-
1
-
-
0001167750
-
Reengineering work: don't automate, obliterate
-
Hammer M. Reengineering work: don't automate, obliterate. Harvard Bus. Rev. (1990) 104-112
-
(1990)
Harvard Bus. Rev.
, pp. 104-112
-
-
Hammer, M.1
-
3
-
-
0017943813
-
Graphical coordination of plant usage and personnel
-
Patricio G.C., and Alfred H.W. Graphical coordination of plant usage and personnel. J. Constr. Div. 104 1 (1978) 43-55
-
(1978)
J. Constr. Div.
, vol.104
, Issue.1
, pp. 43-55
-
-
Patricio, G.C.1
Alfred, H.W.2
-
4
-
-
0016495412
-
Engineering Scheduling with Manpower Allocation
-
Jerome Jr. P.M. Engineering Scheduling with Manpower Allocation. J. Prof. Act. 101 2 (1975) 107-115
-
(1975)
J. Prof. Act.
, vol.101
, Issue.2
, pp. 107-115
-
-
Jerome Jr., P.M.1
-
5
-
-
0031144759
-
Strategic planning for human resource management in construction
-
William F.M. Strategic planning for human resource management in construction. J. Manage. Eng. 13 3 (1997) 49-56
-
(1997)
J. Manage. Eng.
, vol.13
, Issue.3
, pp. 49-56
-
-
William, F.M.1
-
6
-
-
0025682920
-
Probabilistic simulation studies for repetitive construction processes
-
AbouRizk S.M., and Halpin D.W. Probabilistic simulation studies for repetitive construction processes. J. Constr. Eng. Manag. 116 4 (1990) 575-594
-
(1990)
J. Constr. Eng. Manag.
, vol.116
, Issue.4
, pp. 575-594
-
-
AbouRizk, S.M.1
Halpin, D.W.2
-
7
-
-
33748338830
-
-
D.W. Halpin, An Investigation of the Use of Simulation Networks for Modeling Construction Operations, PhD Thesis, Univ. of Illinois at Urbana-Champaign Ill., 1973.
-
-
-
-
8
-
-
0017539255
-
CYCLONE: method for modeling of job site processes
-
Halpin D.W. CYCLONE: method for modeling of job site processes. J. Constr. Div., ASCE 103 3 (1977) 489-499
-
(1977)
J. Constr. Div., ASCE
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
10
-
-
13944263262
-
Simulation as a tool for pile productivity assessment
-
Zayed T.M., and Halpin D.W. Simulation as a tool for pile productivity assessment. J. Constr. Eng. Manag., ASCE 130 3 (2004) 384-404
-
(2004)
J. Constr. Eng. Manag., ASCE
, vol.130
, Issue.3
, pp. 384-404
-
-
Zayed, T.M.1
Halpin, D.W.2
-
11
-
-
0003119697
-
Resource-based modeling for construction simulation
-
Shi J., and AbouRizk S.M. Resource-based modeling for construction simulation. J. Constr. Eng. Manag., ASCE 123 1 (1997) 26-33
-
(1997)
J. Constr. Eng. Manag., ASCE
, vol.123
, Issue.1
, pp. 26-33
-
-
Shi, J.1
AbouRizk, S.M.2
-
12
-
-
0037340023
-
Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
-
Salem1 O., AbouRizk S., and Ariaratnam S. Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives. J. Infrastruct. Syst. 9 1 (2003) 6-15
-
(2003)
J. Infrastruct. Syst.
, vol.9
, Issue.1
, pp. 6-15
-
-
Salem, O.1
AbouRizk, S.2
Ariaratnam, S.3
-
13
-
-
0000834220
-
Simulation of nonsteady construction processes
-
Bernold L.E. Simulation of nonsteady construction processes. J. Constr. Eng. Manag. 115 2 (1989) 163-178
-
(1989)
J. Constr. Eng. Manag.
, vol.115
, Issue.2
, pp. 163-178
-
-
Bernold, L.E.1
-
14
-
-
0002324953
-
Simplified simulation system for construction projects
-
Senior B.A., and Halpin D.W. Simplified simulation system for construction projects. J. Constr. Eng. Manag., ASCE 124 1 (1998) 72-81
-
(1998)
J. Constr. Eng. Manag., ASCE
, vol.124
, Issue.1
, pp. 72-81
-
-
Senior, B.A.1
Halpin, D.W.2
-
15
-
-
0029228037
-
Computational organization analysis for designing concurrent engineering teams
-
Yan J., and Levitt R.E. Computational organization analysis for designing concurrent engineering teams. Proceedings of the Computing in Civil Engineering (1995) 1090-1097
-
(1995)
Proceedings of the Computing in Civil Engineering
, pp. 1090-1097
-
-
Yan, J.1
Levitt, R.E.2
-
17
-
-
13944255067
-
Reengineering of construction management process
-
Cheng M.Y., and Tsai M.H. Reengineering of construction management process. J. Constr. Eng. Manag. 129 1 (2003) 105-114
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.1
, pp. 105-114
-
-
Cheng, M.Y.1
Tsai, M.H.2
-
18
-
-
0003816118
-
-
Harvard Business School Press, Boston MA
-
Davenport T.H. Process Innovation (1993), Harvard Business School Press, Boston MA
-
(1993)
Process Innovation
-
-
Davenport, T.H.1
-
19
-
-
0346943650
-
Business process redesign: a framework for harmonizing people, information and technology
-
Grover V., and Keltinger W.J. (Eds), IDEA Group Publishing
-
Marchland D.A., and Stanford M.J. Business process redesign: a framework for harmonizing people, information and technology. In: Grover V., and Keltinger W.J. (Eds). Business Process Change: Reengineering Concepts, Methods and Technologies (1995), IDEA Group Publishing 35-56
-
(1995)
Business Process Change: Reengineering Concepts, Methods and Technologies
, pp. 35-56
-
-
Marchland, D.A.1
Stanford, M.J.2
-
20
-
-
13944265027
-
Optimal project organizational structure for construction management
-
Cheng M.Y., Su C.W., and You H.Y. Optimal project organizational structure for construction management. J. Constr. Eng. Manag. 129 1 (2003) 70-79
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.1
, pp. 70-79
-
-
Cheng, M.Y.1
Su, C.W.2
You, H.Y.3
|