메뉴 건너뛰기




Volumn 34, Issue 10, 2007, Pages 1247-1256

Equipment workspace analysis in infrastructure projects

Author keywords

Bridge redecking; Construction equipment; Constructive solid geometry; Infrastructure projects; Spatiotemporal conflicts; Workspace analysis

Indexed keywords

BRIDGE DECKS; COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; PLANNING;

EID: 38049036955     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L07-048     Document Type: Article
Times cited : (17)

References (21)
  • 3
    • 4243345237 scopus 로고    scopus 로고
    • Ph.D. thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montréal, Que
    • Al-Hussein, M. 1999. An integrated information system for crane selection and utilization. Ph.D. thesis, Department of Building, Civil and Environmental Engineering, Concordia University, Montréal, Que.
    • (1999) An integrated information system for crane selection and utilization
    • Al-Hussein, M.1
  • 4
    • 84993085455 scopus 로고    scopus 로고
    • An algorithm for mobile crane selection and location on construction sites
    • Al-Hussein, M., Alkass, S., and Moselhi, O. 2001. An algorithm for mobile crane selection and location on construction sites. Construction Innovation Journal, 1(2): 92-105.
    • (2001) Construction Innovation Journal , vol.1 , Issue.2 , pp. 92-105
    • Al-Hussein, M.1    Alkass, S.2    Moselhi, O.3
  • 6
    • 0028599007 scopus 로고    scopus 로고
    • Dharwadkar, P.V., Varghese, K., O'Connor, J.T., and Gatton, T.M. 1994. Graphic visualization for planning heavy lifts. In Proceedings of the 1st Congress on Computing in Civil Engineering, Washington, D.C., 20-22 June 1994. Edited by K. Khozeimeh. ASCE, New York. pp. 759-766.
    • Dharwadkar, P.V., Varghese, K., O'Connor, J.T., and Gatton, T.M. 1994. Graphic visualization for planning heavy lifts. In Proceedings of the 1st Congress on Computing in Civil Engineering, Washington, D.C., 20-22 June 1994. Edited by K. Khozeimeh. ASCE, New York. pp. 759-766.
  • 7
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of workspace conflicts in building construction
    • Guo, S. 2002. Identification and resolution of workspace conflicts in building construction. Journal of Construction Engineering and Management, ASCE, 128(4): 287-295.
    • (2002) Journal of Construction Engineering and Management, ASCE , vol.128 , Issue.4 , pp. 287-295
    • Guo, S.1
  • 17
    • 38049041576 scopus 로고    scopus 로고
    • Walesh, A., and Gehringer, D. 2001. Java 3D API jump-start. Prentice Hall PTR, Upper Saddle River, N.J.
    • Walesh, A., and Gehringer, D. 2001. Java 3D API jump-start. Prentice Hall PTR, Upper Saddle River, N.J.
  • 18
    • 0003802875 scopus 로고    scopus 로고
    • 3rd ed. Addison-Wesley Publishing Company Inc, Reading, Mass
    • Watt, A. 2000. 3D computer graphics. 3rd ed. Addison-Wesley Publishing Company Inc., Reading, Mass.
    • (2000) 3D computer graphics
    • Watt, A.1
  • 19
    • 0242664925 scopus 로고    scopus 로고
    • Deck reconstruction of Jacques Cartier Bridge using precast prestressed high performance concrete panels
    • Zaki, A.R., and Mailhot, G. 2003. Deck reconstruction of Jacques Cartier Bridge using precast prestressed high performance concrete panels. PCI Journal, 48(5): 20-33.
    • (2003) PCI Journal , vol.48 , Issue.5 , pp. 20-33
    • Zaki, A.R.1    Mailhot, G.2
  • 21
    • 0028044305 scopus 로고    scopus 로고
    • Zouein, P.P., and Tommelein, I.D. 1994. Time-space tradeoff strategies for space-schedule construction. In Proceedings of the 1st Congress on Computing in Civil Engineering, Washington, D.C., 20-22 June 1994. Edited by K. Khozeimeh. ASCE, New York. pp. 1180-1187.
    • Zouein, P.P., and Tommelein, I.D. 1994. Time-space tradeoff strategies for space-schedule construction. In Proceedings of the 1st Congress on Computing in Civil Engineering, Washington, D.C., 20-22 June 1994. Edited by K. Khozeimeh. ASCE, New York. pp. 1180-1187.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.