-
2
-
-
0023401969
-
Any machine setup time can be reduced by 75%
-
Hay, E.J., "Any machine setup time can be reduced by 75%", Industrial Engineering, Vol. 19 No. 8, 1987, pp. 62-7.
-
(1987)
Industrial Engineering
, vol.19
, Issue.8
, pp. 62-7
-
-
Hay, E.J.1
-
3
-
-
0004020438
-
-
Productivity Press Cambridge, MA
-
Sekine, K. and Arai, K., Kaizen for Quick Changeover, Productivity Press, Cambridge, MA, 1992.
-
(1992)
Kaizen for Quick Changeover
-
-
Sekine, K.1
Arai, K.2
-
4
-
-
3543109707
-
-
Proceedings of 2nd International Conference on JIT Manufacturing IFS Publications, Bedford
-
Lee, D.L., Set-Up Time Reduction: Making JIT Work, Proceedings of 2nd International Conference on JIT Manufacturing, IFS Publications, Bedford, 1987.
-
(1987)
Set-Up Time Reduction: Making JIT Work
-
-
Lee, D.L.1
-
5
-
-
3543124833
-
-
IMechE Total Productive Maintenance Workshops Stratford-upon-Avon
-
Jones, J., Achieving Quick Changeover, IMechE Total Productive Maintenance Workshops, Stratford-upon-Avon, 1994.
-
(1994)
Achieving Quick Changeover
-
-
Jones, J.1
-
8
-
-
0012503965
-
Rule based approach to just-in-time manufacturing
-
Pegler, H.C. and Kochhar, A.K., "Rule based approach to just-in-time manufacturing", Computer-Integrated Manufacturing Systems, Vol. 3 No. 1, 1990, pp. 11-18.
-
(1990)
Computer-Integrated Manufacturing Systems
, vol.3
, Issue.1
, pp. 11-18
-
-
Pegler, H.C.1
Kochhar, A.K.2
-
9
-
-
0022796839
-
A lesson in SMED with Shigeo Shingo
-
Johansen, P. and McGuire, K.J., "A lesson in SMED with Shigeo Shingo", Industrial Engineering, Vol. 18 No. 10, 1986, pp. 26-33.
-
(1986)
Industrial Engineering
, vol.18
, Issue.10
, pp. 26-33
-
-
Johansen, P.1
McGuire, K.J.2
-
10
-
-
0004102424
-
-
Dow Jones-Irwin Homewood, IL
-
Hall, R.W., Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983.
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
12
-
-
3543117904
-
-
Proceedings of 48th Annual Technical Conference of Society of Plastics Engineers Dallas
-
Oishi, O., Total Quick Mold Change, Proceedings of 48th Annual Technical Conference of Society of Plastics Engineers, Dallas, 1990.
-
(1990)
Total Quick Mold Change
-
-
Oishi, O.1
-
13
-
-
0028698396
-
-
Proceedings of IEE Factory 2000 University of York
-
McIntosh, R., Culley, S.J., Gest, G. and Mileham, A.R., Achieving and Optimising Flexible Manufacturing Performance on Existing Manufacturing Systems, Proceedings of IEE Factory 2000, University of York, 1994.
-
(1994)
Achieving and Optimising Flexible Manufacturing Performance on Existing Manufacturing Systems
-
-
McIntosh, R.1
Culley, S.J.2
Gest, G.3
Mileham, A.R.4
-
14
-
-
0027624322
-
Manufacturing flexibility and profitability
-
Olhager, J., "Manufacturing flexibility and profitability", International Journal of Production Economics, Vol. 30 No. 1, 1993, pp. 67-78.
-
(1993)
International Journal of Production Economics
, vol.30
, Issue.1
, pp. 67-78
-
-
Olhager, J.1
-
15
-
-
3543074674
-
-
University of Bath School of Mechanical Engineering, Document ref. 065/94/RIM
-
McIntosh, R., Gest, G. and Owen, G., The Relative Merits of Set-Up Reduction and Surplus Capacity to Attain Manufacturing Flexibility, University of Bath, School of Mechanical Engineering, Document ref. 065/94/RIM, 1994.
-
(1994)
The Relative Merits of Set-Up Reduction and Surplus Capacity to Attain Manufacturing Flexibility
-
-
McIntosh, R.1
Gest, G.2
Owen, G.3
-
16
-
-
0009350544
-
The effect of capacity limitations on safety stock
-
Mapes, J., "The effect of capacity limitations on safety stock", International Journal of Operations & Production Management, Vol. 13 No. 10, 1992, pp. 26-33.
-
(1992)
International Journal of Operations & Production Management
, vol.13
, Issue.10
, pp. 26-33
-
-
Mapes, J.1
-
17
-
-
0026187485
-
Turning out faster setups
-
Noaker, P.M., "Turning out faster setups", Manufacturing Engineering, Vol. 107 No. 1, 1991, pp. 43-46.
-
(1991)
Manufacturing Engineering
, vol.107
, Issue.1
, pp. 43-46
-
-
Noaker, P.M.1
-
18
-
-
0025519097
-
Why change programs don't produce change
-
Beer, M., Eisenstat, R.A. and Spector, B., "Why change programs don't produce change", Harvard Business Review, Vol. 68 No. 6, 1990, pp. 158-66.
-
(1990)
Harvard Business Review
, vol.68
, Issue.6
, pp. 158-66
-
-
Beer, M.1
Eisenstat, R.A.2
Spector, B.3
-
19
-
-
0024737593
-
Driving down downtime
-
Hay, E.J., "Driving down downtime", Manufacturing Engineering, Vol. 103 No. 3, 1989, pp. 41-4.
-
(1989)
Manufacturing Engineering
, vol.103
, Issue.3
, pp. 41-4
-
-
Hay, E.J.1
-
20
-
-
0002058863
-
Employee participation: A critical evaluation and suggestions for management practice
-
Stanton, E.S., "Employee participation: a critical evaluation and suggestions for management practice", SAM Advanced Management Journal, Vol. 58 No. 4, 1993, pp. 18-23.
-
(1993)
SAM Advanced Management Journal
, vol.58
, Issue.4
, pp. 18-23
-
-
Stanton, E.S.1
-
21
-
-
78049377645
-
Manufacturing revitalisation at Harley-Davidson Motor Co
-
Sepehri, M., "Manufacturing revitalisation at Harley-Davidson Motor Co.", Industrial Engineer, 1987.
-
(1987)
Industrial Engineer
-
-
Sepehri, M.1
-
22
-
-
0026218929
-
Pressed to reduce set up?
-
Noaker, P., "Pressed to reduce set up?", Manufacturing Engineering, Vol. 107 No. 3, 1991, pp. 45-9.
-
(1991)
Manufacturing Engineering
, vol.107
, Issue.3
, pp. 45-9
-
-
Noaker, P.1
-
23
-
-
0023454652
-
The key to single-digit-changeover
-
Poling, D., "The key to single-digit-changeover", Modern Machine Shop, Vol. 60 No. 6, 1987, pp. 78-86.
-
(1987)
Modern Machine Shop
, vol.60
, Issue.6
, pp. 78-86
-
-
Poling, D.1
-
24
-
-
3543115618
-
A turn to setup time reduction
-
February 1992
-
Mason, F., "A turn to setup time reduction", American Machinist, February 1992, pp. 53-7.
-
American Machinist
, pp. 53-7
-
-
Mason, F.1
|