-
1
-
-
0016544914
-
Analysis of activity networks under uncertainty
-
Ang, A. H.-S., Abdelnour, J., and Chaker, A. A. (1975). "Analysis of activity networks under uncertainty." J. Eng. Mech. Div., Am. Soc. Civ. Eng., 101(4), 373-387.
-
(1975)
J. Eng. Mech. Div., Am. Soc. Civ. Eng.
, vol.101
, Issue.4
, pp. 373-387
-
-
Ang, A.H.-S.1
Abdelnour, J.2
Chaker, A.A.3
-
2
-
-
0023421720
-
Political risks in international construction
-
Ashley, D. B., and Bonner, J. J. (1987). "Political risks in international construction." J. Constr. Eng. Manage., 113(3), 447-466.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.3
, pp. 447-466
-
-
Ashley, D.B.1
Bonner, J.J.2
-
3
-
-
13944253035
-
-
MS thesis, Technion, Israel Institute of Technology, Haifa, Israel
-
Benjo, M. (1999). "Risk estimation in construction projects." MS thesis, Technion, Israel Institute of Technology, Haifa, Israel.
-
(1999)
Risk Estimation in Construction Projects
-
-
Benjo, M.1
-
4
-
-
13944261350
-
Managing risk and contingency for works projects
-
London
-
Central Unit on Procurement (CUP). (1993). "Managing risk and contingency for works projects." Guidance Manual No. 41, London.
-
(1993)
Guidance Manual No. 41
-
-
-
5
-
-
0003919456
-
-
Wiley, New York
-
Cooper, D., and Chapman, C. (1987). Risk analysis for large projects: models, methods and cases, Wiley, New York.
-
(1987)
Risk Analysis for Large Projects: Models, Methods and Cases
-
-
Cooper, D.1
Chapman, C.2
-
6
-
-
0020825299
-
Probabilistic estimating: Mathematics and applications
-
Diekmann, J. E. (1983). "Probabilistic estimating: Mathematics and applications." J. Constr. Eng. Manage, 109(3), 297-308.
-
(1983)
J. Constr. Eng. Manage
, vol.109
, Issue.3
, pp. 297-308
-
-
Diekmann, J.E.1
-
7
-
-
0344992524
-
Risk and risk management in construction projects: Concepts, terms and risk categories re-defined
-
Edwards, P. J., and Bowen, P. A. (2000). "Risk and risk management in construction projects: Concepts, terms and risk categories re-defined." J. Constr. Procure., 5(1), 42-57.
-
(2000)
J. Constr. Procure.
, vol.5
, Issue.1
, pp. 42-57
-
-
Edwards, P.J.1
Bowen, P.A.2
-
9
-
-
0011543013
-
2 expressed in standard measure
-
2 expressed in standard measure." Biometrika, 50(3,4), 459-498.
-
(1963)
Biometrika
, vol.50
, Issue.3-4
, pp. 459-498
-
-
Johnson, N.L.1
Nixon, E.2
Amos, D.E.3
Pearson, E.S.4
-
10
-
-
0020748627
-
Three-point approximations for continuous random variables
-
Keefer, D. L., and Bodily, S. E. (1983). "Three-point approximations for continuous random variables." Manage. Sci., 29(5), 595-609.
-
(1983)
Manage. Sci.
, vol.29
, Issue.5
, pp. 595-609
-
-
Keefer, D.L.1
Bodily, S.E.2
-
11
-
-
0020161331
-
A four-moments alternative to simulation for a class of stochastic management models
-
Kottas, J. F., and Lau, H.-S. (1982). "A four-moments alternative to simulation for a class of stochastic management models." Manage. Sci., 28(7), 749-758.
-
(1982)
Manage. Sci.
, vol.28
, Issue.7
, pp. 749-758
-
-
Kottas, J.F.1
Lau, H.-S.2
-
12
-
-
0002641538
-
Analytic study of the PERT assumptions
-
MacCrimmon, K. R., and Ryavec, C. A. (1964). "Analytic study of the PERT assumptions." Oper. Res., 12, 16-37.
-
(1964)
Oper. Res.
, vol.12
, pp. 16-37
-
-
MacCrimmon, K.R.1
Ryavec, C.A.2
-
13
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
Malcolm, D. G., Roseboom, J. H., Clark, C. E., and Fazar, W. (1959). "Application of a technique for research and development program evaluation." Oper. Res., 7, 646-669.
-
(1959)
Oper. Res.
, vol.7
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
15
-
-
0039399786
-
Methods of analyzing risk exposure in the cost estimates of high quality offices
-
E&FN Spon, London
-
Newton, S. (1992). "Methods of analyzing risk exposure in the cost estimates of high quality offices." Construction management and economics, Vol. 10, E&FN Spon, London, 431-449.
-
(1992)
Construction Management and Economics
, vol.10
, pp. 431-449
-
-
Newton, S.1
-
16
-
-
0037983227
-
Contingency allocation and management for building projects
-
E&FN Spon, London
-
Ranisinghe, M. (1994). "Contingency allocation and management for building projects." Construction management and economics, Vol. 12, E&FN Spon, London, 233-243.
-
(1994)
Construction Management and Economics
, vol.12
, pp. 233-243
-
-
Ranisinghe, M.1
-
17
-
-
2142677806
-
Elicitation of subjective probabilities for economic risk analysis: An investigation
-
E&FN Spon, London
-
Ranisinghe, M., and Russell, A. D. (1993). "Elicitation of subjective probabilities for economic risk analysis: An investigation." Construction management and economics, Vol. 11, E&FN Spon, London, 326-340.
-
(1993)
Construction Management and Economics
, vol.11
, pp. 326-340
-
-
Ranisinghe, M.1
Russell, A.D.2
-
18
-
-
0013337442
-
A proposal for construction project risk assessment using fuzzy logic
-
Taylor and Francis Ltd., London
-
Tan, J. H. M., and Carr, V. (2000). "A proposal for construction project risk assessment using fuzzy logic." Construction management and economics, Vol. 18, Taylor and Francis Ltd., London, 491-500.
-
(2000)
Construction Management and Economics
, vol.18
, pp. 491-500
-
-
Tan, J.H.M.1
Carr, V.2
-
19
-
-
0027560002
-
Probabilistic cost estimating with subjective correlations
-
Touran, A. (1993). "Probabilistic cost estimating with subjective correlations." J. Constr. Eng. Manage., 119(1), 58-71.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.1
, pp. 58-71
-
-
Touran, A.1
-
20
-
-
0033902903
-
A new approach to calculating project cost variance
-
Wang, C.-H., and Huang, Y.-C. (2000). "A new approach to calculating project cost variance." Int. J. Proj. Manage., 18, 131-138.
-
(2000)
Int. J. Proj. Manage.
, vol.18
, pp. 131-138
-
-
Wang, C.-H.1
Huang, Y.-C.2
-
21
-
-
0008563034
-
NPV-at-risk method in infrastructure project investment evaluation
-
Ye, S., and Tiong, R. L. K. (2000). "NPV-at-risk method in infrastructure project investment evaluation." J. Constr. Eng. Manage., 126(3), 227-233.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.3
, pp. 227-233
-
-
Ye, S.1
Tiong, R.L.K.2
-
22
-
-
0025503588
-
Risks, classification of estimates, and contingency management
-
Yeo, K. T. (1990). "Risks, classification of estimates, and contingency management." J. Manage. Eng., 6(4), 458-470.
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.4
, pp. 458-470
-
-
Yeo, K.T.1
|