Industrial Engineering , vol.28 , pp. 731-743
    • Kolahan, F.1    Liang, M.2    Zuo, M.3
  • 6
    • 0027539517 scopus 로고
    • Optimal operation planning and sequencing: Minimization of tool change overs
    • Lin C., Wang H. Optimal operation planning and sequencing: Minimization of tool change overs. International Journal of Production Research. 31:1993;311-324.
    • (1993) International Journal of Production Research , vol.31 , pp. 311-324
    • Lin, C.1    Wang, H.2
  • 7
    • 0035371898 scopus 로고    scopus 로고
    • Scheduling of the optimal tool replacement times in a flexible manufacturing system
    • Liu P.H., Makis V., Jardine A.K.S. Scheduling of the optimal tool replacement times in a flexible manufacturing system. IIE Transactions. 33:(6):2001;487-495.
    • (2001) IIE Transactions , vol.33 , Issue.6 , pp. 487-495
    • Liu, P.H.1    Makis, V.2    Jardine, A.K.S.3
  • 8
    • 84976657294 scopus 로고
    • The complexity of some problems on subsequences and supersequences
    • Maier D. The complexity of some problems on subsequences and supersequences. Journal of ACM. 25:1978;322-336.
    • (1978) Journal of ACM , vol.25 , pp. 322-336
    • Maier, D.1
  • 10
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches
    • Tang C.S., Denardo E.V. Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches. Operations Research. 36:1988;767-777.
    • (1988) Operations Research , vol.36 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 11
    • 0024071392 scopus 로고
    • Models arising from a flexible manufacturing machine, part II: Minimization of the number of switching instants
    • Tang C.S., Denardo E.V. Models arising from a flexible manufacturing machine, part II: Minimization of the number of switching instants. Operations Research. 36:1988;778-784.
    • (1988) Operations Research , vol.36 , pp. 778-784
    • Tang, C.S.1    Denardo, E.V.2
  • 12
    • 34249956286 scopus 로고
    • Complexity of common sub-sequence and super-sequence problems and related problems
    • Timkovskii V.G. Complexity of common sub-sequence and super-sequence problems and related problems. Cybernetics. 25:1990;565-580.
    • (1990) Cybernetics , vol.25 , pp. 565-580
    • Timkovskii, V.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.