메뉴 건너뛰기




Volumn 14, Issue 5, 2007, Pages 624-638

Benchmarking the performance of design-build projects: Development of project success index

Author keywords

Benchmarking; Construction industry; Critical success factors; Hong Kong; Project management

Indexed keywords


EID: 34548032751     PISSN: 14635771     EISSN: None     Source Type: Journal    
DOI: 10.1108/14635770710819290     Document Type: Article
Times cited : (56)

References (42)
  • 1
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson, R. (1999), "Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria", International Journal of Project Management, Vol. 17 No. 6, pp. 337-42.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-42
    • Atkinson, R.1
  • 4
    • 0003320485 scopus 로고    scopus 로고
    • Evaluation of enhanced design and build system - A case study of a hospital project
    • Chan, A.P.C. (2000), "Evaluation of enhanced design and build system - a case study of a hospital project", Construction Management and Economics, Vol. 18 No. 8, pp. 863-71.
    • (2000) Construction Management and Economics , vol.18 , Issue.8 , pp. 863-71
    • Chan, A.P.C.1
  • 5
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • Chan, A.P.C. and Chan, A.P.L. (2004), "Key performance indicators for measuring construction success", Benchmarking - An International Journal, Vol. 11 No. 2, pp. 203-21.
    • (2004) Benchmarking - An International Journal , vol.11 , Issue.2 , pp. 203-21
    • Chan, A.P.C.1    Chan, A.P.L.2
  • 7
    • 34548008674 scopus 로고    scopus 로고
    • Evaluation criteria of public-sector design and build projects in Hong Kong
    • Chan, A.P.C., Ho, D.C.K. and Tam, C.M. (2001), "Evaluation criteria of public-sector design and build projects in Hong Kong", Journal of Construction Research, Vol. 2 No. 2, pp. 135-45.
    • (2001) Journal of Construction Research , vol.2 , Issue.2 , pp. 135-45
    • Chan, A.P.C.1    Ho, D.C.K.2    Tam, C.M.3
  • 8
    • 0242434228 scopus 로고    scopus 로고
    • Framework of success criteria for design-build projects
    • Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002), "Framework of success criteria for design-build projects", Journal of Management in Engineering, Vol. 18 No. 3, pp. 120-8.
    • (2002) Journal of Management in Engineering , vol.18 , Issue.3 , pp. 120-8
    • Chan, A.P.C.1    Scott, D.2    Lam, E.W.M.3
  • 9
    • 0942306050 scopus 로고    scopus 로고
    • Department of Building and Real Estate, The Hong Kong Polytechnic University Hong Kong
    • Cheng, E.W.L. (2001), "A practical model for construction partnering", unpublished PhD thesis, Department of Building and Real Estate, The Hong Kong Polytechnic University, Hong Kong.
    • (2001) A Practical Model for Construction Partnering
    • Cheng, E.W.L.1
  • 14
    • 20444496935 scopus 로고    scopus 로고
    • Critical success factors in developing teleworking programs
    • Kowalski, K.B. and Swanson, J.A. (2005), "Critical success factors in developing teleworking programs", Benchmarking: An International Journal, Vol. 12 No. 3, pp. 236-49.
    • (2005) Benchmarking: An International Journal , vol.12 , Issue.3 , pp. 236-49
    • Kowalski, K.B.1    Swanson, J.A.2
  • 15
    • 34548050036 scopus 로고    scopus 로고
    • Occupational Safety and Health Branch, Labour Department, October, The Government of The Hong Kong Special Administrative Region
    • Labour Department (2000), Accident Statistics Bulletin, No. 3, Occupational Safety and Health Branch, Labour Department, October, The Government of The Hong Kong Special Administrative Region.
    • (2000) Accident Statistics Bulletin , Issue.3
    • Department, L.1
  • 16
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: An exploratory re-examination
    • Lim, C.S. and Mohamed, M.Z. (1999), "Criteria of project success: an exploratory re-examination", International Journal of Project Management, Vol. 17 No. 4, pp. 243-8.
    • (1999) International Journal of Project Management , vol.17 , Issue.4 , pp. 243-8
    • Lim, C.S.1    Mohamed, M.Z.2
  • 18
    • 18844435170 scopus 로고    scopus 로고
    • A typology of 'best practices' for a benchmarking process
    • Maire, J.L., Bronet, V. and Pillet, M. (2005), "A typology of 'best practices' for a benchmarking process", Benchmarking: An International Journal, Vol. 12 No. 1, pp. 45-60.
    • (2005) Benchmarking: An International Journal , vol.12 , Issue.1 , pp. 45-60
    • Maire, J.L.1    Bronet, V.2    Pillet, M.3
  • 20
    • 23744466046 scopus 로고    scopus 로고
    • Innovation or imitation? Benchmarking: A knowledge-management process to innovate services
    • Massa, S. and Testa, S. (2004), "Innovation or imitation? Benchmarking: a knowledge-management process to innovate services", Benchmarking: An International Journal, Vol. 11 No. 6, pp. 610-20.
    • (2004) Benchmarking: An International Journal , vol.11 , Issue.6 , pp. 610-20
    • Massa, S.1    Testa, S.2
  • 21
    • 0035482326 scopus 로고    scopus 로고
    • Design-builder selection for small highway projects
    • Molenaar, K.R. and Gransberg, D.D. (2001), "Design-builder selection for small highway projects", Journal of Management in Engineering, Vol. 17 No. 5, pp. 214-23.
    • (2001) Journal of Management in Engineering , vol.17 , Issue.5 , pp. 214-23
    • Molenaar, K.R.1    Gransberg, D.D.2
  • 22
    • 0035479054 scopus 로고    scopus 로고
    • Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: A call for change
    • Moore, D.R. and Dainty, A.R.J. (2001), "Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change", Construction Management and Economics, Vol. 19 No. 6, pp. 559-62.
    • (2001) Construction Management and Economics , vol.19 , Issue.6 , pp. 559-62
    • Moore, D.R.1    Dainty, A.R.J.2
  • 23
    • 33644527628 scopus 로고    scopus 로고
    • Comparative evaluation of practices: Lessons from R&D organizations
    • Mrinalini, N. and Nath, P. (2006), "Comparative evaluation of practices: lessons from R&D organizations", Benchmarking: An International Journal, Vol. 13 Nos 1/2, pp. 214-23.
    • (2006) Benchmarking: An International Journal , vol.13 , Issue.12 , pp. 214-23
    • Mrinalini, N.1    Nath, P.2
  • 24
    • 0028732528 scopus 로고
    • Critical analysis of time and cost of management and traditional contracts
    • Naoum, S.G. (1994), "Critical analysis of time and cost of management and traditional contracts", Journal of Construction Engineering and Management, Vol. 120 No. 4, pp. 687-705.
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.4 , pp. 687-705
    • Naoum, S.G.1
  • 26
    • 0027623833 scopus 로고
    • Checklist of critical success factors for building projects
    • Parfitt, M.K. and Sanvido, V.E. (1993), "Checklist of critical success factors for building projects", Journal of Management in Engineering, Vol. 9 No. 3, pp. 243-9.
    • (1993) Journal of Management in Engineering , vol.9 , Issue.3 , pp. 243-9
    • Parfitt, M.K.1    Sanvido, V.E.2
  • 27
    • 0032207790 scopus 로고    scopus 로고
    • Project delivery and the US department of state
    • Retherford, N. (1998), "Project delivery and the US department of state", Journal of Management in Engineering, Vol. 14 No. 6, pp. 55-8.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.6 , pp. 55-8
    • Retherford, N.1
  • 28
    • 23744508773 scopus 로고    scopus 로고
    • Benchmarking concepts in the UK and Germany a shared understanding among key players?
    • Rohlfer, S. (2004), "Benchmarking concepts in the UK and Germany a shared understanding among key players?", Benchmarking: An International Journal, Vol. 11 No. 5, pp. 521-39.
    • (2004) Benchmarking: An International Journal , vol.11 , Issue.5 , pp. 521-39
    • Rohlfer, S.1
  • 29
    • 34548008922 scopus 로고    scopus 로고
    • Procurement systems: The view from Hong Kong
    • University de Montreal Montreal 20-23 May
    • Rowlinson, S. (1997), "Procurement systems: the view from Hong Kong", CIB W92 Procurement - A Key to Innovation, University de Montreal, Montreal, 20-23 May, pp. 665-72.
    • (1997) CIB W92 Procurement - A Key to Innovation , pp. 665-72
    • Rowlinson, S.1
  • 32
    • 0002540586 scopus 로고    scopus 로고
    • Mapping the dimensions of project success
    • Shenhar, A.J., Levy, O. and Dvir, D. (1997), "Mapping the dimensions of project success", Project Management Journal, Vol. 28 No. 2, pp. 5-13.
    • (1997) Project Management Journal , vol.28 , Issue.2 , pp. 5-13
    • Shenhar, A.J.1    Levy, O.2    Dvir, D.3
  • 34
    • 0008157874 scopus 로고    scopus 로고
    • Selection factors and success criteria for design-build in the US and UK
    • Songer, A.D. and Molenaar, K.R. (1996), "Selection factors and success criteria for design-build in the US and UK", Journal of Construction Procurement, Vol. 2 No. 2, pp. 69-82.
    • (1996) Journal of Construction Procurement , vol.2 , Issue.2 , pp. 69-82
    • Songer, A.D.1    Molenaar, K.R.2
  • 35
  • 36
    • 28344440659 scopus 로고    scopus 로고
    • Using routine data for benchmarking and performance measurement of public hospitals in New Zealand
    • Stevanovic, V., Feek, C. and Kay, R. (2005), "Using routine data for benchmarking and performance measurement of public hospitals in New Zealand", Benchmarking: An International Journal, Vol. 12 No. 6, pp. 498-507.
    • (2005) Benchmarking: An International Journal , vol.12 , Issue.6 , pp. 498-507
    • Stevanovic, V.1    Feek, C.2    Kay, R.3
  • 38
    • 20444457564 scopus 로고    scopus 로고
    • Benchmarking in the non-profit sector in Australia
    • Tyler, M.C. (2005), "Benchmarking in the non-profit sector in Australia", Benchmarking: An International Journal, Vol. 12 No. 3, pp. 219-35.
    • (2005) Benchmarking: An International Journal , vol.12 , Issue.3 , pp. 219-35
    • Tyler, M.C.1
  • 39
    • 0029411707 scopus 로고
    • Use of design-build in E/C industry
    • Yates, J.K. (1995), "Use of design-build in E/C industry", Journal of Management in Engineering, Vol. 11 No. 6, pp. 33-8.
    • (1995) Journal of Management in Engineering , vol.11 , Issue.6 , pp. 33-8
    • Yates, J.K.1
  • 41
    • 0036540210 scopus 로고    scopus 로고
    • Fuzzy membership functions of procurement selection criteria
    • Ng, S.T., Luu, D.T., Chen, S.E. and Lam, K.C. (2002), "Fuzzy membership functions of procurement selection criteria", Construction Management and Economics, Vol. 20 No. 3, pp. 285-96.
    • (2002) Construction Management and Economics , vol.20 , Issue.3 , pp. 285-96
    • Ng, S.T.1    Luu, D.T.2    Chen, S.E.3    Lam, K.C.4
  • 42
    • 0002461625 scopus 로고    scopus 로고
    • The contribution of the construction management team to good construction time performance - An Australian experience
    • Walker, D.H.T. (1996), "The contribution of the construction management team to good construction time performance - an Australian experience", Journal of Construction Procurement, Vol. 2 No. 2, pp. 4-18.
    • (1996) Journal of Construction Procurement , vol.2 , Issue.2 , pp. 4-18
    • Walker, D.H.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.