메뉴 건너뛰기




Volumn 129, Issue 1, 2003, Pages 105-114

Reengineering of construction management process

Author keywords

Construction management; Management methods

Indexed keywords

BUDGET CONTROL; COMPUTER AIDED ENGINEERING; INFORMATION TECHNOLOGY; MANAGEMENT SCIENCE; PROCESS ENGINEERING; REENGINEERING; STRATEGIC PLANNING;

EID: 13944255067     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:1(105)     Document Type: Article
Times cited : (29)

References (11)
  • 1
    • 1842439958 scopus 로고
    • Modeling pre-project planning for the construction of capital facilities
    • Univ. of Texas at Austin
    • Construction Industry Institute. (1993). "Modeling pre-project planning for the construction of capital facilities." Source Document 94, Univ. of Texas at Austin.
    • (1993) Source Document , vol.94
  • 2
    • 0002481047 scopus 로고
    • The new industrial engineering: Information technology and business process redesign
    • Davenport, T. H., and Short, J. E. (1990). "The new industrial engineering: Information technology and business process redesign." Sloan Manage. Rev., 11-27.
    • (1990) Sloan Manage. Rev. , pp. 11-27
    • Davenport, T.H.1    Short, J.E.2
  • 3
    • 0002273296 scopus 로고
    • A practical guide for implementing reengineering
    • Farrell, J. (1994). "A practical guide for implementing reengineering." Planning Review, 40-45.
    • (1994) Planning Review , pp. 40-45
    • Farrell, J.1
  • 4
    • 2442676566 scopus 로고
    • The right start for business reengineering
    • Freiser, T. J. (1992). "The right start for business reengineering." Information Strategy, 9(1), 26-30.
    • (1992) Information Strategy , vol.9 , Issue.1 , pp. 26-30
    • Freiser, T.J.1
  • 5
    • 0003022068 scopus 로고
    • A six-step guide to process reengineering
    • Furey, T. R. (1993). "A six-step guide to process reengineering." Planning Review, 20-23.
    • (1993) Planning Review , pp. 20-23
    • Furey, T.R.1
  • 6
    • 0001167750 scopus 로고
    • Reengineering work: Don't automate, obliterate
    • Hammer, M. (1990). "Reengineering work: Don't automate, obliterate." Harvard Business Review, 104-112.
    • (1990) Harvard Business Review , pp. 104-112
    • Hammer, M.1
  • 9
    • 0001784102 scopus 로고
    • A methodology for reengineering business
    • Harrison, D. B., and Pratt, M. D. (1993). "A methodology for reengineering business." Planning Review, 6-10.
    • (1993) Planning Review , pp. 6-10
    • Harrison, D.B.1    Pratt, M.D.2
  • 11
    • 13944252157 scopus 로고
    • The few, the true, the blue
    • Sager, I. (1994). "The few, the true, the blue." Bus. Week, 124-126.
    • (1994) Bus. Week , pp. 124-126
    • Sager, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.