-
1
-
-
84884366383
-
Effective analysis for engineering real-time fixed priority schedulers
-
May
-
A. Burns, K. Tindell, and A. Wellings, "Effective analysis for engineering real-time fixed priority schedulers," IEEE Trans. Software Eng., vol. 21, no. 5, pp. 920-934, May 1995.
-
(1995)
IEEE Trans. Software Eng.
, vol.21
, Issue.5
, pp. 920-934
-
-
Burns, A.1
Tindell, K.2
Wellings, A.3
-
2
-
-
0035687432
-
Window-constraint real-time periodic task scheduling
-
A. K. Mok and W. Wang, "Window-constraint real-time periodic task scheduling," in Proc. RTSS, 2001, p. 15.
-
(2001)
Proc. RTSS
, pp. 15
-
-
Mok, A.K.1
Wang, W.2
-
3
-
-
84884685380
-
Determining optimal processor speeds for periodic real-time tasks with different power characteristics
-
Jun.
-
H. Aydin, R. Melhem, D. Mosse, and P. Alvarez, "Determining optimal processor speeds for periodic real-time tasks with different power characteristics," in Pmc. ECRTSS01, Jun. 2001, p. 225.
-
(2001)
Pmc. ECRTSS01
, pp. 225
-
-
Aydin, H.1
Melhem, R.2
Mosse, D.3
Alvarez, P.4
-
4
-
-
0031342838
-
Combining (n, m)-hard deadlines and dual priority scheduling
-
Dec.
-
G. Bernat and A. Burns, "Combining (n, m)-hard deadlines and dual priority scheduling," in Proc. RTSS, Dec. 1997, pp. 46-57.
-
(1997)
Proc. RTSS
, pp. 46-57
-
-
Bernat, G.1
Burns, A.2
-
5
-
-
0035308899
-
Weakly hard real-time systems
-
Apr.
-
_, "Weakly hard real-time systems," IEEE Trans. Comput., vol. 50, no. 4, pp. 308-321, Apr. 2001.
-
(2001)
IEEE Trans. Comput.
, vol.50
, Issue.4
, pp. 308-321
-
-
-
6
-
-
0035680590
-
Guaranteed on-line weakly-hard real-time systems
-
G. Bernat and R. Cayssials, "Guaranteed on-line weakly-hard real-time systems," in Proc. RTSS, 2001, p. 25.
-
(2001)
Proc. RTSS
, pp. 25
-
-
Bernat, G.1
Cayssials, R.2
-
7
-
-
0029517735
-
Dual priority scheduling
-
R. Davis and A. Wellings, "Dual priority scheduling," in Proc. RTSS, 1995, pp. 100-109.
-
(1995)
Proc. RTSS
, pp. 100-109
-
-
Davis, R.1
Wellings, A.2
-
8
-
-
84938157299
-
A dynamic priority assignment technique for streams with (m, k)-firm deadlines
-
Dec.
-
M. Hamdaoui and P. Ramanathan, "A dynamic priority assignment technique for streams with (m, k)-firm deadlines," IEEE Trans. Comput., vol. 44, no. 12, pp. 1443-1451, Dec. 1995.
-
(1995)
IEEE Trans. Comput.
, vol.44
, Issue.12
, pp. 1443-1451
-
-
Hamdaoui, M.1
Ramanathan, P.2
-
9
-
-
29144508540
-
Energy-efficient dual-voltage soft real-time system with (m, k)-firm deadline guarantee
-
S. Hua and G. Qu, "Energy-efficient dual-voltage soft real-time system with (m, k)-firm deadline guarantee," in Proc. CASE'04, 2004, pp. 116-123.
-
(2004)
Proc. CASE'04
, pp. 116-123
-
-
Hua, S.1
Qu, G.2
-
10
-
-
0042090422
-
Energy reduction techniques for multimedia applications with tolerance to deadline misses
-
S. Hua, G. Qu, and S. Bhattacharyya, "Energy reduction techniques for multimedia applications with tolerance to deadline misses," in Proc. DAC, 2003, pp. 131-136.
-
(2003)
Proc. DAC
, pp. 131-136
-
-
Hua, S.1
Qu, G.2
Bhattacharyya, S.3
-
11
-
-
33746904378
-
Dynamic power management for embedded systems
-
Nov.
-
"Dynamic power management for embedded systems," IBM J. Res. Develop., pp. 1-25, Nov. 2002.
-
(2002)
IBM J. Res. Develop.
, pp. 1-25
-
-
-
12
-
-
0346267660
-
The design and application of the PowerPC 405LP energy-efficient system on chip
-
Sep./Nov.
-
G. C. K. Nowka and B. Brock, "The design and application of the PowerPC 405LP energy-efficient system on chip," IBM J. Res. Develop., vol. 47, no. 5/6, pp. 631-639, Sep./Nov. 2003.
-
(2003)
IBM J. Res. Develop.
, vol.47
, Issue.5-6
, pp. 631-639
-
-
Nowka, G.C.K.1
Brock, B.2
-
13
-
-
84893720356
-
A dynamic voltage scaling algorithm for dynamic-priority hard real-time systems using slack analysis
-
W. Kim, J. Kim, and S. L. Min, "A dynamic voltage scaling algorithm for dynamic-priority hard real-time systems using slack analysis," in Proc. DATE, 2002, p. 788.
-
(2002)
Proc. DATE
, pp. 788
-
-
Kim, W.1
Kim, J.2
Min, S.L.3
-
14
-
-
0029487571
-
Skip-over: Algorithms and complexity for overloaded systems that allow skips
-
G. Koren and D. Shasha, "Skip-over: Algorithms and complexity for overloaded systems that allow skips," in Proc. RTSS, 1995, p. 110.
-
(1995)
Proc. RTSS
, pp. 110
-
-
Koren, G.1
Shasha, D.2
-
15
-
-
0024915921
-
The rate monotonic scheduling algorithm: Exact characterization and average case behavior
-
J. Lehoczky, L. Sha, and Y. Ding, "The rate monotonic scheduling algorithm: Exact characterization and average case behavior," in Proc. RTSS, 1989, pp. 166-171.
-
(1989)
Proc. RTSS
, pp. 166-171
-
-
Lehoczky, J.1
Sha, L.2
Ding, Y.3
-
16
-
-
0020271514
-
On the complexity of fixed-priority scheduling of periodic, real-time tasks
-
J. Y.-T. Leung and J. Whitehead, "On the complexity of fixed-priority scheduling of periodic, real-time tasks," Performance Eval., vol. 2, pp. 237-250, 1982.
-
(1982)
Performance Eval.
, vol.2
, pp. 237-250
-
-
Leung, J.Y.-T.1
Whitehead, J.2
-
17
-
-
0030398312
-
Exact admission control for networks with a bounded delay service
-
Jul.
-
J. Liebeherr, D. W. Wrege, and D. Ferrari, "Exact admission control for networks with a bounded delay service," IEEE/ACM Trans. Netw., vol. 4, pp. 885-901, Jul. 1996.
-
(1996)
IEEE/ACM Trans. Netw.
, vol.4
, pp. 885-901
-
-
Liebeherr, J.1
Wrege, D.W.2
Ferrari, D.3
-
18
-
-
84974687699
-
Scheduling algorithms for multiprogramming in a hard real-time environment
-
C. L. Liu and J. W. Layland, "Scheduling algorithms for multiprogramming in a hard real-time environment," J. ACM, vol. 17, no. 2, pp. 46-61, 1973.
-
(1973)
J. ACM
, vol.17
, Issue.2
, pp. 46-61
-
-
Liu, C.L.1
Layland, J.W.2
-
19
-
-
0003747969
-
-
Upper Saddle River, NJ: Prentice-Hall
-
J. Liu, Real-Time Systems. Upper Saddle River, NJ: Prentice-Hall, 2000.
-
(2000)
Real-time Systems
-
-
Liu, J.1
-
20
-
-
80052347963
-
Operating system modifications for task-based speed and voltage scheduling
-
J. R. Lorch and A. J. Smith, "Operating system modifications for task-based speed and voltage scheduling," in Proc. MOBISYS 2003, 2003, pp. 215-229.
-
(2003)
Proc. MOBISYS 2003
, pp. 215-229
-
-
Lorch, J.R.1
Smith, A.J.2
-
21
-
-
0034473902
-
A user-customizable energy adaptive combined static/dynamic scheduler for mobile applications
-
T. Ma and K. Shin, "A user-customizable energy adaptive combined static/dynamic scheduler for mobile applications," in Proc. RTSS, 2000, pp. 227-236.
-
(2000)
Proc. RTSS
, pp. 227-236
-
-
Ma, T.1
Shin, K.2
-
22
-
-
4444333357
-
A unified approach to variable voltage scheduling for nonideal DVS processors
-
Sep.
-
B. Mochocki, X. Hu, and G. Quan, "A unified approach to variable voltage scheduling for nonideal DVS processors," IEEE Trans. Comput.-Aided Design Integr. Circtuits Syst., vol. 23, no. 9, pp. 1370-1377, Sep. 2004.
-
(2004)
IEEE Trans. Comput.-aided Design Integr. Circtuits Syst.
, vol.23
, Issue.9
, pp. 1370-1377
-
-
Mochocki, B.1
Hu, X.2
Quan, G.3
-
23
-
-
0004081537
-
Analysis of deadline scheduled real-time systems
-
INRIA, France
-
M. Spuri, Analysis of Deadline Scheduled Real-Time Systems. INRIA, France, Rapport de Recherche RR-2772, 1996.
-
(1996)
Rapport de Recherche
, vol.RR-2772
-
-
Spuri, M.1
-
24
-
-
33746920915
-
Energy-aware scheduling for real-time systems with (m, k)-guarantee
-
Dept. Comput. Sci. Eng.
-
L. Niu and G. Quan, Energy-Aware Scheduling for Real-Time Systems With (m, k)-Guarantee. Dept. Comput. Sci. Eng., Univ. South Carolina, Tech. Rep. TR-2005-005, 2005.
-
(2005)
Univ. South Carolina, Tech. Rep.
, vol.TR-2005-005
-
-
Niu, L.1
Quan, G.2
-
25
-
-
0030403362
-
Visual assessment of a real-time system design: A case study on a CNC controller
-
Dec.
-
N. Kim, M. Ryu, S. Hong, M. Saksena, C. Choi, and H. Shin, "Visual assessment of a real-time system design: A case study on a CNC controller," in Proc. RTSS, Dec. 1996, p. 300.
-
(1996)
Proc. RTSS
, pp. 300
-
-
Kim, N.1
Ryu, M.2
Hong, S.3
Saksena, M.4
Choi, C.5
Shin, H.6
-
26
-
-
0034852171
-
Dynamic power management in a mobile multimedia system with guaranteed quality-of-service
-
Q. Qiu, Q. Wu, and M. Pedram, "Dynamic power management in a mobile multimedia system with guaranteed quality-of-service," in Proc. DAC, 2001, pp. 834-839.
-
(2001)
Proc. DAC
, pp. 834-839
-
-
Qiu, Q.1
Wu, Q.2
Pedram, M.3
-
27
-
-
0034473645
-
Enhanced fixed-priority scheduling with (m, k)-firm guarantee
-
G. Quan and X. Hu, "Enhanced fixed-priority scheduling with (m, k)-firm guarantee," in Proc. RTSS, 2000, pp. 79-88.
-
(2000)
Proc. RTSS
, pp. 79-88
-
-
Quan, G.1
Hu, X.2
-
28
-
-
0031367150
-
A resource allocation model for QoS management
-
Dec.
-
R. Rajkumar, C. Lee, J. Lehoczky, and D. Siewiorek, "A resource allocation model for QoS management," in Proc, RTSS, Dec. 1997, pp. 298-307.
-
(1997)
Proc, RTSS
, pp. 298-307
-
-
Rajkumar, R.1
Lee, C.2
Lehoczky, J.3
Siewiorek, D.4
-
29
-
-
0032663989
-
Overload management in real-time control applications using (m, k)-firm guarantee
-
Jun.
-
P. Ramanathan, "Overload management in real-time control applications using (m, k)-firm guarantee," IEEE Trans. Parallel, Distrib. Syst., vol. 10, no. 6, pp. 549-559, Jun. 1999.
-
(1999)
IEEE Trans. Parallel, Distrib. Syst.
, vol.10
, Issue.6
, pp. 549-559
-
-
Ramanathan, P.1
-
30
-
-
0034775931
-
Automatic performance-setting for dynamic voltage scaling
-
K. F. S. Reinhardt and T. Mudge, "Automatic performance-setting for dynamic voltage scaling," in Proc. MOBICOM'01, 2001, pp. 260-271.
-
(2001)
Proc. MOBICOM'01
, pp. 260-271
-
-
Reinhardt, K.F.S.1
Mudge, T.2
-
31
-
-
0030196996
-
Improvement in feasbility testing for real-time tasks
-
I. Ripoll, A. Crespo, and A. Mok, "Improvement in feasbility testing for real-time tasks," J. Real-Time Syst., vol. 11, pp. 19-40, 1996.
-
(1996)
J. Real-time Syst.
, vol.11
, pp. 19-40
-
-
Ripoll, I.1
Crespo, A.2
Mok, A.3
-
32
-
-
0035279683
-
Intra-task voltage scheduling for low-energy hard real-time applications
-
Mar.-Apr.
-
D. Shin, J. Kim, and S. Lee, "Intra-task voltage scheduling for low-energy hard real-time applications," IEEE Design Test Comput., vol. 18, no. 2, pp. 20-30, Mar.-Apr. 2001.
-
(2001)
IEEE Design Test Comput.
, vol.18
, Issue.2
, pp. 20-30
-
-
Shin, D.1
Kim, J.2
Lee, S.3
-
33
-
-
85029600625
-
Scheduling for reduced CPU energy
-
M. Weiser, B. Welch, A. Demers, and S. Shenker, "Scheduling for reduced CPU energy," OSDI, pp. 13-23, 1994.
-
(1994)
OSDI
, pp. 13-23
-
-
Weiser, M.1
Welch, B.2
Demers, A.3
Shenker, S.4
-
34
-
-
0032667338
-
Dynamic window-constrained scheduling for multimedia applications
-
R. West and K. Schwan, "Dynamic window-constrained scheduling for multimedia applications," in Proc. ICMS, 1999, pp. 87-91.
-
(1999)
Proc. ICMS
, pp. 87-91
-
-
West, R.1
Schwan, K.2
-
35
-
-
0029488569
-
A scheduling model for reduced cpu energy
-
A. F. Yao, A. Demers, and S. Shenker, "A scheduling model for reduced cpu energy," in Proc. AFCS, 1995, pp. 374-382.
-
(1995)
Proc. AFCS
, pp. 374-382
-
-
Yao, A.F.1
Demers, A.2
Shenker, S.3
-
36
-
-
21644443190
-
Energy-efficient soft real-time cpu scheduing for mobile multimedia systems
-
W. Yuan and K. Nahrstedt, "Energy-efficient soft real-time cpu scheduing for mobile multimedia systems," in Proc. SOSP, 2003, pp. 149-163.
-
(2003)
Proc. SOSP
, pp. 149-163
-
-
Yuan, W.1
Nahrstedt, K.2
-
37
-
-
0028370623
-
On the ability of establishing real-time channels in point-to-point packet-switched networks
-
3 Feb./Mar./Apr.
-
Q. Zheng and K. G. Shin, "On the ability of establishing real-time channels in point-to-point packet-switched networks," IEEE Trans. Commun., vol. 42, no. 2/3/4, pp. 1096-1105, Feb./Mar./Apr. 1994.
-
(1994)
IEEE Trans. Commun.
, vol.42
, Issue.2-4
, pp. 1096-1105
-
-
Zheng, Q.1
Shin, K.G.2
|