메뉴 건너뛰기




Volumn 41, Issue 2, 2007, Pages 147-162

Feedback fuzzy-DVS scheduling of control tasks

Author keywords

Control task; Dynamic voltage scaling; Feedback control; Fuzzy rule; Scheduling

Indexed keywords

COMPUTER RESOURCE MANAGEMENT; COMPUTER SIMULATION; ELECTRIC POWER UTILIZATION; FEEDBACK CONTROL; FUZZY RULES; PROBLEM SOLVING; SCHEDULING ALGORITHMS;

EID: 34250761284     PISSN: 09208542     EISSN: 15730484     Source Type: Journal    
DOI: 10.1007/s11227-006-0027-y     Document Type: Article
Times cited : (9)

References (26)
  • 2
    • 22844455249 scopus 로고    scopus 로고
    • A methodology and algorithms for the design of hard real-time multi-tasking ASICs
    • Potkonjak M, Wolf W (1999) A methodology and algorithms for the design of hard real-time multi-tasking ASICs. ACM Trans Design Autom Electron Syst 4(8):430-459
    • (1999) ACM Trans Design Autom Electron Syst , vol.4 , Issue.8 , pp. 430-459
    • Potkonjak, M.1    Wolf, W.2
  • 4
    • 0031703904 scopus 로고    scopus 로고
    • Toward automatic synthesis of schedulable real-time controllers
    • Ryu M, Hong S (1998) Toward automatic synthesis of schedulable real-time controllers. Integr Comput-Aided Eng 5(7):261-277
    • (1998) Integr Comput-Aided Eng , vol.5 , Issue.7 , pp. 261-277
    • Ryu, M.1    Hong, S.2
  • 5
    • 0242637131 scopus 로고    scopus 로고
    • Dynamical scheduling of digital control systems
    • man and cybernetics, Washington, DC, October
    • Lin Q, Chen PCY, Neow PA (2003) Dynamical scheduling of digital control systems. In: Proc of IEEE int'l conf on systems, man and cybernetics, vol 5, Washington, DC, October 2003, pp 4098-4103
    • (2003) Proc of IEEE int'l conf on systems , vol.5 , pp. 4098-4103
    • Lin, Q.1    Chen, P.C.Y.2    Neow, P.A.3
  • 6
    • 26944442366 scopus 로고    scopus 로고
    • Scheduling design of controllers with fuzzy deadline
    • Fuzzy systems and knowledge discovery, Springer
    • Jin H, Wang HA, Wang H, Wang DL (2005) Scheduling design of controllers with fuzzy deadline. In: Fuzzy systems and knowledge discovery, vol 3613. Lecture notes in artificial intelligence. Springer, 2005, pp. 861-864
    • (2005) Lecture notes in artificial intelligence , vol.3613 , pp. 861-864
    • Jin, H.1    Wang, H.A.2    Wang, H.3    Wang, D.L.4
  • 8
    • 0037701352 scopus 로고    scopus 로고
    • How does control timing affect performance? analysis and simulation of timing using jitterbug and TrueTime
    • Cervin A, Henriksson D, Lincoln B, Eker J, Arzen KE (2003) How does control timing affect performance? analysis and simulation of timing using jitterbug and TrueTime. IEEE Contr Syst Mag 23(7): 16-30
    • (2003) IEEE Contr Syst Mag , vol.23 , Issue.7 , pp. 16-30
    • Cervin, A.1    Henriksson, D.2    Lincoln, B.3    Eker, J.4    Arzen, K.E.5
  • 9
    • 0344794029 scopus 로고    scopus 로고
    • PhD dissertation, Dept of Automatic Control, Lund Institute of Technology, Lund, Sweden, April
    • Cervin A (2003) Integrated control and real-time scheduling, PhD dissertation, Dept of Automatic Control, Lund Institute of Technology, Lund, Sweden, April 2003
    • (2003) Integrated control and real-time scheduling
    • Cervin, A.1
  • 10
    • 34250730983 scopus 로고    scopus 로고
    • Dumbeck RF (1986) Computer controlled air conditioning systems, United States Patent 4,567,939. http://www.freepatentsonline.com/4567939.html
    • Dumbeck RF (1986) Computer controlled air conditioning systems, United States Patent 4,567,939. http://www.freepatentsonline.com/4567939.html
  • 14
    • 0043237598 scopus 로고    scopus 로고
    • Scheduling with dynamic voltage/speed adjustment using slack reclamation in multiprocessor real-time systems
    • Zhu D, Melhem R, Childers BR (2003) Scheduling with dynamic voltage/speed adjustment using slack reclamation in multiprocessor real-time systems. IEEE Trans Parallel Distrib Syst 14(11): 686-700
    • (2003) IEEE Trans Parallel Distrib Syst , vol.14 , Issue.11 , pp. 686-700
    • Zhu, D.1    Melhem, R.2    Childers, B.R.3
  • 17
    • 0032311886 scopus 로고    scopus 로고
    • On-line scheduling of hard real-time tasks on variable-voltage processor
    • San Jose, California, November
    • Hong I, Potkonjak M, Srivastava MB (1998) On-line scheduling of hard real-time tasks on variable-voltage processor. In: Proc of IEEE/ACM Int'l conf on computer-aided design, San Jose, California, November 1998, pp 653-656
    • (1998) Proc of IEEE/ACM Int'l conf on computer-aided design , pp. 653-656
    • Hong, I.1    Potkonjak, M.2    Srivastava, M.B.3
  • 18
    • 0032688679 scopus 로고    scopus 로고
    • Power conscious fixed priority scheduling for hard real-time systems
    • New Orleans, Louisiana, June
    • Shin Y, Choi K (1999) Power conscious fixed priority scheduling for hard real-time systems. In: Proc of the 36th IEEE/ACM conf on design automation, New Orleans, Louisiana, June 1999, pp 134-139
    • (1999) Proc of the 36th IEEE/ACM conf on design automation , pp. 134-139
    • Shin, Y.1    Choi, K.2
  • 20
    • 0035280198 scopus 로고    scopus 로고
    • Software energy reduction techniques for variable-voltage processors
    • Okuma T, Yasuura H, Ishihara T (2001) Software energy reduction techniques for variable-voltage processors. IEEE Design Test Comput 18(6):31-41
    • (2001) IEEE Design Test Comput , vol.18 , Issue.6 , pp. 31-41
    • Okuma, T.1    Yasuura, H.2    Ishihara, T.3
  • 21
    • 3242656537 scopus 로고    scopus 로고
    • PACE: A new approach to dynamic voltage scaling
    • Lorch JR, Smith AJ (2004) PACE: a new approach to dynamic voltage scaling. IEEE Trans Comput 53(11):856-869
    • (2004) IEEE Trans Comput , vol.53 , Issue.11 , pp. 856-869
    • Lorch, J.R.1    Smith, A.J.2
  • 23
    • 4043079862 scopus 로고    scopus 로고
    • A fuzzy feedback control real-time scheduling algorithm
    • with English abstract
    • Jin H, Wang HA, Fu Y, Wang Q, Wang H (2004) A fuzzy feedback control real-time scheduling algorithm. Chinese J Soft 15(10):791-798 (with English abstract)
    • (2004) Chinese J Soft , vol.15 , Issue.10 , pp. 791-798
    • Jin, H.1    Wang, H.A.2    Fu, Y.3    Wang, Q.4    Wang, H.5
  • 24
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard-real-time environment
    • Liu L, Layland JW (1973) Scheduling algorithms for multiprogramming in a hard-real-time environment. J Assoc Comput Machin 20(5):46-61
    • (1973) J Assoc Comput Machin , vol.20 , Issue.5 , pp. 46-61
    • Liu, L.1    Layland, J.W.2
  • 25
    • 34250740592 scopus 로고    scopus 로고
    • Scheduling control tasks with threshold-based largest dedication first
    • Jin H, Wang HA, Wang H, Wang D (2005) Scheduling control tasks with threshold-based largest dedication first. Int J Inf Technol 11(5):61-70
    • (2005) Int J Inf Technol , vol.11 , Issue.5 , pp. 61-70
    • Jin, H.1    Wang, H.A.2    Wang, H.3    Wang, D.4
  • 26
    • 0036641752 scopus 로고    scopus 로고
    • Feedback control real-time scheduling: Framework, modeling, and algorithms
    • Lu C, Stankvoic JA, Tao G, Son SH (2002) Feedback control real-time scheduling: framework, modeling, and algorithms. J Real-Time Syst 23(1-2):85-126
    • (2002) J Real-Time Syst , vol.23 , Issue.1-2 , pp. 85-126
    • Lu, C.1    Stankvoic, J.A.2    Tao, G.3    Son, S.H.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.