-
1
-
-
0003727195
-
-
2nd ed, Wiley, New York
-
Ahuja, H., Dozzi, S.P. and Abourizk, S.M. (1994) Project Management Techniques in Planning and Controlling Construction Projects, 2nd ed., Wiley, New York.
-
(1994)
Project Management Techniques in Planning and Controlling Construction Projects
-
-
Ahuja, H.1
Dozzi, S.P.2
Abourizk, S.M.3
-
3
-
-
0032346794
-
The effectiveness of working group risk identification and assessment techniques
-
Chapman, R. (1998) 'The effectiveness of working group risk identification and assessment techniques', International Journal of Project Management, Vol. 16, No. 6, pp. 333-343.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.6
, pp. 333-343
-
-
Chapman, R.1
-
4
-
-
0017539360
-
Analysis of schedule simulation
-
Crandall, C.K. (1977) 'Analysis of schedule simulation', J. Construction Division, ASCE, Vol. 133, No. 2, pp. 387-394.
-
(1977)
J. Construction Division, ASCE
, vol.133
, Issue.2
, pp. 387-394
-
-
Crandall, C.K.1
-
5
-
-
0344894852
-
Estimating project and activity duration: A risk management approach using network analysis
-
Dawood, N. (1998) 'Estimating project and activity duration: a risk management approach using network analysis', Construction Management and Economics, Vol. 16, pp. 41-48.
-
(1998)
Construction Management and Economics
, vol.16
, pp. 41-48
-
-
Dawood, N.1
-
6
-
-
0027555933
-
Non deterministic networking methods
-
Diaz, C.F. and Hadipriono, F.C. (1993) 'Non deterministic networking methods', Journal of Construction Engineering and Management, ASCE, Vol. 119, No. 1, pp. 40-57.
-
(1993)
Journal of Construction Engineering and Management, ASCE
, vol.119
, Issue.1
, pp. 40-57
-
-
Diaz, C.F.1
Hadipriono, F.C.2
-
9
-
-
0001083779
-
The triangular distribution as a proxy for the beta distribution in risk analysis
-
Johnson, D. (1997) 'The triangular distribution as a proxy for the beta distribution in risk analysis', The Statistician, Vol. 46, No. 3, pp. 387-398.
-
(1997)
The Statistician
, vol.46
, Issue.3
, pp. 387-398
-
-
Johnson, D.1
-
10
-
-
0001378333
-
Better estimation of PERT activity time parameters
-
Keefer, D.L. and Verdini, W.A. (1993) 'Better estimation of PERT activity time parameters', Management Science, Vol. 39, pp. 1086-1091.
-
(1993)
Management Science
, vol.39
, pp. 1086-1091
-
-
Keefer, D.L.1
Verdini, W.A.2
-
12
-
-
32944482015
-
Automated statistical analysis in stochastic project scheduling simulation
-
Lee, D.E. and Arditi, D. (2006) 'Automated statistical analysis in stochastic project scheduling simulation', Journal of Construction Engineering and Management, Vol. 132, No. 3, pp. 268-277.
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.3
, pp. 268-277
-
-
Lee, D.E.1
Arditi, D.2
-
13
-
-
34848892962
-
A model for product risk estimation through corporate memory and techniques integration
-
WSEAS Press, Skiathos, Greece, pp
-
Leopoulos, V., Kirytopoulos, K. and Bellos, V. (2002) 'A model for product risk estimation through corporate memory and techniques integration', Proceedings of the Advances in Multimedia, Video and Signal Processing Systems Conference, WSEAS Press, Skiathos, Greece, pp. 302-307.
-
(2002)
Proceedings of the Advances in Multimedia, Video and Signal Processing Systems Conference
, pp. 302-307
-
-
Leopoulos, V.1
Kirytopoulos, K.2
Bellos, V.3
-
14
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
Malcolm, D.G., Rooseboom, J.H., Clarkm, C.E. and Fazer, W. (1959) 'Application of a technique for research and development program evaluation', Operations Research, Vol. 7, pp. 646-669.
-
(1959)
Operations Research
, vol.7
, pp. 646-669
-
-
Malcolm, D.G.1
Rooseboom, J.H.2
Clarkm, C.E.3
Fazer, W.4
-
16
-
-
13944275955
-
Evaluating Risk in Construction - Schedule Model (ERIC-S): Construction schedule risk model
-
Nasir, D., McGabe, B. and Hartono, L. (2003) 'Evaluating Risk in Construction - Schedule Model (ERIC-S): construction schedule risk model', Journal of Construction Engineering and Management, Vol. 129, No. 5, pp. 518-527.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 518-527
-
-
Nasir, D.1
McGabe, B.2
Hartono, L.3
-
17
-
-
20544431718
-
Judgemental risk analysis process development in construction projects
-
Oztas, A. and Okmen, O. (2005) 'Judgemental risk analysis process development in construction projects', Building and Environment, Vol. 40, pp. 1244-1254.
-
(2005)
Building and Environment
, vol.40
, pp. 1244-1254
-
-
Oztas, A.1
Okmen, O.2
-
18
-
-
0343580653
-
-
Springer-Verlang, Berlin-Heidelberg, New York
-
Pagnoni, A. (1990) Project Engineering, Springer-Verlang, Berlin-Heidelberg, New York.
-
(1990)
Project Engineering
-
-
Pagnoni, A.1
-
20
-
-
0023532720
-
Probabilistic project management
-
Pohl, J. and Chapman, A. (1987) 'Probabilistic project management', Building and Environment, Vol. 22, No. 3, pp. 209-214.
-
(1987)
Building and Environment
, vol.22
, Issue.3
, pp. 209-214
-
-
Pohl, J.1
Chapman, A.2
-
21
-
-
34848830678
-
Business process engineering with ARIS simulation - a case study of a call centre operation assessment
-
Ponis, S.T., Hadzilias, E.A. and Panayiotou, NA. (2004) 'Business process engineering with ARIS simulation - a case study of a call centre operation assessment', WSEAS Transactions on Business and Economics, Vol. 1, No. 4, pp. 338-343.
-
(2004)
WSEAS Transactions on Business and Economics
, vol.1
, Issue.4
, pp. 338-343
-
-
Ponis, S.T.1
Hadzilias, E.A.2
Panayiotou, N.A.3
-
22
-
-
0035113601
-
An approximation of the activity duration distribution in PERT
-
Premachandra, I.M. (2001) 'An approximation of the activity duration distribution in PERT', Computers and Operations Research, Vol. 28, pp. 443-452.
-
(2001)
Computers and Operations Research
, vol.28
, pp. 443-452
-
-
Premachandra, I.M.1
-
23
-
-
0000302001
-
GERT: Graphical evaluation and review technique; PERT', fundamentals
-
Pritsker, A.A.B. and Happ, W.W. (1966) 'GERT: graphical evaluation and review technique; PERT', fundamentals', The Journal of Industrial Engineering, Vol. 17, No. 5, pp. 267-274.
-
(1966)
The Journal of Industrial Engineering
, vol.17
, Issue.5
, pp. 267-274
-
-
Pritsker, A.A.B.1
Happ, W.W.2
-
24
-
-
0006692137
-
Risk analysis for revenue dependent infrastructure projects
-
Songer, A.D., Diekmann, J. and Pecsok, R.S. (1997) 'Risk analysis for revenue dependent infrastructure projects', Construction Management and Economics, Vol. 15, pp. 377-382.
-
(1997)
Construction Management and Economics
, vol.15
, pp. 377-382
-
-
Songer, A.D.1
Diekmann, J.2
Pecsok, R.S.3
-
25
-
-
0027608173
-
Risk taking in stochastic PERT networks
-
Soroush, H. (1993) 'Risk taking in stochastic PERT networks', European Journal of Operational Research, Vol. 67, pp. 221-241.
-
(1993)
European Journal of Operational Research
, vol.67
, pp. 221-241
-
-
Soroush, H.1
-
26
-
-
0026881995
-
Monte Carlo technique with correlated random variables
-
Touran, A. (1992) 'Monte Carlo technique with correlated random variables', Journal of Construction Engineering Management, Vol. 118, No. 2, pp.258-272.
-
(1992)
Journal of Construction Engineering Management
, vol.118
, Issue.2
, pp. 258-272
-
-
Touran, A.1
-
28
-
-
0033524327
-
Statistical dependence in risk analysis for project networks using Monte Carlo Methods
-
van Dorp, J. R. and Duffey, M. R. (1999) 'Statistical dependence in risk analysis for project networks using Monte Carlo Methods', International Journal of Production Economics, Vol. 58, pp. 17-29.
-
(1999)
International Journal of Production Economics
, vol.58
, pp. 17-29
-
-
van Dorp, J.R.1
Duffey, M.R.2
-
29
-
-
0000738834
-
Monte Carlo methods and the PERT problem
-
van Slyke, R.M. (1963) 'Monte Carlo methods and the PERT problem', Operations Research, Vol. 11, No. 5, pp. 839-860.
-
(1963)
Operations Research
, vol.11
, Issue.5
, pp. 839-860
-
-
van Slyke, R.M.1
-
31
-
-
27944510967
-
Impact of soft logic on the probabilistic duration of construction projects
-
Wang, W.C. (2005) 'Impact of soft logic on the probabilistic duration of construction projects', International Journal of Project Management, Vol. 23, No. 8, pp. 60-610.
-
(2005)
International Journal of Project Management
, vol.23
, Issue.8
, pp. 60-610
-
-
Wang, W.C.1
|