메뉴 건너뛰기




Volumn 44, Issue 19, 2005, Pages 7405-7419

Optimal offer proposal policy in an integrated supply chain management environment

Author keywords

[No Author keywords available]

Indexed keywords

CHEMICAL INDUSTRY; CONTRACTS; COSTS; CUSTOMER SATISFACTION; STRATEGIC PLANNING;

EID: 27144443349     PISSN: 08885885     EISSN: None     Source Type: Journal    
DOI: 10.1021/ie0493208     Document Type: Article
Times cited : (19)

References (28)
  • 1
    • 0034307297 scopus 로고    scopus 로고
    • Risk and uncertainty in managing manufacturing supply chains
    • Applequist, G. E.; Pekny, J. F.; Reklaitis, G. V. Risk and Uncertainty in Managing Manufacturing Supply Chains. Comput. Chem. Eng. 2000, 24, 2211.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2211
    • Applequist, G.E.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 5
    • 0037473536 scopus 로고    scopus 로고
    • Multiobjective optimization for a multienterprise supply chain network
    • Chen, C.; Wang, B.; Lee, W. Multiobjective Optimization for a Multienterprise Supply Chain Network. Ind. Eng. Chem. Res. 2003, 42, 1879-1889.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 1879-1889
    • Chen, C.1    Wang, B.2    Lee, W.3
  • 6
    • 0035166107 scopus 로고    scopus 로고
    • Strategic supply chain optimization for the pharmaceutical industries
    • Papageorgious, L. G.; Rotstein, G. E.; Shah, N. Strategic supply chain optimization for the pharmaceutical industries. Ind. Eng. Chem. Res. 2001, 40, 275-286.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 275-286
    • Papageorgious, L.G.1    Rotstein, G.E.2    Shah, N.3
  • 7
    • 0034675403 scopus 로고    scopus 로고
    • Optimal planning in large multisite production networks
    • Timpe, C. H.; Kallrath, J. Optimal planning in large multisite production networks. Eur. J. Oper. Res. 2000, 126, 422-435.
    • (2000) Eur. J. Oper. Res. , vol.126 , pp. 422-435
    • Timpe, C.H.1    Kallrath, J.2
  • 8
    • 0035827855 scopus 로고    scopus 로고
    • Design of multi-echelon supply chain networks under demand uncertainty
    • Tsiakis, P.; Shah, N.; Pantelides, C. C. Design of Multi-echelon Supply Chain Networks under Demand Uncertainty. Ind. Eng. Chem. Res. 2001, 40, 3585-3604.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 3585-3604
    • Tsiakis, P.1    Shah, N.2    Pantelides, C.C.3
  • 9
    • 0037445865 scopus 로고    scopus 로고
    • Scheduling optimization under uncertainty: An alternative approach
    • Balasubramanian, J.; Grossmann, I. E. Scheduling Optimization under Uncertainty: An Alternative Approach. Comput. Chem. Eng. 2003, 27, 469-490.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 469-490
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 11
    • 12844284506 scopus 로고    scopus 로고
    • Management of pricing policies and financial risk as a key element for short-term scheduling optimization
    • Guillén, G.; Bagajewicz, M.; Sequeira, S. E.; Espuña, A.; Puigjaner, L. Management of pricing policies and financial risk as a key element for short-term scheduling optimization. Ind. Eng. Chem. Res. 2005, 44 (3), 557-575.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , Issue.3 , pp. 557-575
    • Guillén, G.1    Bagajewicz, M.2    Sequeira, S.E.3    Espuña, A.4    Puigjaner, L.5
  • 12
    • 1642498232 scopus 로고    scopus 로고
    • Risk management in scheduling of batch plants under uncertain market demand
    • Bonfill, A.; Bagajewicz, M.; Espuña, A.; Puigjaner, L. Risk Management in Scheduling of Batch Plants under Uncertain Market Demand. Ind. Eng. Chem. Res. 2004, 43, 741-750.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 741-750
    • Bonfill, A.1    Bagajewicz, M.2    Espuña, A.3    Puigjaner, L.4
  • 13
    • 14344251891 scopus 로고    scopus 로고
    • Addressing robustness in scheduling batch processes with uncertain operation times
    • Bonfill, A.; Espuña, A.; Puigjaner, L. Addressing Robustness in Scheduling Batch Processes with Uncertain Operation Times. Ind. Eng. Chem. Res. 2005, 44, 1524-1534.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 1524-1534
    • Bonfill, A.1    Espuña, A.2    Puigjaner, L.3
  • 14
    • 0034306197 scopus 로고    scopus 로고
    • A two-stage modelling and solution framework for multisite midterm planning under demand uncertainty
    • Gupta, A.; Maranas, C. D. A two-stage modelling and solution framework for multisite midterm planning under demand uncertainty. Ind. Eng. Chem. Res. 2000, 39, 3799-3813.
    • (2000) Ind. Eng. Chem. Res. , vol.39 , pp. 3799-3813
    • Gupta, A.1    Maranas, C.D.2
  • 15
    • 0042807253 scopus 로고    scopus 로고
    • Managing demand uncertainty in supply chain planning
    • Gupta, A.; Maranas, C. D. Managing demand uncertainty in supply chain planning. Comput. Chem. Eng. 2003, 27, 1219-1227.
    • (2003) Comput. Chem. Eng. , vol.27 , pp. 1219-1227
    • Gupta, A.1    Maranas, C.D.2
  • 17
  • 18
    • 0742319162 scopus 로고    scopus 로고
    • The procurement of strategic parts. Analysis of a portfolio of contracts with suppliers using a system dynamics simulation model
    • Crespo, A.; Blanchar, C. The procurement of strategic parts. Analysis of a portfolio of contracts with suppliers using a system dynamics simulation model. International Journal of Production Economics 2004, 88 (1), 29-49.
    • (2004) International Journal of Production Economics , vol.88 , Issue.1 , pp. 29-49
    • Crespo, A.1    Blanchar, C.2
  • 21
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling, G.; Pantelides, C. C. A Simple Continuous-Time Process Scheduling Formulation and a Novel Solution Algorithm. Comput. Chem. Eng. 1996, 20, S1221-S1226.
    • (1996) Comput. Chem. Eng. , vol.20
    • Schilling, G.1    Pantelides, C.C.2
  • 22
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities: General formulation and some approaches for the solution
    • Zhang, X.; Sargent, R. W. H. The Optimal Operation of Mixed Production Facilities: General Formulation and Some Approaches for the Solution. Comput. Chem. Eng. 1996, 20, 897-904.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 897-904
    • Zhang, X.1    Sargent, R.W.H.2
  • 23
    • 0032997426 scopus 로고    scopus 로고
    • Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
    • Mockus, L.; Reklaitis, G. V. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. MINLP Formulation. Ind. Eng. Chem. Res. 1999, 38, 197-203.
    • (1999) Ind. Eng. Chem. Res. , vol.38 , pp. 197-203
    • Mockus, L.1    Reklaitis, G.V.2
  • 25
    • 0035804558 scopus 로고    scopus 로고
    • Transfer prices for multienterprise supply chain optimization
    • Gjerdrum, A.; Shah, N.; Papageorgiou, L. G. Transfer Prices for Multienterprise Supply Chain Optimization. Ind. Eng. Chem. Res. 2001, 40, 1650-1660.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 1650-1660
    • Gjerdrum, A.1    Shah, N.2    Papageorgiou, L.G.3
  • 26
    • 0015094608 scopus 로고
    • On a bicriterion formulation of the problems of integrated system identification and system optimization
    • Haimes, Y. Y.; Lasdon, L. S.; Wismer, D. A. On a bicriterion formulation of the problems of integrated system identification and system optimization. IEEE Transactions on Systems, Man and Cybernetics 1971, 1, 296-297.
    • (1971) IEEE Transactions on Systems, Man and Cybernetics , vol.1 , pp. 296-297
    • Haimes, Y.Y.1    Lasdon, L.S.2    Wismer, D.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.