메뉴 건너뛰기




Volumn 130, Issue 6, 2004, Pages 853-861

Risks in Chinese construction market - Contractors' perspective

Author keywords

China; Construction industry; Contractors; Risk management

Indexed keywords

CONTRACTS; ECONOMIC AND SOCIAL EFFECTS; INDEXING (OF INFORMATION); INTERNATIONAL TRADE; MARKETING; PROFESSIONAL ASPECTS; PROJECT MANAGEMENT; RISK ASSESSMENT; SURVEYING;

EID: 13944278087     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:6(853)     Document Type: Review
Times cited : (119)

References (17)
  • 1
    • 0002871377 scopus 로고
    • The characteristics of joint ventures in the People's Republic of China
    • Beamish, P. W. (1993). "The characteristics of joint ventures in the People's Republic of China." J. Int. Marketing, 1(2), 29-48.
    • (1993) J. Int. Marketing , vol.1 , Issue.2 , pp. 29-48
    • Beamish, P.W.1
  • 2
    • 13944274312 scopus 로고    scopus 로고
    • Dec. 11, (in Chinese)
    • Beijing Daily. (2001). Dec. 11, (in Chinese).
    • (2001) Beijing Daily
  • 3
    • 0035336593 scopus 로고    scopus 로고
    • The future of international construction: Some results of 1992-1999 surveys
    • Bon, R., and Crosthwaite, D. (2001). "The future of international construction: Some results of 1992-1999 surveys." Build Res. Inf., 29(3), 242-247.
    • (2001) Build Res. Inf. , vol.29 , Issue.3 , pp. 242-247
    • Bon, R.1    Crosthwaite, D.2
  • 5
    • 0032045222 scopus 로고    scopus 로고
    • Severity diagnosis of productivity problems-A reliability analysis
    • Kaming, P. F., Holt, G. D., Kometa, S. T., and Olomolaiye, P. O. (1998). "Severity diagnosis of productivity problems-A reliability analysis." Int. J. Proj. Manage., 16(2), 107-113.
    • (1998) Int. J. Proj. Manage. , vol.16 , Issue.2 , pp. 107-113
    • Kaming, P.F.1    Holt, G.D.2    Kometa, S.T.3    Olomolaiye, P.O.4
  • 6
    • 0029469867 scopus 로고
    • Risk management perceptions and trends of U.S. construction
    • Kangari, R. (1995). "Risk management perceptions and trends of U.S. construction." J. Constr. Eng. Manage., 121(4), 422-429.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 422-429
    • Kangari, R.1
  • 8
    • 0032666456 scopus 로고    scopus 로고
    • Risk management in international construction joint ventures
    • Li, B., and Tiong, R. L. K. (1999a). "Risk management in international construction joint ventures." J. Constr. Eng. Manage., 125(4), 277-284.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 277-284
    • Li, B.1    Tiong, R.L.K.2
  • 9
    • 0032646010 scopus 로고    scopus 로고
    • Risk management model for international construction joint ventures
    • Li, B., and Tiong, R. L. K. (1999b). "Risk management model for international construction joint ventures." J. Constr. Eng. Manage., 125(5), 377-384.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 377-384
    • Li, B.1    Tiong, R.L.K.2
  • 11
    • 84930124504 scopus 로고
    • Causes of high costs of construction in Nigeria
    • Okpala, D. C., and Aniekwu, A. N. (1988). "Causes of high costs of construction in Nigeria." J. Constr. Eng. Manage., 114(2), 233-244.
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.2 , pp. 233-244
    • Okpala, D.C.1    Aniekwu, A.N.2
  • 13
    • 0035135304 scopus 로고    scopus 로고
    • Risk assessment for construction joint ventures in China
    • Shen, L. Y., Wu, G. W. C., and Ng, C. S. K. (2001). "Risk assessment for construction joint ventures in China." J. Constr. Eng. Manage., 127(1), 76-81.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 76-81
    • Shen, L.Y.1    Wu, G.W.C.2    Ng, C.S.K.3
  • 14
    • 19744383015 scopus 로고    scopus 로고
    • Discussion of 'Risk assessment for construction joint ventures in China' by L. Y. Shen, George W. C. Wu, and Catherine S. K. Ng
    • Tse, R. Y. C., "Discussion of 'Risk assessment for construction joint ventures in China' by L. Y. Shen, George W. C. Wu, and Catherine S. K. Ng." (2002). J. Constr. Eng. Manage., 128(2), 194.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 194
    • Tse, R.Y.C.1
  • 15
    • 0032667280 scopus 로고    scopus 로고
    • Political risks: Analysis of key contract clauses in China's BOT project
    • Wang, S. Q., Tiong, R. L. K., Ting, S. K., and Ashley, D. (1999). "Political risks: Analysis of key contract clauses in China's BOT project." J. Constr. Eng. Manage., 125(3), 190-197.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 190-197
    • Wang, S.Q.1    Tiong, R.L.K.2    Ting, S.K.3    Ashley, D.4
  • 16
    • 0008052876 scopus 로고    scopus 로고
    • Evaluation and management of political risks in China's BOT projects
    • Wang, S. Q., Tiong, R. L. K., Ting, S. K., and Ashley, D. (2000). "Evaluation and management of political risks in China's BOT projects." J. Constr. Eng. Manage., 126(3), 242-250.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.3 , pp. 242-250
    • Wang, S.Q.1    Tiong, R.L.K.2    Ting, S.K.3    Ashley, D.4
  • 17
    • 13944282761 scopus 로고    scopus 로고
    • China Estimation Publishing House (in Chinese)
    • Wu, X. (1999). Non parametric estimation, China Estimation Publishing House (in Chinese).
    • (1999) Non Parametric Estimation
    • Wu, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.