Planning construction of repetitive building units
-
Robert I. Carr, and Walter L. Mayer Planning construction of repetitive building units J. Constr. Div., ASCE l00 CO3 1974 403 412
-
(1974)
J. Constr. Div., ASCE
, vol.0
, Issue.3
, pp. 403-412
-
-
Carr Robert, I.1
Mayer Walter, L.2
-
2
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
James J. O'Brien VPM scheduling for high-rise buildings J. Constr. Div., ASCE 101 CO4 1975 895 905
-
(1975)
J. Constr. Div., ASCE
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien, J.J.1
-
3
-
-
0019030431
-
Construction planning for linear projects
-
Shlomo Selinger Construction planning for linear projects J. Constr. Div., ASCE 106 CO2 1980 195 205
-
(1980)
J. Constr. Div., ASCE
, vol.106
, Issue.2
, pp. 195-205
-
-
Shlomo, S.1
-
4
-
-
0019583188
-
Linear scheduling method for highway construction
-
David W. Johnston Linear scheduling method for highway construction J. Constr. Div., ASCE 107 CO2 1981 247 261
-
(1981)
J. Constr. Div., ASCE
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston David, W.1
-
5
-
-
0020178299
-
Time space scheduling method
-
Oldrich Stradal, and Jisef Cacha Time space scheduling method J. Constr. Div., ASCE 108 CO3 1982 269 278
-
(1982)
J. Constr. Div., ASCE
, vol.108
, Issue.3
, pp. 269-278
-
-
Oldrich, S.1
Jisef, C.2
-
6
-
-
0022778511
-
Line-of-balance scheduling of pavement construction
-
David Arditi, and M. Zeki Albulak Line-of-balance scheduling of pavement construction J. Constr. Eng. Manag., ASCE 112 3 1986 411 424
-
(1986)
J. Constr. Eng. Manag., ASCE
, vol.112
, Issue.3
, pp. 411-424
-
-
David, A.1
Zeki, A.M.2
-
8
-
-
0025447970
-
RPM: Repetitive project modeling
-
Rehab M. Reda RPM: repetitive project modeling J. Constr. Eng. Manag., ASCE 116 2 1990 316 330
-
(1990)
J. Constr. Eng. Manag., ASCE
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda Rehab, M.1
-
9
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
Khaled El-Rayes, and Samma Moselhi Resource-driven scheduling of repetitive activities Constr. Manag. Econ. 16 1998 433 446
-
(1998)
Constr. Manag. Econ.
, vol.16
, pp. 433-446
-
-
Khaled, E.1
Samma, M.2
-
10
-
-
0000802988
-
Linear scheduling model development of controlling activity path
-
David J. Harmelink, and James E. Rowings Linear scheduling model development of controlling activity path J. Constr. Eng. Manag., ASCE 124 4 1998 263 268
-
(1998)
J. Constr. Eng. Manag., ASCE
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink David, J.1
Rowings James, E.2
-
12
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Tarek Hegazy, and Nagib Wassef Cost optimization in projects with repetitive nonserial activities J. Constr. Eng. Manag., ASCE 127 3 2001 183 191
-
(2001)
J. Constr. Eng. Manag., ASCE
, vol.127
, Issue.3
, pp. 183-191
-
-
Tarek, H.1
Nagib, W.2
-
13
-
-
0004749860
-
The application of the "line-of-balance" technique to the construction industry
-
Khisty, C.J., The application of the "line-of-balance" technique to the construction industry, Indian Concrete Journal, 44 (7) (1970) 297-300 and 319-320.
-
(1970)
Indian Concrete Journal
, vol.44
, Issue.7
, pp. 297-300
-
-
Khisty, C.J.1
-
14
-
-
0019064535
-
Construction planning-beyond the critical path
-
G.S. Birrell Construction planning-beyond the critical path J. Constr. Div., ASCE 106 CO3 1980 389 407
-
(1980)
J. Constr. Div., ASCE
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
15
-
-
0025598377
-
Formal development of line-of-balance technique
-
Zohair M. Al Sarraj Formal development of line-of-balance technique J. Constr. Eng. Manag., ASCE 116 4 1990 689 704
-
(1990)
J. Constr. Eng. Manag., ASCE
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
16
-
-
0035482888
-
Algorithm for determining controlling path considering resource continuity
-
Mohammad A. Ammar, and Emad Elbeltagi Algorithm for determining controlling path considering resource continuity J. Comput. Civ. Eng., ASCE 15 4 2001 292 298
-
(2001)
J. Comput. Civ. Eng., ASCE
, vol.15
, Issue.4
, pp. 292-298
-
-
Ammar Mohammad, A.1
Emad, E.2
-
17
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Osama Moselhi, and Khaled El-Rayes Scheduling of repetitive projects with cost optimization J. Constr. Eng. Manag., ASCE 119 4 1993 681 697
-
(1993)
J. Constr. Eng. Manag., ASCE
, vol.119
, Issue.4
, pp. 681-697
-
-
Osama, M.1
Khaled, E.2
-
21
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
Khaled El-Rayes, and Osama Moselhi Optimizing resource utilization for repetitive construction projects J. Constr. Eng. Manag., ASCE 127 1 2001 18 27
-
(2001)
J. Constr. Eng. Manag., ASCE
, vol.127
, Issue.1
, pp. 18-27
-
-
Khaled, E.1
Osama, M.2
-
22
-
-
33644564793
-
An integrated technology information system-an example on precasting building construction
-
Sou-Sen Leu, and Yn-Mei Jeng An integrated technology information system-an example on precasting building construction J. of Chinese Institute of Civil and Hydraulic Engineering 12 3 2000 611 620
-
(2000)
J. of Chinese Institute of Civil and Hydraulic Engineering
, vol.12
, Issue.3
, pp. 611-620
-
-
Sou-Sen, L.1
Yn-Mei, J.2
-
24
-
-
0003511049
-
-
Prentice-Hall Englewood Cliffs, NJ
-
J. Rumbaugh, M. Blaha, W. Premerlani, F. Eddy, and W. Lorensen Object-oriented Modeling and Design 1991 Prentice-Hall Englewood Cliffs, NJ
-
(1991)
Object-oriented Modeling and Design
-
-
Rumbaugh, J.1
Blaha, M.2
Premerlani, W.3
Eddy, F.4
Lorensen, W.5
|