Optimal time-cost tradeoffs in GERT networks
-
Arisawa S., and Elmaghraby S. Optimal time-cost tradeoffs in GERT networks. Management Science 18 (1972) 589-599
-
(1972)
Management Science
, vol.18
, pp. 589-599
-
-
Arisawa, S.1
Elmaghraby, S.2
-
2
-
-
0010506766
-
Managing project activity-duration uncertainties
-
Arsham H. Managing project activity-duration uncertainties. Omega 21 (1993) 111-122
-
(1993)
Omega
, vol.21
, pp. 111-122
-
-
Arsham, H.1
-
3
-
-
33645892898
-
A multi-objective resource allocation problem in PERT networks
-
Azaron A., Katagiri H., Sakawa M., Kato K., and Memariani A. A multi-objective resource allocation problem in PERT networks. European Journal of Operational Research 172 (2006) 838-854
-
(2006)
European Journal of Operational Research
, vol.172
, pp. 838-854
-
-
Azaron, A.1
Katagiri, H.2
Sakawa, M.3
Kato, K.4
Memariani, A.5
-
4
-
-
26044472796
-
A genetic algorithm approach for the time-cost trade-off in PERT networks
-
Azaron A., Perkgoz C., and Sakawa M. A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied Mathematics and Computation 168 (2005) 1317-1339
-
(2005)
Applied Mathematics and Computation
, vol.168
, pp. 1317-1339
-
-
Azaron, A.1
Perkgoz, C.2
Sakawa, M.3
-
6
-
-
15244342527
-
Distribution function of the shortest path in networks of queues
-
Azaron A., and Modarres M. Distribution function of the shortest path in networks of queues. OR Spectrum 27 (2005) 123-144
-
(2005)
OR Spectrum
, vol.27
, pp. 123-144
-
-
Azaron, A.1
Modarres, M.2
-
7
-
-
0042416400
-
Resource allocation in a PERT network under continuous activity time-cost function
-
Berman E. Resource allocation in a PERT network under continuous activity time-cost function. Management Science 10 (1964) 734-745
-
(1964)
Management Science
, vol.10
, pp. 734-745
-
-
Berman, E.1
-
8
-
-
0004374576
-
A time-cost trade-off model with resource consideration using genetic algorithm
-
Chau D., Chan W., and Govindan K. A time-cost trade-off model with resource consideration using genetic algorithm. Civil Engineering Systems 14 (1997) 291-311
-
(1997)
Civil Engineering Systems
, vol.14
, pp. 291-311
-
-
Chau, D.1
Chan, W.2
Govindan, K.3
-
9
-
-
38249024695
-
Resource constraint project crashing
-
Deckro R., and Hebert J. Resource constraint project crashing. Omega 17 (1989) 69-79
-
(1989)
Omega
, vol.17
, pp. 69-79
-
-
Deckro, R.1
Hebert, J.2
-
10
-
-
33847065395
-
-
E. Demeulemeester, W. Herroelen, S. Elmaghraby, Optimal procedures for the discrete time-cost trade-off problem in project networks. Research Report, Department of Applied Economics, Katholieke Universiteit Leuven, Leuven, Belgium (1993).
-
-
-
-
11
-
-
0027302082
-
Resource allocation via dynamic programming in activity networks
-
Elmaghraby S. Resource allocation via dynamic programming in activity networks. European Journal of Operational Research 64 (1993) 199-245
-
(1993)
European Journal of Operational Research
, vol.64
, pp. 199-245
-
-
Elmaghraby, S.1
-
12
-
-
0015484051
-
Critical path problem with concave cost curves
-
Falk J., and Horowitz J. Critical path problem with concave cost curves. Management Science 19 (1972) 446-455
-
(1972)
Management Science
, vol.19
, pp. 446-455
-
-
Falk, J.1
Horowitz, J.2
-
13
-
-
0000181338
-
A network flow computation for project cost curves
-
Fulkerson D. A network flow computation for project cost curves. Management Science 7 (1961) 167-178
-
(1961)
Management Science
, vol.7
, pp. 167-178
-
-
Fulkerson, D.1
-
16
-
-
0030393113
-
Hierarchical decision-making model for planning and controlling stochastic projects
-
Golenko-Ginzburg D., and Gonik A. Hierarchical decision-making model for planning and controlling stochastic projects. International Journal of Production Economics 46-47 (1996) 39-54
-
(1996)
International Journal of Production Economics
, vol.46-47
, pp. 39-54
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
17
-
-
0024132264
-
Controlled alternative activity networks in project management
-
Golenko-Ginzburg D. Controlled alternative activity networks in project management. European Journal of Operational Research 37 (1988) 336-346
-
(1988)
European Journal of Operational Research
, vol.37
, pp. 336-346
-
-
Golenko-Ginzburg, D.1
-
20
-
-
0347821383
-
High performance heuristic algorithm for controlling stochastic network projects
-
Golenko-Ginzburg D., and Gonik A. High performance heuristic algorithm for controlling stochastic network projects. International Journal of Production Economics 54 (1998) 235-245
-
(1998)
International Journal of Production Economics
, vol.54
, pp. 235-245
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
22
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource reallocation
-
Golenko-Ginzburg D., and Gonik A. A heuristic for network project scheduling with random activity durations depending on the resource reallocation. International Journal of Production Economics 55 (1998) 149-162
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
25
-
-
0001620447
-
Critical path planning and scheduling: Mathematical basis
-
Kelly J. Critical path planning and scheduling: Mathematical basis. Operations Research 9 (1961) 296-320
-
(1961)
Operations Research
, vol.9
, pp. 296-320
-
-
Kelly, J.1
-
26
-
-
0022785024
-
Markov and Markov-regenerative PERT networks
-
Kulkarni V., and Adlakha V. Markov and Markov-regenerative PERT networks. Operations Research 34 (1986) 769-781
-
(1986)
Operations Research
, vol.34
, pp. 769-781
-
-
Kulkarni, V.1
Adlakha, V.2
-
27
-
-
0014804811
-
Optimum time compression in project scheduling
-
Lamberson L., and Hocking R. Optimum time compression in project scheduling. Management Science 16 (1970) 597-606
-
(1970)
Management Science
, vol.16
, pp. 597-606
-
-
Lamberson, L.1
Hocking, R.2
-
28
-
-
0037349305
-
Activity time-cost tradeoffs under time and cost chance constraints
-
Laslo Z. Activity time-cost tradeoffs under time and cost chance constraints. Computers and Industrial Engineering 44 (2003) 365-384
-
(2003)
Computers and Industrial Engineering
, vol.44
, pp. 365-384
-
-
Laslo, Z.1
-
29
-
-
0346149435
-
A CPM time-cost computational algorithm for arbitrary activity cost functions
-
Panagiotakopoulos D. A CPM time-cost computational algorithm for arbitrary activity cost functions. INFOR 15 (1977) 183-195
-
(1977)
INFOR
, vol.15
, pp. 183-195
-
-
Panagiotakopoulos, D.1
-
30
-
-
0016566179
-
A dynamic programming solution to cost-time trade-off for CPM
-
Robinson D. A dynamic programming solution to cost-time trade-off for CPM. Management Science 22 (1965) 158-166
-
(1965)
Management Science
, vol.22
, pp. 158-166
-
-
Robinson, D.1
-
32
-
-
0003480493
-
-
Prentice Hall International, Inc, New York
-
Shtub A., Bard J., and Globerson S. Project Management: Engineering, Technology and Implementation (1994), Prentice Hall International, Inc, New York
-
(1994)
Project Management: Engineering, Technology and Implementation
-
-
Shtub, A.1
Bard, J.2
Globerson, S.3
-
34
-
-
0019612987
-
Project scheduling with continuously divisible doubly constrained resources
-
Weglarz J. Project scheduling with continuously divisible doubly constrained resources. Management Science 27 (1981) 1040-1053
-
(1981)
Management Science
, vol.27
, pp. 1040-1053
-
-
Weglarz, J.1
|