메뉴 건너뛰기




Volumn 42, Issue 2, 2000, Pages 203-220

Evaluation and comparison of production schedules

Author keywords

[No Author keywords available]

Indexed keywords

FACTORY AUTOMATION; SCHEDULING;

EID: 0033728696     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0166-3615(99)00071-8     Document Type: Article
Times cited : (53)

References (66)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job-shop scheduling
    • Adams J., Balas E., Zawack D. The shifting bottleneck procedure for job-shop scheduling. Management Science. 34:1988;391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 3
    • 0019058590 scopus 로고
    • Single machine scheduling to minimize weighted sum of completion times with secondary criterion - A branch and bound approach
    • Bansal S.P. Single machine scheduling to minimize weighted sum of completion times with secondary criterion - a branch and bound approach. European Journal of Operational Research. 5:1980;177-181.
    • (1980) European Journal of Operational Research , vol.5 , pp. 177-181
    • Bansal, S.P.1
  • 5
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean J.C., Birge J.R., Mittenthal J., Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research. 39:1991;470-483.
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 7
    • 0006841666 scopus 로고
    • A note on the single-machine scheduling problem with minimum weighted completion time and minimum allowable tardiness
    • Chand S., Schneeberger H. A note on the single-machine scheduling problem with minimum weighted completion time and minimum allowable tardiness. Naval Research Logistics Quarterly. 33:1986;551-557.
    • (1986) Naval Research Logistics Quarterly , vol.33 , pp. 551-557
    • Chand, S.1    Schneeberger, H.2
  • 8
    • 0023977809 scopus 로고
    • Single machine scheduling to minimize weighted earliness subject to no tardy jobs
    • Chand S., Schneeberger H. Single machine scheduling to minimize weighted earliness subject to no tardy jobs. European Journal of Operational Research. 34:1988;221-230.
    • (1988) European Journal of Operational Research , vol.34 , pp. 221-230
    • Chand, S.1    Schneeberger, H.2
  • 10
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng T.C.E., Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research. 38:1989;156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 13
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels R.L., Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science. 41:1995;363-376.
    • (1995) Management Science , vol.41 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 14
    • 0004960027 scopus 로고
    • Procedures for estimating optimal solution values for large combinatorial problems
    • Dannenbring D.G. Procedures for estimating optimal solution values for large combinatorial problems. Management Science. 23:1977;1273-1283.
    • (1977) Management Science , vol.23 , pp. 1273-1283
    • Dannenbring, D.G.1
  • 16
    • 0002218558 scopus 로고
    • Bicriterion static scheduling research for a single machine
    • Dileepan P., Sen T. Bicriterion static scheduling research for a single machine. OMEGA. 16:1988;53-59.
    • (1988) OMEGA , vol.16 , pp. 53-59
    • Dileepan, P.1    Sen, T.2
  • 19
    • 0011596389 scopus 로고
    • Use of nonfinancial performance measures
    • Spring
    • Fisher J. Use of nonfinancial performance measures. Journal of Cost Management. 1992;31-38. Spring.
    • (1992) Journal of Cost Management , pp. 31-38
    • Fisher, J.1
  • 20
    • 84982522109 scopus 로고
    • ISIS: A knowledge-based system for factory scheduling
    • Fox M.S., Smith S.F. ISIS: a knowledge-based system for factory scheduling. Expert Systems. 1:1984;25-49.
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 21
    • 0003343138 scopus 로고
    • Assessing the quality of production schedules
    • W. Scherer, & D. Brown. Kluwer Academic Publishing
    • Gary K., Kempf K., Smith S., Uzsoy R. Assessing the quality of production schedules. Scherer W., Brown D. Intelligent scheduling systems. 1995;129-154 Kluwer Academic Publishing.
    • (1995) Intelligent Scheduling Systems , pp. 129-154
    • Gary, K.1    Kempf, K.2    Smith, S.3    Uzsoy, R.4
  • 23
    • 0018444748 scopus 로고
    • Interval estimation of a global optimum for large combinatorial problems
    • Golden B.L., Alt F.B. Interval estimation of a global optimum for large combinatorial problems. Naval Research Logistics Quarterly. 26:1979;69-77.
    • (1979) Naval Research Logistics Quarterly , vol.26 , pp. 69-77
    • Golden, B.L.1    Alt, F.B.2
  • 26
    • 0025004840 scopus 로고
    • ReDS: A dynamic planning, scheduling and control system for manufacturing
    • Hadavi K., Shahraray M.S., Voigt K. ReDS: a dynamic planning, scheduling and control system for manufacturing. Journal of Manufacturing Systems. 9:1989;332-344.
    • (1989) Journal of Manufacturing Systems , vol.9 , pp. 332-344
    • Hadavi, K.1    Shahraray, M.S.2    Voigt, K.3
  • 27
    • 0003304668 scopus 로고
    • Measuring delivery performance: A case study from the semiconductor industry
    • R.S. Kaplan. Harvard Business School Press
    • Harrison J.M., Holloway C.A., Patell J.M. Measuring delivery performance: a case study from the semiconductor industry. Kaplan R.S. Measures for manufacturing excellence. 1990;Harvard Business School Press.
    • (1990) Measures for Manufacturing Excellence
    • Harrison, J.M.1    Holloway, C.A.2    Patell, J.M.3
  • 29
    • 0001157019 scopus 로고
    • Needed: An empirical science of algorithms
    • Hooker J. Needed: an empirical science of algorithms. Operations Research. 42:1994;201-212.
    • (1994) Operations Research , vol.42 , pp. 201-212
    • Hooker, J.1
  • 30
    • 0029362452 scopus 로고
    • Testing Heuristics: We have it all wrong
    • Hooker J. Testing Heuristics: we have it all wrong. Journal of Heuristics. 1:1995;33-42.
    • (1995) Journal of Heuristics , vol.1 , pp. 33-42
    • Hooker, J.1
  • 31
    • 0015681904 scopus 로고
    • An economic evaluation of job shop dispatching rules
    • Jones C.H. An economic evaluation of job shop dispatching rules. Management Science. 20:1973;293-307.
    • (1973) Management Science , vol.20 , pp. 293-307
    • Jones, C.H.1
  • 32
    • 0342794007 scopus 로고
    • Intelligently scheduling semiconductor wafer fabrication
    • M. Zweben, & M. Fox. Morgan Kaufman
    • Kempf K.G. Intelligently scheduling semiconductor wafer fabrication. Zweben M., Fox M. Knowledge-based scheduling. 1994;Morgan Kaufman.
    • (1994) Knowledge-based Scheduling
    • Kempf, K.G.1
  • 34
    • 0025802324 scopus 로고
    • Artificially intelligent schedulers in manufacturing practice
    • Kempf K., Russell B., Sidhu S., Barrett S. Artificially intelligent schedulers in manufacturing practice. AI Magazine. 11(5):1991;46-56.
    • (1991) AI Magazine , vol.11 , Issue.5 , pp. 46-56
    • Kempf, K.1    Russell, B.2    Sidhu, S.3    Barrett, S.4
  • 36
    • 0345901561 scopus 로고
    • Sequencing and scheduling: Algorithms and complexity
    • Graves S.C., Rinnooy Kan A.H.G., Zipkin P. Handbooks in operations research and management science. North-Holland
    • Lawler E.L., Lenstra J.K., Rinnooy Kan A.H.G., Shmoys D.B. Sequencing and scheduling: algorithms and complexity. Graves S.C., Rinnooy Kan A.H.G., Zipkin P. Handbooks in operations research and management science. Logistics of production and inventory. Vol. 4:1993;North-Holland.
    • (1993) Logistics of Production and Inventory , vol.4
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3    Shmoys, D.B.4
  • 38
    • 84950937653 scopus 로고
    • Integrated shop-floor control using autonomous agents
    • Lin G.Y.J., Solberg J.J. Integrated shop-floor control using autonomous agents. IIE Transactions. 24:1992;57-71.
    • (1992) IIE Transactions , vol.24 , pp. 57-71
    • Lin, G.Y.J.1    Solberg, J.J.2
  • 39
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay K.N., Safayeni F.R., Buzacott J.A. Job-shop scheduling theory: what is relevant? Interfaces. 18:1988;84-90.
    • (1988) Interfaces , vol.18 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 41
    • 85031557390 scopus 로고    scopus 로고
    • Research Report. Memorial University of Newfoundland, St. Johns, Newfoundland, Canada
    • McKay K.N., Morton T.E., Ramnath P. Aversion dynamics, Research Report. Memorial University of Newfoundland, St. Johns, Newfoundland, Canada, 1996.
    • (1996) Aversion Dynamics
    • McKay, K.N.1    Morton, T.E.2    Ramnath, P.3
  • 46
    • 0343228535 scopus 로고
    • Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing
    • Society of Manufacturing Engineers
    • Najmi A., Lozinski C. Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. Proceedings of the Autofact Conference. 1989;3.1-3.14 Society of Manufacturing Engineers.
    • (1989) Proceedings of the Autofact Conference , pp. 31-314
    • Najmi, A.1    Lozinski, C.2
  • 47
    • 0022698428 scopus 로고
    • Scheduling with multiple performance measures: The one-machine case
    • Nelson R.T., Sarin R.K., Daniels R.L. Scheduling with multiple performance measures: the one-machine case. Management Science. 32:1986;464-479.
    • (1986) Management Science , vol.32 , pp. 464-479
    • Nelson, R.T.1    Sarin, R.K.2    Daniels, R.L.3
  • 48
    • 0001443508 scopus 로고
    • A shifting bottleneck algorithm for scheduling semiconductor testing operations
    • Ovacik I.M., Uzsoy R. A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing. 2:1992;119-134.
    • (1992) Journal of Electronics Manufacturing , vol.2 , pp. 119-134
    • Ovacik, I.M.1    Uzsoy, R.2
  • 51
    • 0020735486 scopus 로고
    • An algorithm for single-machine sequencing with deadlines to minimize total weighted completion time
    • Potts C.N., Van Wassenhove L.N. An algorithm for single-machine sequencing with deadlines to minimize total weighted completion time. European Journal of Operational Research. 12:1983;379-387.
    • (1983) European Journal of Operational Research , vol.12 , pp. 379-387
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 52
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts C.N., Van Wassenhove L.N. Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society. 43:1992;395-406.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 53
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job shop environment
    • Ragatz G.L., Mabert V.A. An evaluation of order release mechanisms in a job shop environment. Decision Sciences. 19:1988;167-189.
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 55
    • 0343664169 scopus 로고
    • Use of the net present value criterion in a random job shop where early shipments are forbidden
    • Scudder G.D., Smith-Daniels D.E., Rohleder T. Use of the net present value criterion in a random job shop where early shipments are forbidden. Journal of Operations Management. 9:1990;526-547.
    • (1990) Journal of Operations Management , vol.9 , pp. 526-547
    • Scudder, G.D.1    Smith-Daniels, D.E.2    Rohleder, T.3
  • 56
    • 0020717649 scopus 로고
    • A branch and bound procedure to solve a bicriterion scheduling problem
    • Sen T., Gupta S.K. A branch and bound procedure to solve a bicriterion scheduling problem. IIE Transactions. 15:1983;84-88.
    • (1983) IIE Transactions , vol.15 , pp. 84-88
    • Sen, T.1    Gupta, S.K.2
  • 57
    • 0001360524 scopus 로고
    • A branch and bound approach to the bicriterion scheduling problem involving total flow time and range of lateness
    • Sen T., Raiszadeh F.M.E., Dileepan P. A branch and bound approach to the bicriterion scheduling problem involving total flow time and range of lateness. Management Science. 34:1988;254-260.
    • (1988) Management Science , vol.34 , pp. 254-260
    • Sen, T.1    Raiszadeh, F.M.E.2    Dileepan, P.3
  • 58
    • 85031569132 scopus 로고
    • Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213
    • Smith SF. Knowledge-based production management: approaches, results and prospects. Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213, 1991.
    • (1991) Knowledge-based Production Management: Approaches, Results and Prospects
    • Smith, S.F.1
  • 60
    • 0342794004 scopus 로고
    • Exploiting local flexibility during execution of pre-computed schedules
    • A. Famili, D.S. Nau, & S.H. Kim. AAAI Press/MIT Press
    • Smith S.F., Keng N., Kempf K. Exploiting local flexibility during execution of pre-computed schedules. Famili A., Nau D.S., Kim S.H. Artificial intelligence applications in manufacturing. 1992;AAAI Press/MIT Press.
    • (1992) Artificial Intelligence Applications in Manufacturing
    • Smith, S.F.1    Keng, N.2    Kempf, K.3
  • 61
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • Smith W.E. Various optimizers for single-stage production. Naval Research Logistics Quarterly. 3:1956;59-66.
    • (1956) Naval Research Logistics Quarterly , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 62
    • 0002350057 scopus 로고
    • IBM burlington's logistics management system
    • Sullivan G., Fordyce K. IBM burlington's logistics management system. Interfaces. 20(1):1990;43-64.
    • (1990) Interfaces , vol.20 , Issue.1 , pp. 43-64
    • Sullivan, G.1    Fordyce, K.2
  • 64
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein L.M. Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science. 37(7):1991;834-850.
    • (1991) Management Science , vol.37 , Issue.7 , pp. 834-850
    • Wein, L.M.1
  • 65
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein L.M., Chevalier P.B. A broader view of the job-shop scheduling problem. Management Science. 38:1992;1018-1033.
    • (1992) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 66
    • 0027224847 scopus 로고
    • One machine rescheduling heuristics with efficiency and stability as criteria
    • Wu S.D., Storer R.H., Chang P.C. One machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research. 20:1993;1-14.
    • (1993) Computers and Operations Research , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.