-
1
-
-
27144557504
-
A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
-
Allahverdi A., and Al-Anzi F.S. A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Comp Oper Res 33 4 (2006) 1056-1080
-
(2006)
Comp Oper Res
, vol.33
, Issue.4
, pp. 1056-1080
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
2
-
-
0035350696
-
Swarm intelligence: a whole new way to think about business
-
Bonabeau E., and Meyer C. Swarm intelligence: a whole new way to think about business. Harvard Bus Rev (2001) 107-114
-
(2001)
Harvard Bus Rev
, pp. 107-114
-
-
Bonabeau, E.1
Meyer, C.2
-
4
-
-
0036493540
-
Particle swarm optimization-mass-spring system analogon
-
Brandstatter B., and Baumgartner U. Particle swarm optimization-mass-spring system analogon. IEEE Trans Magn 38 2 (2002) 997-1000
-
(2002)
IEEE Trans Magn
, vol.38
, Issue.2
, pp. 997-1000
-
-
Brandstatter, B.1
Baumgartner, U.2
-
5
-
-
0035416239
-
Applying the design structure matrix to system decomposition and integration problems: a review and new directions
-
Browning T.R. Applying the design structure matrix to system decomposition and integration problems: a review and new directions. IEEE Trans Eng Manage 48 3 (2001) 292-306
-
(2001)
IEEE Trans Eng Manage
, vol.48
, Issue.3
, pp. 292-306
-
-
Browning, T.R.1
-
7
-
-
0001036327
-
Nonlinear time/cost tradeoff models in project management
-
Deckro R.F., Hebert J.E., Verdini W.A., Grimsrud P.H., and Venkateshwar S. Nonlinear time/cost tradeoff models in project management. Comp Ind Eng 28 2 (1995) 219-229
-
(1995)
Comp Ind Eng
, vol.28
, Issue.2
, pp. 219-229
-
-
Deckro, R.F.1
Hebert, J.E.2
Verdini, W.A.3
Grimsrud, P.H.4
Venkateshwar, S.5
-
8
-
-
33646723677
-
Identifying a design management package to support concurrent design in building wafer FABs
-
Dzeng R.J. Identifying a design management package to support concurrent design in building wafer FABs. J Constr Eng Manage 132 6 (2006) 606-614
-
(2006)
J Constr Eng Manage
, vol.132
, Issue.6
, pp. 606-614
-
-
Dzeng, R.J.1
-
9
-
-
0029517385
-
-
Eberhart RC, Kennedy J. A new optimizer using particle swarm theory. In: Proceedings of the sixth international symposium on micro machine and human science, Nagoya, Japan; 1995. p. 39-43.
-
-
-
-
11
-
-
0015484051
-
Critical path problems with concave cost-time curves
-
Falk J., and Horowitz J.L. Critical path problems with concave cost-time curves. Manage Sci 19 (1972) 446-455
-
(1972)
Manage Sci
, vol.19
, pp. 446-455
-
-
Falk, J.1
Horowitz, J.L.2
-
12
-
-
0036921314
-
A modification to particle swarm optimization algorithm
-
Fan H. A modification to particle swarm optimization algorithm. Eng Comput 19 (2002) 970-989
-
(2002)
Eng Comput
, vol.19
, pp. 970-989
-
-
Fan, H.1
-
13
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C.W., Liu L.Y., and Burns S.A. Using genetic algorithms to solve construction time-cost trade-off problems. J Comput Civil Eng 11 3 (1997) 184-189
-
(1997)
J Comput Civil Eng
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.Y.2
Burns, S.A.3
-
14
-
-
0027222453
-
PERT and crashing revisited: mathematical generalizations
-
Foldes S., and Sourmis F. PERT and crashing revisited: mathematical generalizations. Eur J Oper Res 64 (1993) 286-294
-
(1993)
Eur J Oper Res
, vol.64
, pp. 286-294
-
-
Foldes, S.1
Sourmis, F.2
-
15
-
-
0000181338
-
A network flow computation for project cost curves
-
Fulkerson D.R. A network flow computation for project cost curves. Manage Sci 7 (1961) 127-178
-
(1961)
Manage Sci
, vol.7
, pp. 127-178
-
-
Fulkerson, D.R.1
-
17
-
-
0003921398
-
-
Prentice-Hall Inc., Englewood Cliffs (NJ)
-
Hendrickson C., and Au T. Project management for construction: fundamental concepts for owners, engineers, architects, and builders (1989), Prentice-Hall Inc., Englewood Cliffs (NJ)
-
(1989)
Project management for construction: fundamental concepts for owners, engineers, architects, and builders
-
-
Hendrickson, C.1
Au, T.2
-
18
-
-
34250621813
-
Project crashing with variations in reward and penalty functions: some mathematical programming formulations
-
Kanda A., and Singh N. Project crashing with variations in reward and penalty functions: some mathematical programming formulations. Eng Optimiz 13 4 (1988) 307-315
-
(1988)
Eng Optimiz
, vol.13
, Issue.4
, pp. 307-315
-
-
Kanda, A.1
Singh, N.2
-
19
-
-
0001620447
-
Critical path planning and scheduling: mathematical basis
-
Kelly J.E. Critical path planning and scheduling: mathematical basis. Oper Res 9 (1961) 296-320
-
(1961)
Oper Res
, vol.9
, pp. 296-320
-
-
Kelly, J.E.1
-
21
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu S.S., and Yang C.H. GA-based multicriteria optimal model for construction scheduling. J Constr Eng Manage 125 6 (1999) 420-427
-
(1999)
J Constr Eng Manage
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.S.1
Yang, C.H.2
-
22
-
-
0032638332
-
Using machine learning and GA to solve time-cost tradeoff problems
-
Li H., Cao J.N., and Love P.E.D. Using machine learning and GA to solve time-cost tradeoff problems. J Constr Eng Manage 125 5 (1999) 347-353
-
(1999)
J Constr Eng Manage
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.N.2
Love, P.E.D.3
-
23
-
-
5244262334
-
Improved genetic algorithms for time-cost optimization
-
Li H., and Love P.E.D. Improved genetic algorithms for time-cost optimization. J Constr Eng Manage 123 3 (1997) 233-237
-
(1997)
J Constr Eng Manage
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.E.D.2
-
24
-
-
22544445852
-
A particle swarm optimization algorithm for beam angle selection in intensity-modulated radiotherapy planning
-
Li Y., Yao D., Yao J., and Chen W. A particle swarm optimization algorithm for beam angle selection in intensity-modulated radiotherapy planning. Phys Med Biol 50 15 (2005) 3491-3514
-
(2005)
Phys Med Biol
, vol.50
, Issue.15
, pp. 3491-3514
-
-
Li, Y.1
Yao, D.2
Yao, J.3
Chen, W.4
-
25
-
-
0029470313
-
Construction time-cost trade-off analysis using LP/IP hybrid method
-
Liu L.Y., Burns S.A., and Feng C.W. Construction time-cost trade-off analysis using LP/IP hybrid method. J Constr Eng Manage 121 4 (1995) 446-454
-
(1995)
J Constr Eng Manage
, vol.121
, Issue.4
, pp. 446-454
-
-
Liu, L.Y.1
Burns, S.A.2
Feng, C.W.3
-
26
-
-
0003906653
-
-
Blitz Publishing Company, Wisconsin
-
Moder J.J., Phillips C.R., and Davis E.W. Project management with CPM, PERT and precedence diagramming. 3rd ed. (1995), Blitz Publishing Company, Wisconsin
-
(1995)
Project management with CPM, PERT and precedence diagramming. 3rd ed.
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.W.3
-
27
-
-
13944265628
-
Flexible model for time/cost tradeoff Problem
-
Moussourakis J., and Haksever C. Flexible model for time/cost tradeoff Problem. J Constr Eng Manage 130 3 (2004) 307-314
-
(2004)
J Constr Eng Manage
, vol.130
, Issue.3
, pp. 307-314
-
-
Moussourakis, J.1
Haksever, C.2
-
28
-
-
84879015433
-
-
Shi Y, Eberhart RC. Parameter selection in particle swarm optimization. In: Proceedings of the evolutionary programming VII; 1998. p. 591-600.
-
-
-
-
29
-
-
4744360697
-
Inversion of ocean observations using particle swarm optimization
-
Slade W.H., Ressom H.W., Musavi M.T., and Miller R.L. Inversion of ocean observations using particle swarm optimization. IEEE Trans Geosci Remote Sens 42 9 (2004) 1915-1923
-
(2004)
IEEE Trans Geosci Remote Sens
, vol.42
, Issue.9
, pp. 1915-1923
-
-
Slade, W.H.1
Ressom, H.W.2
Musavi, M.T.3
Miller, R.L.4
-
30
-
-
0032208139
-
Approximation algorithms for the discrete time-cost tradeoff problem
-
Skutella M. Approximation algorithms for the discrete time-cost tradeoff problem. Math Oper Res 23 4 (1998) 909-929
-
(1998)
Math Oper Res
, vol.23
, Issue.4
, pp. 909-929
-
-
Skutella, M.1
-
31
-
-
18544385344
-
Impact of budget uncertainty on project time-cost tradeoff
-
Yang I.T. Impact of budget uncertainty on project time-cost tradeoff. IEEE Trans Eng Manage 52 2 (2005) 167-174
-
(2005)
IEEE Trans Eng Manage
, vol.52
, Issue.2
, pp. 167-174
-
-
Yang, I.T.1
-
32
-
-
24944537152
-
Chance-constrained time-cost tradeoff analysis considering funding variability
-
Yang I.T. Chance-constrained time-cost tradeoff analysis considering funding variability. J Const Eng Manage 130 9 (2005) 1002-1012
-
(2005)
J Const Eng Manage
, vol.130
, Issue.9
, pp. 1002-1012
-
-
Yang, I.T.1
-
33
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for time-cost optimization
-
Zheng D.X.M., Ng S.T., and Kumaraswamy M.M. Applying a genetic algorithm-based multiobjective approach for time-cost optimization. J Constr Eng Manage 130 2 (2004) 168-176
-
(2004)
J Constr Eng Manage
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
|