메뉴 건너뛰기




Volumn 15, Issue 6, 2006, Pages 785-799

Construction management process reengineering: Organizational human resource planning for multiple projects

Author keywords

Construction management process reengineering; Human resource planning; Simulation; Team based organization

Indexed keywords

COMPUTER SIMULATION; DATA PROCESSING; PERSONNEL; PROJECT MANAGEMENT; STRATEGIC PLANNING; STRUCTURAL DESIGN;

EID: 33748337524     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2005.10.014     Document Type: Article
Times cited : (31)

References (21)
  • 1
    • 0001167750 scopus 로고
    • Reengineering work: don't automate, obliterate
    • Hammer M. Reengineering work: don't automate, obliterate. Harvard Bus. Rev. (1990) 104-112
    • (1990) Harvard Bus. Rev. , pp. 104-112
    • Hammer, M.1
  • 3
    • 0017943813 scopus 로고
    • Graphical coordination of plant usage and personnel
    • Patricio G.C., and Alfred H.W. Graphical coordination of plant usage and personnel. J. Constr. Div. 104 1 (1978) 43-55
    • (1978) J. Constr. Div. , vol.104 , Issue.1 , pp. 43-55
    • Patricio, G.C.1    Alfred, H.W.2
  • 4
    • 0016495412 scopus 로고
    • Engineering Scheduling with Manpower Allocation
    • Jerome Jr. P.M. Engineering Scheduling with Manpower Allocation. J. Prof. Act. 101 2 (1975) 107-115
    • (1975) J. Prof. Act. , vol.101 , Issue.2 , pp. 107-115
    • Jerome Jr., P.M.1
  • 5
    • 0031144759 scopus 로고    scopus 로고
    • Strategic planning for human resource management in construction
    • William F.M. Strategic planning for human resource management in construction. J. Manage. Eng. 13 3 (1997) 49-56
    • (1997) J. Manage. Eng. , vol.13 , Issue.3 , pp. 49-56
    • William, F.M.1
  • 6
    • 0025682920 scopus 로고
    • Probabilistic simulation studies for repetitive construction processes
    • AbouRizk S.M., and Halpin D.W. Probabilistic simulation studies for repetitive construction processes. J. Constr. Eng. Manag. 116 4 (1990) 575-594
    • (1990) J. Constr. Eng. Manag. , vol.116 , Issue.4 , pp. 575-594
    • AbouRizk, S.M.1    Halpin, D.W.2
  • 7
    • 33748338830 scopus 로고    scopus 로고
    • D.W. Halpin, An Investigation of the Use of Simulation Networks for Modeling Construction Operations, PhD Thesis, Univ. of Illinois at Urbana-Champaign Ill., 1973.
  • 8
    • 0017539255 scopus 로고
    • CYCLONE: method for modeling of job site processes
    • Halpin D.W. CYCLONE: method for modeling of job site processes. J. Constr. Div., ASCE 103 3 (1977) 489-499
    • (1977) J. Constr. Div., ASCE , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 10
    • 13944263262 scopus 로고    scopus 로고
    • Simulation as a tool for pile productivity assessment
    • Zayed T.M., and Halpin D.W. Simulation as a tool for pile productivity assessment. J. Constr. Eng. Manag., ASCE 130 3 (2004) 384-404
    • (2004) J. Constr. Eng. Manag., ASCE , vol.130 , Issue.3 , pp. 384-404
    • Zayed, T.M.1    Halpin, D.W.2
  • 11
    • 0003119697 scopus 로고    scopus 로고
    • Resource-based modeling for construction simulation
    • Shi J., and AbouRizk S.M. Resource-based modeling for construction simulation. J. Constr. Eng. Manag., ASCE 123 1 (1997) 26-33
    • (1997) J. Constr. Eng. Manag., ASCE , vol.123 , Issue.1 , pp. 26-33
    • Shi, J.1    AbouRizk, S.M.2
  • 12
    • 0037340023 scopus 로고    scopus 로고
    • Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
    • Salem1 O., AbouRizk S., and Ariaratnam S. Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives. J. Infrastruct. Syst. 9 1 (2003) 6-15
    • (2003) J. Infrastruct. Syst. , vol.9 , Issue.1 , pp. 6-15
    • Salem, O.1    AbouRizk, S.2    Ariaratnam, S.3
  • 13
    • 0000834220 scopus 로고
    • Simulation of nonsteady construction processes
    • Bernold L.E. Simulation of nonsteady construction processes. J. Constr. Eng. Manag. 115 2 (1989) 163-178
    • (1989) J. Constr. Eng. Manag. , vol.115 , Issue.2 , pp. 163-178
    • Bernold, L.E.1
  • 14
    • 0002324953 scopus 로고    scopus 로고
    • Simplified simulation system for construction projects
    • Senior B.A., and Halpin D.W. Simplified simulation system for construction projects. J. Constr. Eng. Manag., ASCE 124 1 (1998) 72-81
    • (1998) J. Constr. Eng. Manag., ASCE , vol.124 , Issue.1 , pp. 72-81
    • Senior, B.A.1    Halpin, D.W.2
  • 15
    • 0029228037 scopus 로고
    • Computational organization analysis for designing concurrent engineering teams
    • Yan J., and Levitt R.E. Computational organization analysis for designing concurrent engineering teams. Proceedings of the Computing in Civil Engineering (1995) 1090-1097
    • (1995) Proceedings of the Computing in Civil Engineering , pp. 1090-1097
    • Yan, J.1    Levitt, R.E.2
  • 16
  • 17
    • 13944255067 scopus 로고    scopus 로고
    • Reengineering of construction management process
    • Cheng M.Y., and Tsai M.H. Reengineering of construction management process. J. Constr. Eng. Manag. 129 1 (2003) 105-114
    • (2003) J. Constr. Eng. Manag. , vol.129 , Issue.1 , pp. 105-114
    • Cheng, M.Y.1    Tsai, M.H.2
  • 18
    • 0003816118 scopus 로고
    • Harvard Business School Press, Boston MA
    • Davenport T.H. Process Innovation (1993), Harvard Business School Press, Boston MA
    • (1993) Process Innovation
    • Davenport, T.H.1
  • 19
    • 0346943650 scopus 로고
    • Business process redesign: a framework for harmonizing people, information and technology
    • Grover V., and Keltinger W.J. (Eds), IDEA Group Publishing
    • Marchland D.A., and Stanford M.J. Business process redesign: a framework for harmonizing people, information and technology. In: Grover V., and Keltinger W.J. (Eds). Business Process Change: Reengineering Concepts, Methods and Technologies (1995), IDEA Group Publishing 35-56
    • (1995) Business Process Change: Reengineering Concepts, Methods and Technologies , pp. 35-56
    • Marchland, D.A.1    Stanford, M.J.2
  • 20
    • 13944265027 scopus 로고    scopus 로고
    • Optimal project organizational structure for construction management
    • Cheng M.Y., Su C.W., and You H.Y. Optimal project organizational structure for construction management. J. Constr. Eng. Manag. 129 1 (2003) 70-79
    • (2003) J. Constr. Eng. Manag. , vol.129 , Issue.1 , pp. 70-79
    • Cheng, M.Y.1    Su, C.W.2    You, H.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.