-
1
-
-
0023977010
-
The shifting bottleneck procedure for job-shop scheduling
-
Adams J., Balas E., Zawack D. The shifting bottleneck procedure for job-shop scheduling. Management Science. 34:1988;391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0019058590
-
Single machine scheduling to minimize weighted sum of completion times with secondary criterion - A branch and bound approach
-
Bansal S.P. Single machine scheduling to minimize weighted sum of completion times with secondary criterion - a branch and bound approach. European Journal of Operational Research. 5:1980;177-181.
-
(1980)
European Journal of Operational Research
, vol.5
, pp. 177-181
-
-
Bansal, S.P.1
-
4
-
-
0029362492
-
Designing and reporting on computational experiments with Heuristic methods
-
Barr R.S., Golden B.L., Kelly J.P., Resende M.G.C., Stewart W.R. Designing and reporting on computational experiments with Heuristic methods. Journal of Heuristics. 1:1995;9-32.
-
(1995)
Journal of Heuristics
, vol.1
, pp. 9-32
-
-
Barr, R.S.1
Golden, B.L.2
Kelly, J.P.3
Resende, M.G.C.4
Stewart, W.R.5
-
5
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
Bean J.C., Birge J.R., Mittenthal J., Noon C.E. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research. 39:1991;470-483.
-
(1991)
Operations Research
, vol.39
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
7
-
-
0006841666
-
A note on the single-machine scheduling problem with minimum weighted completion time and minimum allowable tardiness
-
Chand S., Schneeberger H. A note on the single-machine scheduling problem with minimum weighted completion time and minimum allowable tardiness. Naval Research Logistics Quarterly. 33:1986;551-557.
-
(1986)
Naval Research Logistics Quarterly
, vol.33
, pp. 551-557
-
-
Chand, S.1
Schneeberger, H.2
-
8
-
-
0023977809
-
Single machine scheduling to minimize weighted earliness subject to no tardy jobs
-
Chand S., Schneeberger H. Single machine scheduling to minimize weighted earliness subject to no tardy jobs. European Journal of Operational Research. 34:1988;221-230.
-
(1988)
European Journal of Operational Research
, vol.34
, pp. 221-230
-
-
Chand, S.1
Schneeberger, H.2
-
10
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng T.C.E., Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research. 38:1989;156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
13
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels R.L., Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science. 41:1995;363-376.
-
(1995)
Management Science
, vol.41
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
14
-
-
0004960027
-
Procedures for estimating optimal solution values for large combinatorial problems
-
Dannenbring D.G. Procedures for estimating optimal solution values for large combinatorial problems. Management Science. 23:1977;1273-1283.
-
(1977)
Management Science
, vol.23
, pp. 1273-1283
-
-
Dannenbring, D.G.1
-
16
-
-
0002218558
-
Bicriterion static scheduling research for a single machine
-
Dileepan P., Sen T. Bicriterion static scheduling research for a single machine. OMEGA. 16:1988;53-59.
-
(1988)
OMEGA
, vol.16
, pp. 53-59
-
-
Dileepan, P.1
Sen, T.2
-
19
-
-
0011596389
-
Use of nonfinancial performance measures
-
Spring
-
Fisher J. Use of nonfinancial performance measures. Journal of Cost Management. 1992;31-38. Spring.
-
(1992)
Journal of Cost Management
, pp. 31-38
-
-
Fisher, J.1
-
20
-
-
84982522109
-
ISIS: A knowledge-based system for factory scheduling
-
Fox M.S., Smith S.F. ISIS: a knowledge-based system for factory scheduling. Expert Systems. 1:1984;25-49.
-
(1984)
Expert Systems
, vol.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
21
-
-
0003343138
-
Assessing the quality of production schedules
-
W. Scherer, & D. Brown. Kluwer Academic Publishing
-
Gary K., Kempf K., Smith S., Uzsoy R. Assessing the quality of production schedules. Scherer W., Brown D. Intelligent scheduling systems. 1995;129-154 Kluwer Academic Publishing.
-
(1995)
Intelligent Scheduling Systems
, pp. 129-154
-
-
Gary, K.1
Kempf, K.2
Smith, S.3
Uzsoy, R.4
-
23
-
-
0018444748
-
Interval estimation of a global optimum for large combinatorial problems
-
Golden B.L., Alt F.B. Interval estimation of a global optimum for large combinatorial problems. Naval Research Logistics Quarterly. 26:1979;69-77.
-
(1979)
Naval Research Logistics Quarterly
, vol.26
, pp. 69-77
-
-
Golden, B.L.1
Alt, F.B.2
-
26
-
-
0025004840
-
ReDS: A dynamic planning, scheduling and control system for manufacturing
-
Hadavi K., Shahraray M.S., Voigt K. ReDS: a dynamic planning, scheduling and control system for manufacturing. Journal of Manufacturing Systems. 9:1989;332-344.
-
(1989)
Journal of Manufacturing Systems
, vol.9
, pp. 332-344
-
-
Hadavi, K.1
Shahraray, M.S.2
Voigt, K.3
-
27
-
-
0003304668
-
Measuring delivery performance: A case study from the semiconductor industry
-
R.S. Kaplan. Harvard Business School Press
-
Harrison J.M., Holloway C.A., Patell J.M. Measuring delivery performance: a case study from the semiconductor industry. Kaplan R.S. Measures for manufacturing excellence. 1990;Harvard Business School Press.
-
(1990)
Measures for Manufacturing Excellence
-
-
Harrison, J.M.1
Holloway, C.A.2
Patell, J.M.3
-
29
-
-
0001157019
-
Needed: An empirical science of algorithms
-
Hooker J. Needed: an empirical science of algorithms. Operations Research. 42:1994;201-212.
-
(1994)
Operations Research
, vol.42
, pp. 201-212
-
-
Hooker, J.1
-
30
-
-
0029362452
-
Testing Heuristics: We have it all wrong
-
Hooker J. Testing Heuristics: we have it all wrong. Journal of Heuristics. 1:1995;33-42.
-
(1995)
Journal of Heuristics
, vol.1
, pp. 33-42
-
-
Hooker, J.1
-
31
-
-
0015681904
-
An economic evaluation of job shop dispatching rules
-
Jones C.H. An economic evaluation of job shop dispatching rules. Management Science. 20:1973;293-307.
-
(1973)
Management Science
, vol.20
, pp. 293-307
-
-
Jones, C.H.1
-
32
-
-
0342794007
-
Intelligently scheduling semiconductor wafer fabrication
-
M. Zweben, & M. Fox. Morgan Kaufman
-
Kempf K.G. Intelligently scheduling semiconductor wafer fabrication. Zweben M., Fox M. Knowledge-based scheduling. 1994;Morgan Kaufman.
-
(1994)
Knowledge-based Scheduling
-
-
Kempf, K.G.1
-
34
-
-
0025802324
-
Artificially intelligent schedulers in manufacturing practice
-
Kempf K., Russell B., Sidhu S., Barrett S. Artificially intelligent schedulers in manufacturing practice. AI Magazine. 11(5):1991;46-56.
-
(1991)
AI Magazine
, vol.11
, Issue.5
, pp. 46-56
-
-
Kempf, K.1
Russell, B.2
Sidhu, S.3
Barrett, S.4
-
36
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
Graves S.C., Rinnooy Kan A.H.G., Zipkin P. Handbooks in operations research and management science. North-Holland
-
Lawler E.L., Lenstra J.K., Rinnooy Kan A.H.G., Shmoys D.B. Sequencing and scheduling: algorithms and complexity. Graves S.C., Rinnooy Kan A.H.G., Zipkin P. Handbooks in operations research and management science. Logistics of production and inventory. Vol. 4:1993;North-Holland.
-
(1993)
Logistics of Production and Inventory
, vol.4
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
38
-
-
84950937653
-
Integrated shop-floor control using autonomous agents
-
Lin G.Y.J., Solberg J.J. Integrated shop-floor control using autonomous agents. IIE Transactions. 24:1992;57-71.
-
(1992)
IIE Transactions
, vol.24
, pp. 57-71
-
-
Lin, G.Y.J.1
Solberg, J.J.2
-
41
-
-
85031557390
-
-
Research Report. Memorial University of Newfoundland, St. Johns, Newfoundland, Canada
-
McKay K.N., Morton T.E., Ramnath P. Aversion dynamics, Research Report. Memorial University of Newfoundland, St. Johns, Newfoundland, Canada, 1996.
-
(1996)
Aversion Dynamics
-
-
McKay, K.N.1
Morton, T.E.2
Ramnath, P.3
-
46
-
-
0343228535
-
Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing
-
Society of Manufacturing Engineers
-
Najmi A., Lozinski C. Managing factory productivity using object-oriented simulation for setting shift production targets in VLSI manufacturing. Proceedings of the Autofact Conference. 1989;3.1-3.14 Society of Manufacturing Engineers.
-
(1989)
Proceedings of the Autofact Conference
, pp. 31-314
-
-
Najmi, A.1
Lozinski, C.2
-
47
-
-
0022698428
-
Scheduling with multiple performance measures: The one-machine case
-
Nelson R.T., Sarin R.K., Daniels R.L. Scheduling with multiple performance measures: the one-machine case. Management Science. 32:1986;464-479.
-
(1986)
Management Science
, vol.32
, pp. 464-479
-
-
Nelson, R.T.1
Sarin, R.K.2
Daniels, R.L.3
-
48
-
-
0001443508
-
A shifting bottleneck algorithm for scheduling semiconductor testing operations
-
Ovacik I.M., Uzsoy R. A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing. 2:1992;119-134.
-
(1992)
Journal of Electronics Manufacturing
, vol.2
, pp. 119-134
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
51
-
-
0020735486
-
An algorithm for single-machine sequencing with deadlines to minimize total weighted completion time
-
Potts C.N., Van Wassenhove L.N. An algorithm for single-machine sequencing with deadlines to minimize total weighted completion time. European Journal of Operational Research. 12:1983;379-387.
-
(1983)
European Journal of Operational Research
, vol.12
, pp. 379-387
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
52
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
Potts C.N., Van Wassenhove L.N. Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society. 43:1992;395-406.
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
53
-
-
84985757538
-
An evaluation of order release mechanisms in a job shop environment
-
Ragatz G.L., Mabert V.A. An evaluation of order release mechanisms in a job shop environment. Decision Sciences. 19:1988;167-189.
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
55
-
-
0343664169
-
Use of the net present value criterion in a random job shop where early shipments are forbidden
-
Scudder G.D., Smith-Daniels D.E., Rohleder T. Use of the net present value criterion in a random job shop where early shipments are forbidden. Journal of Operations Management. 9:1990;526-547.
-
(1990)
Journal of Operations Management
, vol.9
, pp. 526-547
-
-
Scudder, G.D.1
Smith-Daniels, D.E.2
Rohleder, T.3
-
56
-
-
0020717649
-
A branch and bound procedure to solve a bicriterion scheduling problem
-
Sen T., Gupta S.K. A branch and bound procedure to solve a bicriterion scheduling problem. IIE Transactions. 15:1983;84-88.
-
(1983)
IIE Transactions
, vol.15
, pp. 84-88
-
-
Sen, T.1
Gupta, S.K.2
-
57
-
-
0001360524
-
A branch and bound approach to the bicriterion scheduling problem involving total flow time and range of lateness
-
Sen T., Raiszadeh F.M.E., Dileepan P. A branch and bound approach to the bicriterion scheduling problem involving total flow time and range of lateness. Management Science. 34:1988;254-260.
-
(1988)
Management Science
, vol.34
, pp. 254-260
-
-
Sen, T.1
Raiszadeh, F.M.E.2
Dileepan, P.3
-
58
-
-
85031569132
-
-
Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213
-
Smith SF. Knowledge-based production management: approaches, results and prospects. Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie-Mellon University, Pittsburgh, PA 15213, 1991.
-
(1991)
Knowledge-based Production Management: Approaches, Results and Prospects
-
-
Smith, S.F.1
-
60
-
-
0342794004
-
Exploiting local flexibility during execution of pre-computed schedules
-
A. Famili, D.S. Nau, & S.H. Kim. AAAI Press/MIT Press
-
Smith S.F., Keng N., Kempf K. Exploiting local flexibility during execution of pre-computed schedules. Famili A., Nau D.S., Kim S.H. Artificial intelligence applications in manufacturing. 1992;AAAI Press/MIT Press.
-
(1992)
Artificial Intelligence Applications in Manufacturing
-
-
Smith, S.F.1
Keng, N.2
Kempf, K.3
-
61
-
-
0002066821
-
Various optimizers for single-stage production
-
Smith W.E. Various optimizers for single-stage production. Naval Research Logistics Quarterly. 3:1956;59-66.
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
62
-
-
0002350057
-
IBM burlington's logistics management system
-
Sullivan G., Fordyce K. IBM burlington's logistics management system. Interfaces. 20(1):1990;43-64.
-
(1990)
Interfaces
, vol.20
, Issue.1
, pp. 43-64
-
-
Sullivan, G.1
Fordyce, K.2
-
64
-
-
0001200692
-
Due-date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein L.M. Due-date setting and priority sequencing in a multiclass M/G/1 queue. Management Science. 37(7):1991;834-850.
-
(1991)
Management Science
, vol.37
, Issue.7
, pp. 834-850
-
-
Wein, L.M.1
-
65
-
-
0026884810
-
A broader view of the job-shop scheduling problem
-
Wein L.M., Chevalier P.B. A broader view of the job-shop scheduling problem. Management Science. 38:1992;1018-1033.
-
(1992)
Management Science
, vol.38
, pp. 1018-1033
-
-
Wein, L.M.1
Chevalier, P.B.2
-
66
-
-
0027224847
-
One machine rescheduling heuristics with efficiency and stability as criteria
-
Wu S.D., Storer R.H., Chang P.C. One machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research. 20:1993;1-14.
-
(1993)
Computers and Operations Research
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
|