메뉴 건너뛰기




Volumn 52, Issue 11, 2006, Pages 3864-3881

Addressing the scheduling of chemical supply chains under demand uncertainty

Author keywords

Multistage stochastic programming; SCM

Indexed keywords

CHEMICAL ENGINEERING; COMPUTATION THEORY; MATHEMATICAL MODELS; NUMERICAL METHODS; SET THEORY; STOCHASTIC PROGRAMMING;

EID: 33750548417     PISSN: 00011541     EISSN: 15475905     Source Type: Journal    
DOI: 10.1002/aic.10973     Document Type: Article
Times cited : (14)

References (43)
  • 3
    • 0034063545 scopus 로고    scopus 로고
    • Supply chain optimization in continuous flexible process networks
    • Bok JW, Grossmann IE, Park S. Supply chain optimization in continuous flexible process networks. Ind and Eng Chem Res. 2000;39:1279-1290.
    • (2000) Ind and Eng Chem Res. , vol.39 , pp. 1279-1290
    • Bok, J.W.1    Grossmann, I.E.2    Park, S.3
  • 4
    • 30344444492 scopus 로고    scopus 로고
    • Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains
    • Guillén G, Badell M, Espuña A, Puigjaner L. Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains. Comp and Chem Eng. 2006;30:421-436.
    • (2006) Comp and Chem Eng. , vol.30 , pp. 421-436
    • Guillén, G.1    Badell, M.2    Espuña, A.3    Puigjaner, L.4
  • 5
    • 0034306197 scopus 로고    scopus 로고
    • A two-stage modelling and solution framework for multisite midterm planning under demand uncertainty
    • Gupta A, Maranas CD. A two-stage modelling and solution framework for multisite midterm planning under demand uncertainty. Ind and Eng Chem Res. 2000;39:3799-3813.
    • (2000) Ind and Eng Chem Res. , vol.39 , pp. 3799-3813
    • Gupta, A.1    Maranas, C.D.2
  • 6
    • 0042807253 scopus 로고    scopus 로고
    • Managing demand uncertainty in supply chain planning
    • Gupta A, Maranas CD, Managing demand uncertainty in supply chain planning. Comp and Chem Eng. 2003;27:1219-1227.
    • (2003) Comp and Chem Eng. , vol.27 , pp. 1219-1227
    • Gupta, A.1    Maranas, C.D.2
  • 7
    • 0034661221 scopus 로고    scopus 로고
    • A model predictive framework for planning and scheduling problems: A case study of consumer goods supply chain
    • Bose S, Pekny JF. A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain. Comp and Chem Eng. 2000;24:329-335.
    • (2000) Comp and Chem Eng. , vol.24 , pp. 329-335
    • Bose, S.1    Pekny, J.F.2
  • 8
    • 0034661653 scopus 로고    scopus 로고
    • Dynamical modeling and classical control theory for supply chain management
    • Perea-López E, Grossmann I, Ydstie E, Tahmassebi T. Dynamical modeling and classical control theory for supply chain management. Comp and Chem Eng. 2000;24:1143-1149.
    • (2000) Comp and Chem Eng. , vol.24 , pp. 1143-1149
    • Perea-López, E.1    Grossmann, I.2    Ydstie, E.3    Tahmassebi, T.4
  • 9
    • 1842850954 scopus 로고    scopus 로고
    • A two-layered optimisation-based control strategy for multi-echelon supply chain networks
    • Seferlis P, Giannelos N. A two-layered optimisation-based control strategy for multi-echelon supply chain networks. Comp and Chem Eng. 2004;28:799-809.
    • (2004) Comp and Chem Eng. , vol.28 , pp. 799-809
    • Seferlis, P.1    Giannelos, N.2
  • 10
    • 0037114378 scopus 로고    scopus 로고
    • Agent-based supply chain management-1: Framework
    • Julka N, Karimi I, Srinivasan R. Agent-based Supply Chain Management-1: Framework. Comp and Chem Eng. 2002;26:1755-1769.
    • (2002) Comp and Chem Eng. , vol.26 , pp. 1755-1769
    • Julka, N.1    Karimi, I.2    Srinivasan, R.3
  • 12
    • 9644275500 scopus 로고    scopus 로고
    • A comparison of optimal control and stochastic programming from a formulation and computation perspective
    • Cheng L, Subrahmanian E, Westerberg AW. A comparison of optimal control and stochastic programming from a formulation and computation perspective. Comp and Chem Eng. 2004;29:149-164.
    • (2004) Comp and Chem Eng. , vol.29 , pp. 149-164
    • Cheng, L.1    Subrahmanian, E.2    Westerberg, A.W.3
  • 13
    • 0031996476 scopus 로고    scopus 로고
    • A bilevel decomposition algorithm for long-range planning of process networks
    • Iyer RR, Grossmann IE. A bilevel decomposition algorithm for long-range planning of process networks. Ind and Eng Chem Res. 1998;37:474-481.
    • (1998) Ind and Eng Chem Res. , vol.37 , pp. 474-481
    • Iyer, R.R.1    Grossmann, I.E.2
  • 14
    • 0035827855 scopus 로고    scopus 로고
    • Design of multi-echelon supply chain networks under demand uncertainty
    • Tsiakis P, Shah N, Pantelides CC. Design of multi-echelon supply chain networks under demand uncertainty. Ind and Eng Chem Res. 2001;40:3585-3604.
    • (2001) Ind and Eng Chem Res. , vol.40 , pp. 3585-3604
    • Tsiakis, P.1    Shah, N.2    Pantelides, C.C.3
  • 15
    • 1642498232 scopus 로고    scopus 로고
    • Risk management in scheduling of batch plants under uncertain market demand
    • Bonfill A, Bagajewicz M, Espuña A, Puigjaner L. Risk management in scheduling of batch plants under uncertain market demand. Ind and Eng Chem Res. 2004;43:741-750.
    • (2004) Ind and Eng Chem Res. , vol.43 , pp. 741-750
    • Bonfill, A.1    Bagajewicz, M.2    Espuña, A.3    Puigjaner, L.4
  • 16
    • 14344251891 scopus 로고    scopus 로고
    • Addressing robustness in scheduling batch processes with uncertain operation times
    • Bonfill A, Espuña A, Puigjaner L. Addressing robustness in scheduling batch processes with uncertain operation times. Ind and Eng Chem Res. 2005;44:1524-1534.
    • (2005) Ind and Eng Chem Res. , vol.44 , pp. 1524-1534
    • Bonfill, A.1    Espuña, A.2    Puigjaner, L.3
  • 17
    • 12844284506 scopus 로고    scopus 로고
    • Management of pricing policies and financial risk as a key element for short term scheduling optimization
    • Guillén G, Bagajewicz M, Sequeira SE, Espuña A, Puigjaner L. Management of pricing policies and financial risk as a key element for short term scheduling optimization. Ind and Eng Chem Res. 2005;44:557-575.
    • (2005) Ind and Eng Chem Res. , vol.44 , pp. 557-575
    • Guillén, G.1    Bagajewicz, M.2    Sequeira, S.E.3    Espuña, A.4    Puigjaner, L.5
  • 18
    • 27144443349 scopus 로고    scopus 로고
    • Optimal offer proposal policy in an integrated supply chain management environment
    • Guillén G, Pina C, Espuña A, Puigjaner L. Optimal offer proposal policy in an integrated supply chain management environment. Ind and Eng Chem Res. 2005;44:7405-7419.
    • (2005) Ind and Eng Chem Res. , vol.44 , pp. 7405-7419
    • Guillén, G.1    Pina, C.2    Espuña, A.3    Puigjaner, L.4
  • 20
    • 0025435060 scopus 로고
    • Multiple objectives and nonseparability in stochastic dynamic programming
    • Sahinidis NV. Multiple objectives and nonseparability in stochastic dynamic programming. Intl J of Systems Sci. 1990;21(5):933-950.
    • (1990) Intl J of Systems Sci. , vol.21 , Issue.5 , pp. 933-950
    • Sahinidis, N.V.1
  • 21
    • 0038286484 scopus 로고    scopus 로고
    • Design and planning under uncertainty: Issues on problem formulations and solutions
    • Cheng L, Subrahmanian E, Westerberg AW. Design and planning under uncertainty: Issues on problem formulations and solutions. Comp and Chem Eng. 2003;27:781-801.
    • (2003) Comp and Chem Eng. , vol.27 , pp. 781-801
    • Cheng, L.1    Subrahmanian, E.2    Westerberg, A.W.3
  • 22
    • 0035342052 scopus 로고    scopus 로고
    • Fuzzy programming and profit and cost allocation for a production and transportation problem
    • Sakawa M, Nishizaki I, Uemura Y. Fuzzy programming and profit and cost allocation for a production and transportation problem. Euro J of Operational Res. 2001;131:1-15.
    • (2001) Euro J of Operational Res. , vol.131 , pp. 1-15
    • Sakawa, M.1    Nishizaki, I.2    Uemura, Y.3
  • 23
    • 0037445865 scopus 로고    scopus 로고
    • Scheduling optimization under uncertainty-an alternative approach
    • Balasubramanian J, Grossmann IE. Scheduling optimization under uncertainty-an alternative approach. Comp and Chem Eng. 2003;27:469-490.
    • (2003) Comp and Chem Eng. , vol.27 , pp. 469-490
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 24
    • 33750570638 scopus 로고    scopus 로고
    • The balanced allocation of customers to multiple distribution centers in the supply chain
    • Shah N. The balanced allocation of customers to multiple distribution centers in the supply chain. Comp and Chem Eng. 1998:43:251-261.
    • (1998) Comp and Chem Eng. , vol.43 , pp. 251-261
    • Shah, N.1
  • 25
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semi continuous processes. 2. Short-term scheduling
    • Karimi I, McDonald CM. Planning and scheduling of parallel semi continuous processes. 2. Short-term scheduling Ind and Eng Chem Res. 1997;36:2701-2714.
    • (1997) Ind and Eng Chem Res. , vol.36 , pp. 2701-2714
    • Karimi, I.1    McDonald, C.M.2
  • 26
    • 1942436305 scopus 로고    scopus 로고
    • A general modeling framework for the operational planning of petroleum supply chains
    • Neiro SMS, Pinto JM. A general modeling framework for the operational planning of petroleum supply chains. Comp and Chem Eng. 2004;28:871-896.
    • (2004) Comp and Chem Eng. , vol.28 , pp. 871-896
    • Neiro, S.M.S.1    Pinto, J.M.2
  • 29
    • 0000875252 scopus 로고
    • The design of multiproduct batch plants under uncertainty with staged expansion
    • Wellons HS, Reklaitis GV. The design of multiproduct batch plants under uncertainty with staged expansion. Comp and Chem Eng. 1989;13:115.
    • (1989) Comp and Chem Eng. , vol.13 , pp. 115
    • Wellons, H.S.1    Reklaitis, G.V.2
  • 31
    • 0037019668 scopus 로고    scopus 로고
    • Optimal design of batch plants with uncertain demands considering switch over of operating modes of parallel units
    • Cao D-M, Yuan X-G. Optimal design of batch plants with uncertain demands considering switch over of operating modes of parallel units. Ind and Eng Chem Res. 2002;41:4616.
    • (2002) Ind and Eng Chem Res. , vol.41 , pp. 4616
    • Cao, D.-M.1    Yuan, X.-G.2
  • 32
    • 0031271861 scopus 로고    scopus 로고
    • Multiperiod planning and scheduling of multipurpose batch plants under demand uncertainty
    • Petkov SB, Maranas CD. Multiperiod planning and scheduling of multipurpose batch plants under demand uncertainty. Ind and Eng Chem Res. 1997;36:4864-4881.
    • (1997) Ind and Eng Chem Res. , vol.36 , pp. 4864-4881
    • Petkov, S.B.1    Maranas, C.D.2
  • 33
    • 0035925377 scopus 로고    scopus 로고
    • A General treatment of uncertainties in batch process planning
    • Lee YG, Malone MFA. A General treatment of uncertainties in batch process planning. Ind and Eng Chem Res. 2001;40:1507-1515.
    • (2001) Ind and Eng Chem Res. , vol.40 , pp. 1507-1515
    • Lee, Y.G.1    Malone, M.F.A.2
  • 34
    • 0035904351 scopus 로고    scopus 로고
    • Robust short-term scheduling of multiproduct batch plants under demand uncertainty
    • Vin JP, Ierapetritou M. G. Robust short-term scheduling of multiproduct batch plants under demand uncertainty. Ind and Eng Chem Res. 2001;40:4543-4554.
    • (2001) Ind and Eng Chem Res. , vol.40 , pp. 4543-4554
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 35
    • 0027545176 scopus 로고
    • A general algorithm for short term scheduling of batch operations
    • Kondili E, Pantelides CC, Sargent RW. A general algorithm for short term scheduling of batch operations. Comp and Chem Eng. 1993;17:211-227.
    • (1993) Comp and Chem Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.3
  • 37
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Part 1. Multipurpose batch processes
    • Ierapetritou MG, Floudas CA. Effective continuous-time formulation for short-term scheduling. Part 1. Multipurpose batch processes. Ind and Eng Chem Res. 1998;37:4341-4359.
    • (1998) Ind and Eng Chem Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 38
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Part 2. Continuous and semicontinuous processes
    • Ierapetritou MG, Floudas CA. Effective continuous-time formulation for short-term scheduling. Part 2. Continuous and semicontinuous processes. Ind and Eng Chem Res. 1998;37:4360-4374.
    • (1998) Ind and Eng Chem Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 39
    • 0027545175 scopus 로고
    • A general algorithms for short-term scheduling of batch operations-2. Computational issues
    • Shah N, Pantelides CC, Sargent RWH. A general algorithms for short-term scheduling of batch operations-2. Computational issues. Comp and Chem Eng. 1993;17:229-244.
    • (1993) Comp and Chem Eng. , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 40
    • 0015973449 scopus 로고
    • Multicommodity distribution system design by benders decomposition
    • Geoffrion AM, Graves GW. Multicommodity distribution system design by benders decomposition. Management Sci. 1974;20:822-844.
    • (1974) Management Sci. , vol.20 , pp. 822-844
    • Geoffrion, A.M.1    Graves, G.W.2
  • 41
    • 3042702298 scopus 로고    scopus 로고
    • Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
    • Balasubramanian J, Grossmann IE. Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Ind and Eng Chem Res. 2004;43:3695-3713.
    • (2004) Ind and Eng Chem Res. , vol.43 , pp. 3695-3713
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 42
    • 0020291533 scopus 로고
    • Review of scheduling of process operations
    • Reklaitis GV. Review of scheduling of process operations. AIChE Symposium Series. 1982;78(214):119-133.
    • (1982) AIChE Symposium Series , vol.78 , Issue.214 , pp. 119-133
    • Reklaitis, G.V.1
  • 43
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C, Grossmann IE. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind and Eng Chem Res. 2003;42:3056-3074.
    • (2003) Ind and Eng Chem Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.1    Grossmann, I.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.