-
3
-
-
5044227167
-
Implementing total productive maintenance in Nigerian manufacturing industries
-
Eti MC, Ogaji SOT, Robert SD (2004) Implementing total productive maintenance in Nigerian manufacturing industries. Appl Energy 79:385-401
-
(2004)
Appl Energy
, vol.79
, pp. 385-401
-
-
Eti, M.C.1
Ogaji, S.O.T.2
Robert, S.D.3
-
4
-
-
0033732070
-
Implementation of TPM in cellular manufacture
-
Chand G, Shirvani B (2000) Implementation of TPM in cellular manufacture. J Mater Process Technol 103:149-154
-
(2000)
J Mater Process Technol
, vol.103
, pp. 149-154
-
-
Chand, G.1
Shirvani, B.2
-
5
-
-
0142247474
-
The implementation and evaluation of total productive maintenance (TPM)-an action case study in a Hong Kong manufacturing company
-
Sun H, Yam R, Wai-Keung NG (2003) The implementation and evaluation of total productive maintenance (TPM)-an action case study in a Hong Kong manufacturing company. Int J Adv Manuf Technol 22:224-228
-
(2003)
Int J Adv Manuf Technol
, vol.22
, pp. 224-228
-
-
Sun, H.1
Yam, R.2
Wai-Keung, N.G.3
-
6
-
-
0442326750
-
Beyond quality circles and improvement teams
-
6
-
Prado JC (2001) Beyond quality circles and improvement teams. Total Qual Manage 12(6):789-798
-
(2001)
Total Qual Manage
, vol.12
, pp. 789-798
-
-
Prado, J.C.1
-
7
-
-
0034175343
-
Lean production: A study of application in a traditional manufacturing environment
-
3
-
Bamber L, Dale BG (2000) Lean production: A study of application in a traditional manufacturing environment. ProdnPlan Control 11(3):291-298
-
(2000)
ProdnPlan Control
, vol.11
, pp. 291-298
-
-
Bamber, L.1
Dale, B.G.2
-
8
-
-
0442326186
-
Implementing total productive maintenance in multi-union manufacturing organizations: Overcoming job demarcation
-
2
-
McAdam R, McGeough F (2000) Implementing total productive maintenance in multi-union manufacturing organizations: Overcoming job demarcation. Total Qual Manage 11(2):187-197
-
(2000)
Total Qual Manage
, vol.11
, pp. 187-197
-
-
McAdam, R.1
McGeough, F.2
-
9
-
-
0030540736
-
Set-up reduction in pharmaceutical manufacturing: An action research study
-
3
-
Gilmore M, Smith DJ (1996) Set-up reduction in pharmaceutical manufacturing: an action research study. Int J Oper Prod Manage 16(3):4-17
-
(1996)
Int J Oper Prod Manage
, vol.16
, pp. 4-17
-
-
Gilmore, M.1
Smith, D.J.2
-
10
-
-
26844481394
-
Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment
-
4
-
Moxham C, Greatbanks R (2001) Prerequisites for the implementation of the SMED methodology: A study in a textile processing environment. Int J Qual Reliab Manage 18(4):404-414
-
(2001)
Int J Qual Reliab Manage
, vol.18
, pp. 404-414
-
-
Moxham, C.1
Greatbanks, R.2
-
11
-
-
0030518962
-
An assessment of the role of design in the improvement of changeover performance
-
9
-
McIntosh R, Culley S, Gest G, Mileham T, Owen G (1996) An assessment of the role of design in the improvement of changeover performance. Int J Oper Prod Manage 16(9):5-22
-
(1996)
Int J Oper Prod Manage
, vol.16
, pp. 5-22
-
-
McIntosh, R.1
Culley, S.2
Gest, G.3
Mileham, T.4
Owen, G.5
-
12
-
-
0036609402
-
Rules for integrating fast changeover capabilities into new equipment design
-
Van Goubergen D, Van Landeghem H (2002) Rules for integrating fast changeover capabilities into new equipment design. Robot Comput Integr Manuf 18:205-214
-
(2002)
Robot Comput Integr Manuf
, vol.18
, pp. 205-214
-
-
Van Goubergen, D.1
Van Landeghem, H.2
-
14
-
-
84986097842
-
Set-up time reduction and mistake proofing methods: A study of application in a small company
-
1
-
Patel S, Shaw P, Dale BG (2001) Set-up time reduction and mistake proofing methods: A study of application in a small company. Bus Process Manage J 7(1):65-75
-
(2001)
Bus Process Manage J
, vol.7
, pp. 65-75
-
-
Patel, S.1
Shaw, P.2
Dale, B.G.3
-
16
-
-
34547620773
-
-
MTM-UAS
-
MTM-UAS (1995) Instructor manual. German MTM Association
-
(1995)
Instructor Manual
-
-
|