메뉴 건너뛰기




Volumn 47, Issue 2, 1996, Pages 266-283

On-line control model for cost-simulation network projects

Author keywords

Activity network; Budget reassignment; Chance constraint; Online control; Stochastic project

Indexed keywords

BUDGET CONTROL; COST EFFECTIVENESS; HIERARCHICAL SYSTEMS; MATHEMATICAL MODELS; ONLINE SYSTEMS; PERT; PROBABILITY; STOCHASTIC CONTROL SYSTEMS;

EID: 0030084906     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.1996.24     Document Type: Article
Times cited : (14)

References (29)
  • 1
    • 84982676423 scopus 로고
    • Preferences and perceptions of R&D project managers
    • D. M. Dougherty, D. E. Ezell and D. B. Stephens (1984) Preferences and perceptions of R and D project managers. R and D Mgmt 14(1), 47-56.
    • (1984) R and D Mgmt. , vol.14 , Issue.1 , pp. 47-56
    • Dougherty, D.M.1    Ezell, D.E.2    Stephens, D.B.3
  • 2
    • 0037644390 scopus 로고
    • The use of advanced management techniques in R and D
    • K. M. Watts and J. C. Higgins (1987) The use of advanced management techniques in R and D. Omega 15, 21-29.
    • (1987) Omega , vol.15 , pp. 21-29
    • Watts, K.M.1    Higgins, J.C.2
  • 3
    • 0041453249 scopus 로고
    • Planning and control in research and development
    • A. W. Pearson (1990) Planning and control in research and development. Omega 18, 573-581.
    • (1990) Omega , vol.18 , pp. 573-581
    • Pearson, A.W.1
  • 4
    • 0000302001 scopus 로고
    • GERT graphical evaluation and review technique, Part I (Fundamentals)
    • A. A. B. Pritsker and W. W. Happ (1966) GERT graphical evaluation and review technique, Part I (Fundamentals). J. Ind. Engnr. 17, 267-274.
    • (1966) J. Ind. Engnr. , vol.17 , pp. 267-274
    • Pritsker, A.A.B.1    Happ, W.W.2
  • 5
    • 0000302002 scopus 로고
    • GERT graphical evaluation and review technique, Part II (Probabilistic and Industrial Engineering Applications)
    • A. A. B. Pritsker, and G. E. Whitehouse (1966) GERT graphical evaluation and review technique, Part II (Probabilistic and Industrial Engineering Applications). J. Ind. Engnr. 17, 293-301.
    • (1966) J. Ind. Engnr. , vol.17 , pp. 293-301
    • Pritsker, A.A.B.1    Whitehouse, G.E.2
  • 6
    • 84984717582 scopus 로고
    • Presented to 23rd Institute Conference and Convention of the American Institute of Industr
    • Engineering, California, September
    • G. L. Moeller (1982) VERT technical papers. Presented to 23rd Institute Conference and Convention of the American Institute of Industr. Engineering, California, September.
    • (1982) VERT Technical Papers
    • Moeller, G.L.1
  • 7
    • 38149144832 scopus 로고
    • A comparison between the VERT program and other methods of project duration estimates
    • J. B. Kidd (1987) A comparison between the VERT program and other methods of project duration estimates. Omega 15, 129-134.
    • (1987) Omega , vol.15 , pp. 129-134
    • Kidd, J.B.1
  • 8
    • 0024132264 scopus 로고
    • Controlled alternative activity networks in project management
    • D. Golenko-Ginzburg (1988) Controlled alternative activity networks in project management. Eur. J. Opl Res. 37, 336-346.
    • (1988) Eur. J. Opl Res. , vol.37 , pp. 336-346
    • Golenko-Ginzburg, D.1
  • 9
    • 0027642129 scopus 로고
    • A two-level decision-making model for controlling stochastic projects
    • D. Golenko-Ginzburg (1993) A two-level decision-making model for controlling stochastic projects. Int. J. Prod. Economics 32, 117-127.
    • (1993) Int. J. Prod. Economics , vol.32 , pp. 117-127
    • Golenko-Ginzburg, D.1
  • 10
    • 5244364936 scopus 로고
    • Bias in PERT project completion time calculations for a real network
    • A. R. Klingel, Jr. (1966) Bias in PERT project completion time calculations for a real network. Mgmt. Sci. 13, B194-B201.
    • (1966) Mgmt. Sci. , vol.13 , pp. B194-B201
    • Klingel, A.R.1
  • 11
    • 0016950488 scopus 로고
    • Bayesian point estimation and the PERT scheduling of stochastic activities
    • B. R. Britney (1976) Bayesian point estimation and the PERT scheduling of stochastic activities. Mgmt. Sci. 22, 938-948.
    • (1976) Mgmt. Sci. , vol.22 , pp. 938-948
    • Britney, B.R.1
  • 14
    • 0038654496 scopus 로고
    • Why projects are ‘always’ late: A rationale based on manual simulation of a PERT/CPM network
    • R. J. Schonberger (1981) Why projects are ‘always’ late: a rationale based on manual simulation of a PERT/CPM network. Interfaces 11(5), 66-70.
    • (1981) Interfaces , vol.11 , Issue.5 , pp. 66-70
    • Schonberger, R.J.1
  • 15
    • 0041859693 scopus 로고
    • Why projects fail: The effects of ignoring the obvious
    • M. W. Hughes (1986) Why projects fail: the effects of ignoring the obvious. Ind. Engnr. 18(4), 14-18.
    • (1986) Ind. Engnr. , vol.18 , Issue.4 , pp. 14-18
    • Hughes, M.W.1
  • 16
    • 5244329513 scopus 로고
    • Hierarchical budget allocation problems for planning and controlling stochastic network projects. Preprints of the 8th Int
    • February 21-25, 1994, Igls-Innsbruck
    • D. Golenko-Ginzburg, A. Gonik and Sh. Kesler (1994) Hierarchical budget allocation problems for planning and controlling stochastic network projects. Preprints of the 8th Int. Working Seminar on Prod. Economics. February 21-25, 1994, Igls-Innsbruck, Vol. 1, 393-406.
    • (1994) Working Seminar on Prod. Economics , vol.1 , pp. 393-406
    • Golenko-Ginzburg, D.1    Gonik, A.2    Kesler, S.H.3
  • 20
    • 0011912650 scopus 로고
    • Activity subdivision and PERT probability statements
    • T. Healy (1961) Activity subdivision and PERT probability statements. Opns Res. 9, 341-348.
    • (1961) Opns Res. , vol.9 , pp. 341-348
    • Healy, T.1
  • 21
    • 0002641538 scopus 로고
    • An analytical study of PERT assumptions
    • K. R. MacGrimmon and C. A. Ryavec (1964) An analytical study of PERT assumptions. Opns Res. 12, 16-37.
    • (1964) Opns Res. , vol.12 , pp. 16-37
    • Macgrimmon, K.R.1    Ryavec, C.A.2
  • 24
    • 0024063984 scopus 로고
    • On the distribution of activity time in PERT
    • D. Golenko-Ginzburg (1988) On the distribution of activity time in PERT. J. Opl. Res. Soc. 39, 767-771.
    • (1988) J. Opl. Res. Soc. , vol.39 , pp. 767-771
    • Golenko-Ginzburg, D.1
  • 25
    • 38249026380 scopus 로고
    • PERT assumptions revisited
    • D. Golenko-Ginzburg (1989) PERT assumptions revisited. Omega 17, 393-396.
    • (1989) Omega , vol.17 , pp. 393-396
    • Golenko-Ginzburg, D.1
  • 26
    • 84974860315 scopus 로고
    • A new distribution function for risk analysis
    • J. Berny (1989) A new distribution function for risk analysis. J. Opl Res. Soc. 40, 1121-1127.
    • (1989) J. Opl Res. Soc. , vol.40 , pp. 1121-1127
    • Berny, J.1
  • 27
    • 0010506766 scopus 로고
    • Managing project activity-duration uncertainties
    • H. Arsham (1993) Managing project activity-duration uncertainties. Omega 21(1), 111-122.
    • (1993) Omega , vol.21 , Issue.1 , pp. 111-122
    • Arsham, H.1
  • 28
    • 0026837875 scopus 로고
    • Practical use of distributions in activity analysis
    • T. Williams (1992) Practical use of distributions in activity analysis. J. Opl Res. Soc. 43, 265-270.
    • (1992) J. Opl Res. Soc. , vol.43 , pp. 265-270
    • Williams, T.1
  • 29
    • 0003087344 scopus 로고
    • Various techniques used in connection with random digits
    • J. Neumann (1951) Various techniques used in connection with random digits. NBS Appl. Math. Series 12, 36-38.
    • (1951) NBS Appl. Math. Series , vol.12 , pp. 36-38
    • Neumann, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.