-
1
-
-
0025694085
-
Two New Rules to Minimize Tardiness in a Job Shop
-
Anderson, E.J. and Nyirenda, J.C., "Two New Rules to Minimize Tardiness in a Job Shop," International Journal of Production Research, Vol. 28, No. 12, pp. 2277-2292 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.12
, pp. 2277-2292
-
-
Anderson, E.J.1
Nyirenda, J.C.2
-
2
-
-
0025751859
-
A Distributed Approach to Job Scheduling in a Flexible Manufacturing System
-
Ahluwalia, R.S. and Ji, P., "A Distributed Approach to Job Scheduling in a Flexible Manufacturing System," Computers and Industrial Engineering, Vol. 20, No. 1, pp. 95-103 (1991).
-
(1991)
Computers and Industrial Engineering
, vol.20
, Issue.1
, pp. 95-103
-
-
Ahluwalia, R.S.1
Ji, P.2
-
3
-
-
0004065463
-
-
McGraw-Hill, New York
-
Bedworth, D.D., Henderson, M.R., and Wolfe, P.M., Computer-Integrated Design and Manufacturing, McGraw-Hill, New York (1991).
-
(1991)
Computer-Integrated Design and Manufacturing
-
-
Bedworth, D.D.1
Henderson, M.R.2
Wolfe, P.M.3
-
4
-
-
0004843515
-
-
Que Corporation, Indianapolis, IN
-
Blain, J., Denning, M., Dodd, B., Elkington, G., Hewson, W., Hill, K., Lingard, J., Matthews, E., Tate, J.R., and Wor, P., Special Edition Using SAP R/3, Que Corporation, Indianapolis, IN (1996).
-
(1996)
Special Edition Using SAP R/3
-
-
Blain, J.1
Denning, M.2
Dodd, B.3
Elkington, G.4
Hewson, W.5
Hill, K.6
Lingard, J.7
Matthews, E.8
Tate, J.R.9
Wor, P.10
-
5
-
-
0026191597
-
Cell Controllers: Analysis and Comparison of Three Major Projects
-
Boulet, B., Chabbra, B., Harhalakis, G., Minis, I., and Proth, J.M., "Cell Controllers: Analysis and Comparison of Three Major Projects," Computers in Industry, Vol. 16, pp. 239-254 (1991).
-
(1991)
Computers in Industry
, vol.16
, pp. 239-254
-
-
Boulet, B.1
Chabbra, B.2
Harhalakis, G.3
Minis, I.4
Proth, J.M.5
-
6
-
-
0343699912
-
Design of a Scheduling System for Flexible Manufacturing Cells
-
Chan, D.-Y. and Bedworth, D.D., "Design of a Scheduling System for Flexible Manufacturing Cells," International Journal of Production Research, Vol. 29, No. 11, pp. 2037-2049 (1990).
-
(1990)
International Journal of Production Research
, vol.29
, Issue.11
, pp. 2037-2049
-
-
Chan, D.-Y.1
Bedworth, D.D.2
-
7
-
-
0343789973
-
A Dynamic Control Model of Flexible Manufacturing Cells Using the Information Processing Object Hierarchy
-
Changchien, S.-W., Lin, L., and Sun, D., "A Dynamic Control Model of Flexible Manufacturing Cells Using the Information Processing Object Hierarchy," International Journal of Flexible Automation and Integrated Manufacturing, Vol. 3, Nos. 3-4, pp. 193-223 (1995).
-
(1995)
International Journal of Flexible Automation and Integrated Manufacturing
, vol.3
, Issue.3-4
, pp. 193-223
-
-
Changchien, S.-W.1
Lin, L.2
Sun, D.3
-
8
-
-
0024480465
-
Hierarchical Flow Control: A Framework for Scheduling and Planning Discrete Events in Manufacturing Systems
-
Gershwin, S.B., "Hierarchical Flow Control: A Framework for Scheduling and Planning Discrete Events in Manufacturing Systems," Proceedings of the Institute for Electrical and Electronic Engineers, Vol. 77, No. 1, pp. 195-299 (1989).
-
(1989)
Proceedings of the Institute for Electrical and Electronic Engineers
, vol.77
, Issue.1
, pp. 195-299
-
-
Gershwin, S.B.1
-
9
-
-
0028408966
-
Dispatching Rules in Scheduling: A Fuzzy Approach
-
Grabot, B. and Geneste, L., "Dispatching Rules in Scheduling: a Fuzzy Approach," International Journal of Production Research, Vol. 32, No. 4, pp. 903-915 (1994).
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 903-915
-
-
Grabot, B.1
Geneste, L.2
-
10
-
-
0028127531
-
A Mixed Dispatching Rule Approach in FMS Scheduling
-
??-87
-
Ishii, N. and Talavage, J.J., "A Mixed Dispatching Rule Approach in FMS Scheduling," International Journal of Flexible Manufacturing Systems, Vol. 6, No.1, pp. ??-87 (1994).
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, Issue.1
-
-
Ishii, N.1
Talavage, J.J.2
-
11
-
-
0002514818
-
A Proposed Hierarchical Control Model for Automated Manufacturing Systems
-
Jones, A. and McLean, C., "A Proposed Hierarchical Control Model for Automated Manufacturing Systems," Journal of Manufacturing Systems, Vol. 5, No. 1, pp. 15-25 (1986).
-
(1986)
Journal of Manufacturing Systems
, vol.5
, Issue.1
, pp. 15-25
-
-
Jones, A.1
McLean, C.2
-
12
-
-
38249015821
-
Simulation Studies of Multilevel Dynamic Job Shop Scheduling Using Heuristic Dispatching Rules
-
Karsiti, M.N., Cruz, Jr., J.B., and Mulligan, Jr., J.H., "Simulation Studies of Multilevel Dynamic Job Shop Scheduling Using Heuristic Dispatching Rules," Journal of Manufacturing Systems, Vol. 11, No. 5, pp. 346-358 (1992).
-
(1992)
Journal of Manufacturing Systems
, vol.11
, Issue.5
, pp. 346-358
-
-
Karsiti, M.N.1
Cruz J.B., Jr.2
Mulligan J.H., Jr.3
-
13
-
-
0025430088
-
A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternative Routing
-
Kim, Y-D., "A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternative Routing," International Journal of Production Research, Vol. 28, No. 5, pp. 953-962 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.5
, pp. 953-962
-
-
Kim, Y.-D.1
-
14
-
-
0008516998
-
Cell Control: What We Have, What We'll Need
-
January
-
Larin, D.J., "Cell Control: What We Have, What We'll Need," Manufacturing Engineering, pp. 41-54 (January 1989).
-
(1989)
Manufacturing Engineering
, pp. 41-54
-
-
Larin, D.J.1
-
15
-
-
0004312378
-
-
McGraw-Hill, New York
-
Law, A.M. and Kelton, W.D., Simulation Modeling and Analysis, 2d ed, McGraw-Hill, New York (1991).
-
(1991)
Simulation Modeling and Analysis, 2d Ed.
-
-
Law, A.M.1
Kelton, W.D.2
-
16
-
-
38249001792
-
Database Model for Hierarchical Control of Manufacturing Cell Systems in a Manufacturing Shop
-
Lin, L. and Fang, Y.-J., "Database Model for Hierarchical Control of Manufacturing Cell Systems in a Manufacturing Shop," Computer Integrated Manufacturing Systems, Vol. 6, No. 3, pp. 185-194 (1993).
-
(1993)
Computer Integrated Manufacturing Systems
, vol.6
, Issue.3
, pp. 185-194
-
-
Lin, L.1
Fang, Y.-J.2
-
17
-
-
0028387482
-
Object-Oriented Modeling and Implementation of Control Software for a Robotic Flexible Manufacturing Cell
-
Lin, L., Wakabayashi, M., and Adiga, S., "Object-Oriented Modeling and Implementation of Control Software for a Robotic Flexible Manufacturing Cell," Robotics and Computer-Integrated Manufacturing, Vol. 11, No. 1, pp. 1-12 (1994).
-
(1994)
Robotics and Computer-Integrated Manufacturing
, vol.11
, Issue.1
, pp. 1-12
-
-
Lin, L.1
Wakabayashi, M.2
Adiga, S.3
-
18
-
-
0027660753
-
Dynamic Sequencing of Robot Moves in a Manufacturing Cell
-
Liu, S.-C. and Lin, L.,"Dynamic Sequencing of Robot Moves in a Manufacturing Cell," European Journal of Operational Research, Vol. 69, No. 3, pp. 482-497 (1993).
-
(1993)
European Journal of Operational Research
, vol.69
, Issue.3
, pp. 482-497
-
-
Liu, S.-C.1
Lin, L.2
-
19
-
-
0027541129
-
A New Classification Scheme for Flexible Manufacturing Systems
-
MacCarthy, B.L. and Liu, J., "A New Classification Scheme for Flexible Manufacturing Systems," International Journal of Production Research, Vol. 31, No. 2, pp. 299-309 (1993).
-
(1993)
International Journal of Production Research
, vol.31
, Issue.2
, pp. 299-309
-
-
MacCarthy, B.L.1
Liu, J.2
-
20
-
-
0025416939
-
Analysis of Scheduling Rules for an FMS
-
Montazeri, M. and Van Wassenhove, L.N., "Analysis of Scheduling Rules for an FMS," International Journal of Production Research, Vol. 28, No. 4, pp. 785-802 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.4
, pp. 785-802
-
-
Montazeri, M.1
Van Wassenhove, L.N.2
-
21
-
-
0027593575
-
A Constructive Heuristic Algorithm for Concurrently Selecting and Sequencing Jobs in an FMS Environment
-
Moreno, A.A. and Ding, F.-Y., "A Constructive Heuristic Algorithm for Concurrently Selecting and Sequencing Jobs in an FMS Environment," International Journal of Production Research, Vol. 31, No. 5, pp. 1157-1169 (1993).
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1157-1169
-
-
Moreno, A.A.1
Ding, F.-Y.2
-
22
-
-
0019540666
-
Combined Scheduling System for Reducing Job Tardiness in a Job Shop
-
Miyazaki, S., "Combined Scheduling System for Reducing Job Tardiness in a Job Shop," International Journal of Production Research, Vol. 19, No. 2, pp. 21-211 (1981).
-
(1981)
International Journal of Production Research
, vol.19
, Issue.2
, pp. 21-211
-
-
Miyazaki, S.1
-
24
-
-
0025482435
-
Job Shop Scheduling with Alternative Machines
-
Nasr, N. and Elsayed, E.A., "Job Shop Scheduling with Alternative Machines," International Journal of Production Research, Vol. 28, No. 9, pp. 1595-1609 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.9
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, E.A.2
-
26
-
-
0016885524
-
A Statistical Comparison of the Performance of Simple Dispatching Rules for a Particular Set of Job Shops
-
Rochette, R. and Sadowski, R.P., "A Statistical Comparison of the Performance of Simple Dispatching Rules for a Particular Set of Job Shops," International Journal of Production Research, Vol. 14, No. 1, pp. 63-75 (1976).
-
(1976)
International Journal of Production Research
, vol.14
, Issue.1
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
27
-
-
0022060472
-
A Loading and Dispatching Problem in a Random Flexible Manufacturing System
-
Shanker, K. and Tzen, Y.-J., "A Loading and Dispatching Problem in a Random Flexible Manufacturing System," International Journal of Production Research, Vol. 23, No. 3, pp. 579-595 (1985).
-
(1985)
International Journal of Production Research
, vol.23
, Issue.3
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.-J.2
-
28
-
-
38249014005
-
Heuristics for Dynamic Selection and Routing of Parts in an FMS
-
Shmilovici, A. and Maimon, O.Z., "Heuristics for Dynamic Selection and Routing of Parts in an FMS," Journal of Manufacturing Systems, Vol. 11, No. 4, pp. 285-296 (1992).
-
(1992)
Journal of Manufacturing Systems
, vol.11
, Issue.4
, pp. 285-296
-
-
Shmilovici, A.1
Maimon, O.Z.2
-
29
-
-
0020453434
-
The Automated Manufacturing Research Facility of the National Bureau of Standards
-
Simpson, J.A., Hocken, R.J., and Albus, J.S., "The Automated Manufacturing Research Facility of the National Bureau of Standards," Journal of Manufacturing Systems, Vol. 1, No. 1, pp. 17-31 (1982).
-
(1982)
Journal of Manufacturing Systems
, vol.1
, Issue.1
, pp. 17-31
-
-
Simpson, J.A.1
Hocken, R.J.2
Albus, J.S.3
-
30
-
-
0023399009
-
Priority Rules for Job Shops with Weighted Tardiness Costs
-
Vepsalainen, A.P.J. and Morton, T.E., "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, Vol. 33, No. 8, pp. 1035-1047 (1987).
-
(1987)
Management Science
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
31
-
-
0026964206
-
Job-Shop Scheduling Using Fuzzy Inference to Make Profit into Account
-
Watanabe, T., Tokumaru, H., and Nakajima, Y., "Job-Shop Scheduling Using Fuzzy Inference to Make Profit into Account," Proceedings of the 1992 Japan/USA Symposium on Flexible Automation, ASME, Vol. 1, pp. 423-427 (1992).
-
(1992)
Proceedings of the 1992 Japan/USA Symposium on Flexible Automation, ASME
, vol.1
, pp. 423-427
-
-
Watanabe, T.1
Tokumaru, H.2
Nakajima, Y.3
-
32
-
-
0025510925
-
Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs
-
Wein, L.M., "Scheduling Networks of Queues: Heavy Traffic Analysis of a Two-Station Network with Controllable Inputs," Operations Research, Vol. 38, No. 6, pp. 1065-1078 (1990).
-
(1990)
Operations Research
, vol.38
, Issue.6
, pp. 1065-1078
-
-
Wein, L.M.1
-
33
-
-
0026884810
-
A Broader View of the Job-Shop Scheduling Problem
-
Wein, L.M. and Chevalier, P.B., "A Broader View of the Job-Shop Scheduling Problem," Management Science, Vol. 38, No. 7, pp. 1018-1033 (1992).
-
(1992)
Management Science
, vol.38
, Issue.7
, pp. 1018-1033
-
-
Wein, L.M.1
Chevalier, P.B.2
-
34
-
-
0021898921
-
Effectiveness of Alternate Operations in a Flexible Manufacturing System
-
Wilhelm, W.E. and Shin, H.-M., "Effectiveness of Alternate Operations in a Flexible Manufacturing System," International Journal of Production Research, Vol. 23, No. 1, pp. 65-79 (1985).
-
(1985)
International Journal of Production Research
, vol.23
, Issue.1
, pp. 65-79
-
-
Wilhelm, W.E.1
Shin, H.-M.2
|