메뉴 건너뛰기




Volumn 10, Issue 2, 2001, Pages 185-203

Numerical simulation of surface mine production system using pit shell simulator

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0346972151     PISSN: 09506098     EISSN: None     Source Type: Journal    
DOI: 10.1142/S0950609801000609     Document Type: Article
Times cited : (6)

References (20)
  • 2
    • 0018738166 scopus 로고
    • Aspects of production planning: Operating layout and phase plans
    • eds. J. T. Crawford and W. A. Hustrulid, SME, New York
    • T. R. Couzens, Aspects of production planning: Operating layout and phase plans, Open Pit Mine Planning and Design, eds. J. T. Crawford and W. A. Hustrulid, SME, New York, 1979, 217.
    • (1979) Open Pit Mine Planning and Design , pp. 217
    • Couzens, T.R.1
  • 3
    • 0345110863 scopus 로고
    • Optimal assignment of trucks to shovels in open-pit mines
    • Clausthal
    • B. H. Daud and W. G. Pariseau, Optimal assignment of trucks to shovels in open-pit mines, Proc. 13th APCOM, Clausthal, 1975.
    • (1975) Proc. 13th APCOM
    • Daud, B.H.1    Pariseau, W.G.2
  • 4
    • 0347514256 scopus 로고    scopus 로고
    • Multivariate simulation of optimised pit shells for tactical mine planning
    • Montreal, May
    • S. Frimpong, E. Asa and J. Szymanski, Multivariate simulation of optimised pit shells for tactical mine planning, Proc. CIM'98 CD-ROM, Montreal, May 1998.
    • (1998) Proc. CIM'98 CD-ROM
    • Frimpong, S.1    Asa, E.2    Szymanski, J.3
  • 5
    • 0002508229 scopus 로고    scopus 로고
    • Stochastic-optimization annealing of an intelligent open pit design
    • Imperial College, UK
    • S. Frimpong, J. M. Whiting and J. Szymanski, Stochastic-optimization annealing of an intelligent open pit design, Mineral Resources Engineering 7, 1 (Imperial College, UK, 1998) 15-27.
    • (1998) Mineral Resources Engineering , vol.7 , Issue.1 , pp. 15-27
    • Frimpong, S.1    Whiting, J.M.2    Szymanski, J.3
  • 6
    • 0344679938 scopus 로고
    • Mine investment analysis by the generation of profitability moments
    • Tucson, Arizona
    • S. Frimpong and J. M. Whiting, Mine investment analysis by the generation of profitability moments, Proc. 23rd APCOM (Tucson, Arizona, 1992) 97-105.
    • (1992) Proc. 23rd APCOM , pp. 97-105
    • Frimpong, S.1    Whiting, J.M.2
  • 7
    • 0023399309 scopus 로고
    • Optimization of open pit short- and long-range production scheduling
    • August
    • K. Fytas, C. Pelley and P. N. Calder, Optimization of open pit short-and long-range production scheduling, CIM Bull. (August 1987) 55-61.
    • (1987) CIM Bull. , pp. 55-61
    • Fytas, K.1    Pelley, C.2    Calder, P.N.3
  • 8
    • 0023399320 scopus 로고
    • An open pit production scheduler: Algorithm and implementation
    • August
    • M. E. Gershon, An open pit production scheduler: Algorithm and implementation, Mining Eng. (August 1987).
    • (1987) Mining Eng.
    • Gershon, M.E.1
  • 9
    • 0042087417 scopus 로고
    • VARSIM: Interactive sensitivity analysis and simulation using variance components
    • Vancouver, September
    • W. H. Griffin and R. W. Hamilton, VARSIM: Interactive sensitivity analysis and simulation using variance components, Proc. 2nd CAMI, Vancouver, September 1991, 607-618.
    • (1991) Proc. 2nd CAMI , pp. 607-618
    • Griffin, W.H.1    Hamilton, R.W.2
  • 10
    • 2142683394 scopus 로고
    • A real-time dispatching algorithm for maximizing open-pit mine production under processing and blending requirements
    • CIM, Montreal, October
    • R. F. Hauck, A real-time dispatching algorithm for maximizing open-pit mine production under processing and blending requirements, Proc. Sem. Scheduling Mining, CIM, Montreal, October 1973.
    • (1973) Proc. Sem. Scheduling Mining
    • Hauck, R.F.1
  • 12
    • 0018752396 scopus 로고
    • Selected aspects of production planning - Berkeley pit
    • eds. J. T. Crawford and W. A. Hustrulid, SME, Littleton, CO
    • D. Hendricks and A. Dahlstrand, Selected aspects of production planning - Berkeley pit, Open Pit Mine Planning and Design, eds. J. T. Crawford and W. A. Hustrulid, SME, Littleton, CO, 1979, 207-216.
    • (1979) Open Pit Mine Planning and Design , pp. 207-216
    • Hendricks, D.1    Dahlstrand, A.2
  • 14
    • 0018738631 scopus 로고
    • Production schedules
    • eds. J. T. Crawford and W. A. Hustrulid, SME of AIMMPE, New York
    • M. B. Kahle and F. J. Scheaffer, Production schedules, Open Pit Mine Planning and Design, eds. J. T. Crawford and W. A. Hustrulid, SME of AIMMPE, New York, 1979, 235-242.
    • (1979) Open Pit Mine Planning and Design , pp. 235-242
    • Kahle, M.B.1    Scheaffer, F.J.2
  • 17
    • 3042765803 scopus 로고
    • An improved computation procedure for risk analysis problems with unusual probability functions
    • Dallas, TX
    • R. A. Startzman and R. A. Wattenbarger, An improved computation procedure for risk analysis problems with unusual probability functions, Proc. SPE Hydrocarbon Econ. Evaluation Symp., Dallas, TX, 1985.
    • (1985) Proc. SPE Hydrocarbon Econ. Evaluation Symp.
    • Startzman, R.A.1    Wattenbarger, R.A.2
  • 20
    • 0017728728 scopus 로고
    • Optimizing the short-term production schedule for an openpit iron ore mining operation
    • Melbourne, Australia
    • F. Wilke and T. Reimer, Optimizing the short-term production schedule for an openpit iron ore mining operation, 15th APCOM, Melbourne, Australia, 1977, 425-433.
    • (1977) 15th APCOM , pp. 425-433
    • Wilke, F.1    Reimer, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.