-
1
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean, J. C. 1994. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing 6: 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
2
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F. F. 1990. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operations Research 49: 3-13.
-
(1990)
European Journal of Operations Research
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
3
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W., Chua, D. K. H., and Kannan, G. 1996. Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management 122: 125-132.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, pp. 125-132
-
-
Chan, W.1
Chua, D.K.H.2
Kannan, G.3
-
4
-
-
0015725454
-
Project scheduling under resource constraints - Historical review and categorization of procedures
-
Davis, E. W. 1973. Project scheduling under resource constraints - Historical review and categorization of procedures. AIIE Transactions 5: 297-313.
-
(1973)
AIIE Transactions
, vol.5
, pp. 297-313
-
-
Davis, E.W.1
-
6
-
-
0032188522
-
A competitive genetic algorithm for resource-sonstrained project scheduling
-
Hartmann S. 1998. A competitive genetic algorithm for resource-sonstrained project scheduling. Naval Research Logistics 45: 733-750.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
7
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. 1999. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management 125: 167-175.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, pp. 167-175
-
-
Hegazy, T.1
-
9
-
-
0003906653
-
-
3rd ed. New York: Van Nostrand Reinhold Company
-
Moder, J. J., Phillips, C. R., and Davis, E. 1983. Project management with CPM, PERT, and precedence Diagramming. 3rd ed. New York: Van Nostrand Reinhold Company.
-
(1983)
Project management with CPM, PERT, and precedence Diagramming
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.3
-
12
-
-
33846694331
-
-
Reeves, C. R. 1995. Genetic algorithms and combinatorial optimization. In Applications of Modern Heuristic Methods, ed. V. J. Rayward-Smith, 111-125. Henley-on-Thames, UK: Alfred Waller Ltd.
-
Reeves, C. R. 1995. Genetic algorithms and combinatorial optimization. In Applications of Modern Heuristic Methods, ed. V. J. Rayward-Smith, 111-125. Henley-on-Thames, UK: Alfred Waller Ltd.
-
-
-
-
16
-
-
33846680471
-
-
tutorial [online, Available via, accessed April 18
-
Whitley, D. 1993. A genetic algorithms tutorial [online]. Available via 〈http://samizdat.mines.edu/ga_tutori al/〉 [accessed April 18, 2004].
-
(1993)
A genetic algorithms
-
-
Whitley, D.1
|