-
3
-
-
0001719102
-
Incorporating scheduling in the optimal design of multiproduct batch plants
-
D.B. Birewar and I.E. Grossmann, Incorporating scheduling in the optimal design of multiproduct batch plants, Computers Chem. Eng. 13(1989)141-161.
-
(1989)
Computers Chem. Eng.
, vol.13
, pp. 141-161
-
-
Birewar, D.B.1
Grossmann, I.E.2
-
4
-
-
0024731347
-
Efficient optimization algorithms for zero-wait scheduling of multiproduct plants
-
D.B. Birewar and I.E. Grossmann, Efficient optimization algorithms for zero-wait scheduling of multiproduct plants, I&EC Research 28(1989)1333-1345.
-
(1989)
I&EC Research
, vol.28
, pp. 1333-1345
-
-
Birewar, D.B.1
Grossmann, I.E.2
-
5
-
-
84872991285
-
A mixed-integer linear programming model for short term batch scheduling in parallel lines
-
Detroit, MI
-
J. Cerdá, G. Henning and I.E. Grossmann, A mixed-integer linear programming model for short term batch scheduling in parallel lines, presented at the ORSA/TIMS Meeting - Global Manufacturing in the 21st Century, Detroit, MI, 1994.
-
(1994)
ORSA/TIMS Meeting - Global Manufacturing in the 21st Century
-
-
Cerdá, J.1
Henning, G.2
Grossmann, I.E.3
-
8
-
-
0028517862
-
Enumerative approaches to parallel flowshop scheduling via problem transformation
-
W.B. Gooding, J.F. Pekny and P.S. McCroskey, Enumerative approaches to parallel flowshop scheduling via problem transformation, Computers Chem. Eng. 18(1994)909-927.
-
(1994)
Computers Chem. Eng.
, vol.18
, pp. 909-927
-
-
Gooding, W.B.1
Pekny, J.F.2
McCroskey, P.S.3
-
9
-
-
0011780681
-
Mixed integer optimization techniques for the design and scheduling of batch processes
-
eds. G.V. Reklaitis, A.K. Sunol, D.W.T. Rippin and O. Hortacsu, Springer, Berlin
-
I.E. Grossmann, J. Quesada, R. Raman and V. Voudouris, Mixed integer optimization techniques for the design and scheduling of batch processes, in: Batch Processing Systems Engineering, eds. G.V. Reklaitis, A.K. Sunol, D.W.T. Rippin and O. Hortacsu, Springer, Berlin, 1996, pp. 451-494.
-
(1996)
Batch Processing Systems Engineering
, pp. 451-494
-
-
Grossmann, I.E.1
Quesada, J.2
Raman, R.3
Voudouris, V.4
-
10
-
-
0016970708
-
Optimal flowshop schedules with no intermediate storage space
-
J.N.D. Gupta, Optimal flowshop schedules with no intermediate storage space, Nav. Res. Logist. Quart. 23(1976)235-243.
-
(1976)
Nav. Res. Logist. Quart.
, vol.23
, pp. 235-243
-
-
Gupta, J.N.D.1
-
11
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations. I. MILP formulation
-
E. Kondili, C.C. Pantelides and R.W.H. Sargent, A general algorithm for short-term scheduling of batch operations. I. MILP formulation, Computers Chem. Eng. 17(1993)211-227.
-
(1993)
Computers Chem. Eng.
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
13
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
eds. D.W.T. Rippin, J.C. Hale and J.F. Davis, CACHE, Austin, TX
-
C.C. Pantelides, Unified frameworks for optimal process planning and scheduling, in: Foundations of Computer Aided Process Operations, eds. D.W.T. Rippin, J.C. Hale and J.F. Davis, CACHE, Austin, TX, 1994, pp. 253-274.
-
(1994)
Foundations of Computer Aided Process Operations
, pp. 253-274
-
-
Pantelides, C.C.1
-
14
-
-
0026256602
-
Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
-
J.F. Pekny and D.L. Miller, Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods, Computers Chem. Eng. 15(1991)741-748.
-
(1991)
Computers Chem. Eng.
, vol.15
, pp. 741-748
-
-
Pekny, J.F.1
Miller, D.L.2
-
15
-
-
0002259729
-
Learning to solve process scheduling problems: The role of rigorous knowledge acquisition frameworks
-
eds. D.W.T. Rippin, J.C. Hale and J.F. Davis, CACHE, Austin, TX
-
J.F. Pekny and M.G. Zentner, Learning to solve process scheduling problems: The role of rigorous knowledge acquisition frameworks, in: Foundations of Computer Aided Process Operations, eds. D.W.T. Rippin, J.C. Hale and J.F. Davis, CACHE, Austin, TX, 1994, pp. 275-309.
-
(1994)
Foundations of Computer Aided Process Operations
, pp. 275-309
-
-
Pekny, J.F.1
Zentner, M.G.2
-
16
-
-
0028500039
-
Optimal cyclic scheduling of multistage continuous multiproduct plants
-
J.M. Pinto and I.E. Grossmann, Optimal cyclic scheduling of multistage continuous multiproduct plants, Computers Chem. Eng. 18(1994)797-816.
-
(1994)
Computers Chem. Eng.
, vol.18
, pp. 797-816
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
17
-
-
0001690679
-
A continuous time mixed-integer linear programming model for short term scheduling of multistage batch plants
-
J.M. Pinto and I.E. Grossmann, A continuous time mixed-integer linear programming model for short term scheduling of multistage batch plants, I&EC Research 34(1995)3037-3051.
-
(1995)
I&EC Research
, vol.34
, pp. 3037-3051
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
18
-
-
0002584921
-
An alternate MILP model for short term batch scheduling with pre-ordering constraints
-
J. Pinto and I.E. Grossmann, An alternate MILP model for short term batch scheduling with pre-ordering constraints, Ind. Eng. Chem. Research 35(1996)338-342.
-
(1996)
Ind. Eng. Chem. Research
, vol.35
, pp. 338-342
-
-
Pinto, J.1
Grossmann, I.E.2
-
21
-
-
33845375199
-
Scheduling and sequencing of batch operations in a multipurpose plant
-
S.H. Rich and G.J. Prokopakis, Scheduling and sequencing of batch operations in a multipurpose plant, Ind. Eng. Chem. Process Des. Dev. 25(1986)979-988.
-
(1986)
Ind. Eng. Chem. Process Des. Dev.
, vol.25
, pp. 979-988
-
-
Rich, S.H.1
Prokopakis, G.J.2
-
22
-
-
0027676062
-
Batch process systems engineering: A retrospective and prospective review
-
D.W.T. Rippin, Batch process systems engineering: a retrospective and prospective review, Computers Chem. Eng. 17(suppl. issue)1993, S1-S13.
-
(1993)
Computers Chem. Eng.
, vol.17
, Issue.SUPPL. ISSUE
-
-
Rippin, D.W.T.1
-
23
-
-
0026108226
-
MINLP model for cyclic multiproduct scheduling on continuous parallel lines
-
N.V. Sahinidis and I.E. Grossmann, MINLP model for cyclic multiproduct scheduling on continuous parallel lines, Computers Chem. Eng. 15(1991)85-103.
-
(1991)
Computers Chem. Eng.
, vol.15
, pp. 85-103
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
24
-
-
0026143149
-
Reformulation of multiperiod MILP models for planning and scheduling of chemical processes
-
N.V. Sahinidis and I.E. Grossmann, Reformulation of multiperiod MILP models for planning and scheduling of chemical processes, Computers Chem. Eng. 15(1991)255-272.
-
(1991)
Computers Chem. Eng.
, vol.15
, pp. 255-272
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
25
-
-
0013610501
-
Optimal scheduling of multipurpose continuous plants
-
San Francisco, CA
-
G. Schilling, Y.-E. Pineau, C.C. Pantelides and N. Shah, Optimal scheduling of multipurpose continuous plants, presented at the AIChE National Meeting, San Francisco, CA, 1994.
-
(1994)
AIChE National Meeting
-
-
Schilling, G.1
Pineau, Y.-E.2
Pantelides, C.C.3
Shah, N.4
-
26
-
-
0005875751
-
-
Ph.D. Thesis, University of London, London
-
N. Shah, Efficient scheduling, planning and design of multipurpose batch plants, Ph.D. Thesis, University of London, London, 1992.
-
(1992)
Efficient Scheduling, Planning and Design of Multipurpose Batch Plants
-
-
Shah, N.1
-
27
-
-
0027545175
-
A general algorithm for short-term scheduling of batch operations. II. Computational issues
-
N. Shah, C.C. Pantelides and R.W.H. Sargent, A general algorithm for short-term scheduling of batch operations. II. Computational issues, Computers Chem. Eng. 17(1993)229-244.
-
(1993)
Computers Chem. Eng.
, vol.17
, pp. 229-244
-
-
Shah, N.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
28
-
-
34248351474
-
Optimal periodic scheduling of multipurpose batch plants
-
N. Shah, C.C. Pantelides and R.W.H. Sargent, Optimal periodic scheduling of multipurpose batch plants, Ann. Oper. Res. 42(1993)193-228.
-
(1993)
Ann. Oper. Res.
, vol.42
, pp. 193-228
-
-
Shah, N.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
29
-
-
0027657899
-
Optimal synthesis of multiproduct batch plants with cyclic scheduling and inventory considerations
-
V.T. Voudouris and I.E. Grossmann, Optimal synthesis of multiproduct batch plants with cyclic scheduling and inventory considerations, Ind. Eng. Chem. Res. 32(1993)1962-1980.
-
(1993)
Ind. Eng. Chem. Res.
, vol.32
, pp. 1962-1980
-
-
Voudouris, V.T.1
Grossmann, I.E.2
-
30
-
-
0030189663
-
An MILP model for the optimal design and scheduling of a special class of multipurpose plants
-
V.T. Voudouris and I.E. Grossmann, An MILP model for the optimal design and scheduling of a special class of multipurpose plants, Computers Chem. Eng. 20(1996)1335-1360.
-
(1996)
Computers Chem. Eng.
, vol.20
, pp. 1335-1360
-
-
Voudouris, V.T.1
Grossmann, I.E.2
-
31
-
-
0041600136
-
Scheduling of multisite flexible production systems
-
San Francisco, CA
-
S.J. Wilkinson, N. Shah and C.C. Pantelides, Scheduling of multisite flexible production systems, paper presented at the AIChE Annual Meeting, San Francisco, CA, 1994.
-
(1994)
AIChE Annual Meeting
-
-
Wilkinson, S.J.1
Shah, N.2
Pantelides, C.C.3
-
32
-
-
0004046678
-
-
Wiley, Chichester, Northern Ireland
-
P. Williams, Model Building in Mathematical Programming, 2nd ed., Wiley, Chichester, Northern Ireland, 1985.
-
(1985)
Model Building in Mathematical Programming, 2nd Ed.
-
-
Williams, P.1
-
33
-
-
0000594166
-
The optimal operation of mixed production facilities - A general formulation and some approaches to the solution
-
Kyongju, Korea
-
Z. Xueya and R.W.H. Sargent, The optimal operation of mixed production facilities - a general formulation and some approaches to the solution, Proceedings of the 5th Symposium on Process Systems Engineering, Kyongju, Korea, 1994.
-
(1994)
Proceedings of the 5th Symposium on Process Systems Engineering
-
-
Xueya, Z.1
Sargent, R.W.H.2
|