메뉴 건너뛰기




Volumn 33, Issue 3-4, 2007, Pages 334-344

Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry

Author keywords

(SMED) Single minute exchange of dies; Changeover; Internal and external setups; MTM (Method time measurements); Sustainability; TPM (Total Productive Maintenance)

Indexed keywords

AUTOMOTIVE INDUSTRY; PROBLEM SOLVING; SUSTAINABLE DEVELOPMENT;

EID: 34547626244     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-006-0466-x     Document Type: Article
Times cited : (36)

References (16)
  • 3
    • 5044227167 scopus 로고    scopus 로고
    • Implementing total productive maintenance in Nigerian manufacturing industries
    • Eti MC, Ogaji SOT, Robert SD (2004) Implementing total productive maintenance in Nigerian manufacturing industries. Appl Energy 79:385-401
    • (2004) Appl Energy , vol.79 , pp. 385-401
    • Eti, M.C.1    Ogaji, S.O.T.2    Robert, S.D.3
  • 4
    • 0033732070 scopus 로고    scopus 로고
    • Implementation of TPM in cellular manufacture
    • Chand G, Shirvani B (2000) Implementation of TPM in cellular manufacture. J Mater Process Technol 103:149-154
    • (2000) J Mater Process Technol , vol.103 , pp. 149-154
    • Chand, G.1    Shirvani, B.2
  • 5
    • 0142247474 scopus 로고    scopus 로고
    • The implementation and evaluation of total productive maintenance (TPM)-an action case study in a Hong Kong manufacturing company
    • Sun H, Yam R, Wai-Keung NG (2003) The implementation and evaluation of total productive maintenance (TPM)-an action case study in a Hong Kong manufacturing company. Int J Adv Manuf Technol 22:224-228
    • (2003) Int J Adv Manuf Technol , vol.22 , pp. 224-228
    • Sun, H.1    Yam, R.2    Wai-Keung, N.G.3
  • 6
    • 0442326750 scopus 로고    scopus 로고
    • Beyond quality circles and improvement teams
    • 6
    • Prado JC (2001) Beyond quality circles and improvement teams. Total Qual Manage 12(6):789-798
    • (2001) Total Qual Manage , vol.12 , pp. 789-798
    • Prado, J.C.1
  • 7
    • 0034175343 scopus 로고    scopus 로고
    • Lean production: A study of application in a traditional manufacturing environment
    • 3
    • Bamber L, Dale BG (2000) Lean production: A study of application in a traditional manufacturing environment. ProdnPlan Control 11(3):291-298
    • (2000) ProdnPlan Control , vol.11 , pp. 291-298
    • Bamber, L.1    Dale, B.G.2
  • 8
    • 0442326186 scopus 로고    scopus 로고
    • Implementing total productive maintenance in multi-union manufacturing organizations: Overcoming job demarcation
    • 2
    • McAdam R, McGeough F (2000) Implementing total productive maintenance in multi-union manufacturing organizations: Overcoming job demarcation. Total Qual Manage 11(2):187-197
    • (2000) Total Qual Manage , vol.11 , pp. 187-197
    • McAdam, R.1    McGeough, F.2
  • 9
    • 0030540736 scopus 로고    scopus 로고
    • Set-up reduction in pharmaceutical manufacturing: An action research study
    • 3
    • Gilmore M, Smith DJ (1996) Set-up reduction in pharmaceutical manufacturing: an action research study. Int J Oper Prod Manage 16(3):4-17
    • (1996) Int J Oper Prod Manage , vol.16 , pp. 4-17
    • Gilmore, M.1    Smith, D.J.2
  • 10
    • 26844481394 scopus 로고    scopus 로고
    • Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment
    • 4
    • Moxham C, Greatbanks R (2001) Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. Int J Qual Reliab Manage 18(4):404-414
    • (2001) Int J Qual Reliab Manage , vol.18 , pp. 404-414
    • Moxham, C.1    Greatbanks, R.2
  • 11
    • 0030518962 scopus 로고    scopus 로고
    • An assessment of the role of design in the improvement of changeover performance
    • 9
    • McIntosh R, Culley S, Gest G, Mileham T, Owen G (1996) An assessment of the role of design in the improvement of changeover performance. Int J Oper Prod Manage 16(9):5-22
    • (1996) Int J Oper Prod Manage , vol.16 , pp. 5-22
    • McIntosh, R.1    Culley, S.2    Gest, G.3    Mileham, T.4    Owen, G.5
  • 12
    • 0036609402 scopus 로고    scopus 로고
    • Rules for integrating fast changeover capabilities into new equipment design
    • Van Goubergen D, Van Landeghem H (2002) Rules for integrating fast changeover capabilities into new equipment design. Robot Comput Integr Manuf 18:205-214
    • (2002) Robot Comput Integr Manuf , vol.18 , pp. 205-214
    • Van Goubergen, D.1    Van Landeghem, H.2
  • 14
    • 84986097842 scopus 로고    scopus 로고
    • Set-up time reduction and mistake proofing methods: A study of application in a small company
    • 1
    • Patel S, Shaw P, Dale BG (2001) Set-up time reduction and mistake proofing methods: A study of application in a small company. Bus Process Manage J 7(1):65-75
    • (2001) Bus Process Manage J , vol.7 , pp. 65-75
    • Patel, S.1    Shaw, P.2    Dale, B.G.3
  • 16
    • 34547620773 scopus 로고
    • MTM-UAS
    • MTM-UAS (1995) Instructor manual. German MTM Association
    • (1995) Instructor Manual


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.