메뉴 건너뛰기




Volumn 17, Issue 6, 1997, Pages 592-610

A linear programming model for integrated steel production and distribution planning

Author keywords

Integrated manufacturing systems; Linear programming; Models; Steel industry

Indexed keywords


EID: 3543146083     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579710167276     Document Type: Review
Times cited : (73)

References (12)
  • 2
    • 0022752733 scopus 로고
    • A computer-based strategic planning system for steel production
    • Bielefeld, F.W., Walter, K.D. and Wartmann, R. (1986, "A computer-based strategic planning system for steel production", Interfaces, Vol. 16, pp. 41-6.
    • (1986) Interfaces , vol.16 , pp. 41-6
    • Bielefeld, F.W.1    Walter, K.D.2    Wartmann, R.3
  • 4
    • 0026398424 scopus 로고
    • Strategic integrated manufacturing systems: The concept and structures
    • Hitomi, K. (1991, "Strategic integrated manufacturing systems: the concept and structures", International Journal of Production Economics, Vol. 25, pp. 5-12.
    • (1991) International Journal of Production Economics , vol.25 , pp. 5-12
    • Hitomi, K.1
  • 6
    • 0024640574 scopus 로고
    • Hierarchical production planning for a modern steel manufacturing system
    • Lin, C.W. and Moodie, C.L. (1989, "Hierarchical production planning for a modern steel manufacturing system", International Journal of Production Research, Vol. 27, pp. 613-28.
    • (1989) International Journal of Production Research , vol.27 , pp. 613-28
    • Lin, C.W.1    Moodie, C.L.2
  • 7
    • 21144476120 scopus 로고
    • Integrated production , distribution, and inventory planning at Libbey-Owens-Ford
    • Martin, C.H., Dent, C. and Eckhart, J.C. (1993, "Integrated production, distribution, and inventory planning at Libbey-Owens-Ford", Interfaces, Vol. 23, pp. 68-78.
    • (1993) Interfaces , vol.23 , pp. 68-78
    • Martin, C.H.1    Dent, C.2    Eckhart, J.C.3
  • 10
    • 0026375970 scopus 로고
    • A multiple arc network model of production planning in a steel mill
    • Sasidhar, B. and Achary, K.K. (1991, "A multiple arc network model of production planning in a steel mill", International Journal of Production Economics, Vol. 22, pp. 195-202.
    • (1991) International Journal of Production Economics , vol.22 , pp. 195-202
    • Sasidhar, B.1    Achary, K.K.2
  • 12


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.