메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages 2194-2202

Using simulation based approach to improve on the mean cycle time performance of dispatching rules

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; HEURISTIC METHODS; PROBLEM SOLVING; PRODUCT DEVELOPMENT; PRODUCTION CONTROL;

EID: 33846650723     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2005.1574506     Document Type: Conference Paper
Times cited : (8)

References (35)
  • 1
    • 0023977010 scopus 로고    scopus 로고
    • The Shifting Bottleneck Procedure for Job Shop Scheduling
    • Adams, J., Balas, E. and Zawack, D. 1998. The Shifting Bottleneck Procedure for Job Shop Scheduling, Management Science, 34 (1): 391-401.
    • (1998) Management Science , vol.34 , Issue.1 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 3
    • 0026126118 scopus 로고
    • A Computational Study of the Job Shop Scheduling Problem
    • Applegate, D. and Cook, W. 1991. A Computational Study of the Job Shop Scheduling Problem, ORSA Journal on Computing, 3 (2): 149-156.
    • (1991) ORSA Journal on Computing , vol.3 , Issue.2 , pp. 149-156
    • Applegate, D.1    Cook, W.2
  • 4
    • 0031997369 scopus 로고    scopus 로고
    • Guided Local Search with Shifting Bottleneck for Job Shop Scheduling
    • Balas, E. and Vazacopoulos, A. 1998. Guided Local Search with Shifting Bottleneck for Job Shop Scheduling, Management Science, 44 (2): 262-275.
    • (1998) Management Science , vol.44 , Issue.2 , pp. 262-275
    • Balas, E.1    Vazacopoulos, A.2
  • 5
    • 0020013653 scopus 로고
    • A State-of-the-art Survey of Dispatching Rules for Manufacturing Job Shop Operations
    • Blackstone, J. H., Philips, D. T. and Hogg, G. L. 1982. A State-of-the-art Survey of Dispatching Rules for Manufacturing Job Shop Operations, International Journal of Production Research, 20 (1): 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Philips, D.T.2    Hogg, G.L.3
  • 6
    • 0030212629 scopus 로고    scopus 로고
    • The Job Shop Scheduling Problem: Conventional and New Solution Techniques
    • Blazewicz, J., Domschke, W. and Pesch, E. 1996. The Job Shop Scheduling Problem: Conventional and New Solution Techniques, European Journal of Operational Research, 93 (1): 1-33.
    • (1996) European Journal of Operational Research , vol.93 , Issue.1 , pp. 1-33
    • Blazewicz, J.1    Domschke, W.2    Pesch, E.3
  • 7
    • 43949161199 scopus 로고
    • A Branch and Bound Algorithm for the Job Shop Scheduling Problem
    • Brucker, P., Jurisch, B. and Sievers, B. 1994. A Branch and Bound Algorithm for the Job Shop Scheduling Problem, Discrete Applied Mathematics, 49 (1): 109-127.
    • (1994) Discrete Applied Mathematics , vol.49 , Issue.1 , pp. 109-127
    • Brucker, P.1    Jurisch, B.2    Sievers, B.3
  • 9
    • 17744382009 scopus 로고    scopus 로고
    • Incremental HLA-based Distributed Simulation Cloning
    • ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, Piscataway, NJ: Institute of Electrical and Electronics Engineers
    • Chen, D., Turner, S. J., Cai, W. T., Gan, B. P. and Low, Y. H. 2004. Incremental HLA-based Distributed Simulation Cloning, In Proceedings of the 2004 Winter Simulation Conference, ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, 386-394. Piscataway, NJ: Institute of Electrical and Electronics Engineers.
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 386-394
    • Chen, D.1    Turner, S.J.2    Cai, W.T.3    Gan, B.P.4    Low, Y.H.5
  • 10
    • 0011788714 scopus 로고
    • Network Dispatching by Shortest Operation Discipline
    • Conway, R. W. and Maxwell., W. L. 1962. Network Dispatching by Shortest Operation Discipline, Operations Research, 10 (1): 51-62.
    • (1962) Operations Research , vol.10 , Issue.1 , pp. 51-62
    • Conway, R.W.1    Maxwell, W.L.2
  • 11
    • 0016037996 scopus 로고
    • The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Various Arrival Distributions
    • Elvers, D. E. 1974. The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Various Arrival Distributions, AIIE Transactions., 6 (1): 41-54.
    • (1974) AIIE Transactions , vol.6 , Issue.1 , pp. 41-54
    • Elvers, D.E.1
  • 12
    • 0001947856 scopus 로고
    • Probabilistic Learning Combination of Local Job Shop Scheduling Rules
    • Fisher, H. and Thompson G. L. 1963. Probabilistic Learning Combination of Local Job Shop Scheduling Rules, Industrial Scheduling, 225-251.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 14
    • 0000965956 scopus 로고
    • Heuristics in jobshop scheduling
    • Gere, W. S., Jr. 1966. Heuristics in jobshop scheduling, Management Science, 13 (1): 167-175.
    • (1966) Management Science , vol.13 , Issue.1 , pp. 167-175
    • Gere Jr., W.S.1
  • 15
    • 0034427421 scopus 로고    scopus 로고
    • Recursive Simulation to Aid Models of Decisionmaking
    • ed. J. A. Joines, R. R. Barton, K. Kang and P. A. Fishwick, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Gilmer, J. B. and Sullivan. F. J. 2000. Recursive Simulation to Aid Models of Decisionmaking, In Proceedings of the 2000 Winter Simulation Conference, ed. J. A. Joines, R. R. Barton, K. Kang and P. A. Fishwick. 958-963. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2000) Proceedings of the 2000 Winter Simulation Conference , pp. 958-963
    • Gilmer, J.B.1    Sullivan, F.J.2
  • 16
    • 1642477961 scopus 로고    scopus 로고
    • The Use of Recursive Simulation to Support Decisionmaking
    • ed. S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Gilmer, J. B. and Sullivan. F. J. 2003. The Use of Recursive Simulation to Support Decisionmaking, In Proceedings of the 2003 Winter Simulation Conference, ed. S. Chick, P. J. Sanchez, D. Ferrin, and D. J. Morrice. 1116-1121. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 1116-1121
    • Gilmer, J.B.1    Sullivan, F.J.2
  • 17
    • 17744365021 scopus 로고    scopus 로고
    • An Urban Terrain Abstraction to Support Decision Making Using Recursive Simulation
    • ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Gilmer, J. B. 2004. An Urban Terrain Abstraction to Support Decision Making Using Recursive Simulation," In Proceedings of the 2004 Winter Simulation Conference, ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, 982-988. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 982-988
    • Gilmer, J.B.1
  • 20
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic Job Shop Scheduling: Past, Present and Future
    • Jain. A. S. and Meeran. S. 1999. Deterministic Job Shop Scheduling: Past, Present and Future, European Journal of Operational Research, 113 (2): 390-434.
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 21
    • 0032163477 scopus 로고    scopus 로고
    • A Real-time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules
    • Jeong, K. C. and Kim, Y. D. 1998. A Real-time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules, International Journal of Production Research, 36 (9): 2609-2626.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.C.1    Kim, Y.D.2
  • 24
    • 0035705542 scopus 로고    scopus 로고
    • Lee, L. H., Tang, L. C. and Chan, S. C. 2001. Dispatching Heuristic for Wafer Fabrication, In Proceedings of the 2001 Winter Simulation Conference, e.d. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer. 1215-1219. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • Lee, L. H., Tang, L. C. and Chan, S. C. 2001. Dispatching Heuristic for Wafer Fabrication, In Proceedings of the 2001 Winter Simulation Conference, e.d. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer. 1215-1219. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
  • 26
    • 0031371575 scopus 로고    scopus 로고
    • Creating a Flexible, Simulation-based Finite Scheduling Tools
    • ed. S. Andradottir, K.J. Healy, D.H. Withers, and B.L. Nelson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Mazziotti, B. W., and Home, Jr., R. E. 1997. Creating a Flexible, Simulation-based Finite Scheduling Tools, In Proceedings of the 1997 Winter Simulation Conference, ed. S. Andradottir, K.J. Healy, D.H. Withers, and B.L. Nelson, 853-858. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (1997) Proceedings of the 1997 Winter Simulation Conference , pp. 853-858
    • Mazziotti, B.W.1    Home Jr., R.E.2
  • 27
    • 0242269876 scopus 로고    scopus 로고
    • Development of a Real-time Multi-objective Scheduler for a Semiconductor Fabrication System
    • Min, H. S. and Yih, Y. W. 2003. Development of a Real-time Multi-objective Scheduler for a Semiconductor Fabrication System, International Journal of Production Research, 41 (10): 2345-2364.
    • (2003) International Journal of Production Research , vol.41 , Issue.10 , pp. 2345-2364
    • Min, H.S.1    Yih, Y.W.2
  • 28
    • 0031374260 scopus 로고    scopus 로고
    • Efficient Simulation / Optimization of Dispatching Priority with "Fake" Processing Time
    • ed. S. Andradottir, K.J. Healy, D.H. Withers, and B.L. Nelson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Morito, S. and Lee, K. H. 1997. Efficient Simulation / Optimization of Dispatching Priority with "Fake" Processing Time, In Proceedings of the 1997 Winter Simulation Conference, ed. S. Andradottir, K.J. Healy, D.H. Withers, and B.L. Nelson, 872-879. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (1997) Proceedings of the 1997 Winter Simulation Conference , pp. 872-879
    • Morito, S.1    Lee, K.H.2
  • 29
    • 0042305903 scopus 로고
    • An Experimental Investigation and Comparative Evaluation of Priority Disciplines in Job-shop Like Queuing Networks
    • Management Science Research Project, UCLA, No. 87
    • Nanot, Y. R. 1963. An Experimental Investigation and Comparative Evaluation of Priority Disciplines in Job-shop Like Queuing Networks, Management Science Research Project, UCLA, Research report, No. 87.
    • (1963) Research report
    • Nanot, Y.R.1
  • 30
    • 5244278595 scopus 로고    scopus 로고
    • A Fast Taboo Search Algorithm for the Job Shop Problem
    • Nowicki, E. and Smutnicki, C. 1996. A Fast Taboo Search Algorithm for the Job Shop Problem, Management Science, 42 (6): 797-813.
    • (1996) Management Science , vol.42 , Issue.6 , pp. 797-813
    • Nowicki, E.1    Smutnicki, C.2
  • 31
    • 0032649737 scopus 로고    scopus 로고
    • A Comparative Study of Dispatching Rules in Dynamic Flowshops and Jobshops
    • Rajendran, C. and Holthaus, O. 1999. A Comparative Study of Dispatching Rules in Dynamic Flowshops and Jobshops, European Journal of Operational Research, 116(1): 156-170.
    • (1999) European Journal of Operational Research , vol.116 , Issue.1 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 32
    • 0033331613 scopus 로고    scopus 로고
    • Optimization of Cycle Time and Utilization in Semiconductor Test Manufacturing Using Simulation Based, On-line Near-real-time Scheduling System
    • ed. P.A. Farington, H.B. Nembhard, D.T. Sturrok, and G.W. Evans, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Sivakumar, A. I. 1999. Optimization of Cycle Time and Utilization in Semiconductor Test Manufacturing Using Simulation Based, On-line Near-real-time Scheduling System, In Proceedings of the 1999 Winter Simulation Conference, ed. P.A. Farington, H.B. Nembhard, D.T. Sturrok, and G.W. Evans, 727-735. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (1999) Proceedings of the 1999 Winter Simulation Conference , pp. 727-735
    • Sivakumar, A.I.1
  • 33
    • 0026930899 scopus 로고
    • New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
    • Storer, R. H., Wu, S. D. and Vaccari, R. 1992. New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling, Management Science, 38 (1): 1495-1509.
    • (1992) Management Science , vol.38 , Issue.1 , pp. 1495-1509
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3
  • 34
    • 0032072554 scopus 로고    scopus 로고
    • Multiobjective Scheduling for IC Sort and Test with a Simulation Testbed
    • Yang, Y. and Chang, T. S. 1998. Multiobjective Scheduling for IC Sort and Test with a Simulation Testbed, IEEE Transactions on Semiconductor Manufacturing, 11(1): 304-315.
    • (1998) IEEE Transactions on Semiconductor Manufacturing , vol.11 , Issue.1 , pp. 304-315
    • Yang, Y.1    Chang, T.S.2
  • 35
    • 17744376221 scopus 로고    scopus 로고
    • A New Approach to Multi-pass Scheduling in Shop Floor Control
    • ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
    • Yoo, T. J., Kim, D. H. and Cho, H. B. 2004. A New Approach to Multi-pass Scheduling in Shop Floor Control, In Proceedings of the 2004 Winter Simulation Conference, ed. R. G. Ingalls, M. D. Rossetti, J. S. Smith, and B. A. Peters, 1109-1114. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
    • (2004) Proceedings of the 2004 Winter Simulation Conference , pp. 1109-1114
    • Yoo, T.J.1    Kim, D.H.2    Cho, H.B.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.