메뉴 건너뛰기




Volumn , Issue , 2005, Pages 279-285

Intelligent optimal production scheduling estimator

Author keywords

[No Author keywords available]

Indexed keywords

BLOCK EXTRACTION; COMPLEX MODELING; COMPUTATIONAL TASK; DYNAMIC DECISION NETWORK; DYNAMIC EXPANSION; FINAL PIT LIMIT; OPEN PIT; OPEN PIT MINES; OPERATION RESEARCH; OPTIMAL PRODUCTION; OPTIMAL PRODUCTION SCHEDULE; OPTIMIZATION PROBLEMS; PARTIALLY OBSERVABLE MARKOV DECISION PROCESS; POLICY ITERATION; PRODUCTION SCHEDULE; PRODUCTION SCHEDULING; PROFIT MAXIMIZATION; PUSHBACKS; REALISTIC MODEL; STOCHASTIC NATURE; STOCHASTIC OPTIMIZATION MODEL; STOCHASTIC VARIABLE; TRANSITION MODEL;

EID: 84856865173     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (5)

References (24)
  • 2
    • 0000688427 scopus 로고
    • Optimal blending of mine production using goal programming and interactive graphics system
    • Reclamation and Environment
    • Chanda, E. K. and K. Dagdelen (1995). "Optimal Blending of Mine Production Using Goal Programming and Interactive Graphics System." International Journal of Surface Mining. Reclamation and Environment: 203-208.
    • (1995) International Journal of Surface Mining , pp. 203-208
    • Chanda, E.K.1    Dagdelen, K.2
  • 3
    • 0006896720 scopus 로고
    • An epd model of open pit short term production scheduling optimization for stratiform orebodies
    • SME
    • Chanda, E. K. and F. L. Wilke (1992). An Epd Model of Open Pit Short Term Production Scheduling Optimization for Stratiform Orebodies. 23rd APCOM Symposium, SME.
    • (1992) 23rd APCOM Symposium
    • Chanda, E.K.1    Wilke, F.L.2
  • 8
    • 0035485573 scopus 로고    scopus 로고
    • A simulative model for optimum open pit design
    • Erarslan, K. and N. Celebi (2001). "A Simualtive Model for Optimum Open Pit Design." The Canadian Mining and Metallurgical Bulletin. 94(Octobor): 59-68. (Pubitemid 33136900)
    • (2001) CIM Bulletin , vol.94 , Issue.1055 , pp. 59-68
    • Erarslan, K.1    Celebi, N.2
  • 10
    • 0002508229 scopus 로고    scopus 로고
    • Stochastic-optimization annealing of an intelligent open pit mine design
    • Frimpong, S., Whiting J. M. and Szymanski J. 1998 "Stochastic - Optimization Annealing of an Intelligent Open Pit Mine Design" Mineral Resource Engineering Vol. 7, No. 1. Imperial College Press, London, UK p:15-27. (Pubitemid 128645171)
    • (1998) Mineral Resources Engineering , vol.7 , Issue.1 , pp. 15-27
    • Frimpong, S.1    Whiting, J.M.2    Szymanski, J.3
  • 12
    • 0002258755 scopus 로고
    • A computer design of ultimate pit limit by using transportation algorithm
    • Arizona, SME, Littleton, Colorado
    • Huttagosol, P. and R. E. Cameron (1992). A Computer Design of Ultimate Pit Limit by Using Transportation Algorithm. 23rd APCOM Symposium, Arizona, SME, Littleton, Colorado.
    • (1992) 23rd APCOM Symposium
    • Huttagosol, P.1    Cameron, R.E.2
  • 16
    • 0005810359 scopus 로고
    • Rapport Technique ED 74-R-4. Montreal, Canada, Dept. of Mineral Engineering, Ecole Polytechnique de Montreal
    • Korobov, S. (1974). Method for Determining Optimal Open Pit Limits. Rapport Technique ED 74-R-4. Montreal, Canada, Dept. of Mineral Engineering, Ecole Polytechnique de Montreal.
    • (1974) Method for Determining Optimal Open Pit Limits
    • Korobov, S.1
  • 18
    • 0006941422 scopus 로고
    • Open pit short term mine planning for grade control - A combination of cad techniques and linear programming
    • SME, Colorado
    • Mann, C. and F. L. Wilke (1992). Open Pit Short Term Mine Planning for Grade Control - a Combination of Cad Techniques and Linear Programming. 23rd APCOM Symposium, SME, Colorado.
    • (1992) 23rd APCOM Symposium
    • Mann, C.1    Wilke, F.L.2
  • 19
    • 0027599370 scopus 로고
    • Open pit optimization - Part 2: Production scheduling and inclusion of roadways
    • (May-August)
    • Onur, A. H. and P. A. Dowd (1993). "Open Pit Optimization-Part 2: Production Scheduling and Inclusion of Roadways." Transactions of the Institution of Mining and Metallurgy 102(May-August): A105-A113.
    • (1993) Transactions of the Institution of Mining and Metallurgy , vol.102
    • Onur, A.H.1    Dowd, P.A.2
  • 20
    • 4243324395 scopus 로고
    • The simulation approach to open pit design
    • University of Arizona, Arizona, U.S.A
    • Pana, M. T. and R. K. Davey (1965). The Simulation Approach to Open Pit Design. Proceedings of the 5th APCOM Symposium, University of Arizona, Arizona, U.S.A
    • (1965) Proceedings of the 5th APCOM Symposium
    • Pana, M.T.1    Davey, R.K.2
  • 23
    • 0006896721 scopus 로고
    • An algorithm to estimate the optimal evolution of an open pit mine
    • University of Arizona, SME, Littleton, Colorado
    • Tolwinski, B. and R. Underwood (1992). An Algorithm to Estimate the Optimal Evolution of an Open Pit Mine. 23rd APCOM Symposium, University of Arizona, SME, Littleton, Colorado.
    • (1992) 23rd APCOM Symposium
    • Tolwinski, B.1    Underwood, R.2
  • 24
    • 0002963502 scopus 로고
    • A fast algorithm to solve the ultimate pit limit problem
    • Littleton, Colorado, AIME
    • Yegulalp, T. M. and J. A. Arias (1992). A Fast Algorithm to Solve the Ultimate Pit Limit Problem. Proceedings, 23rd APCOM Symposium, Littleton, Colorado, AIME.
    • (1992) Proceedings, 23rd APCOM Symposium
    • Yegulalp, T.M.1    Arias, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.