-
3
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker K.R. Sequencing rules and due-date assignments in a job shop. Management Science. 30:1984;1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
7
-
-
0001173520
-
Priority dispatching and job lateness in a job shop
-
Conway R.W. Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering. 16:1965;123-130.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 123-130
-
-
Conway, R.W.1
-
11
-
-
34249973653
-
A survey of priority rule based dispatching
-
Haupt R. A survey of priority rule based dispatching. O.R. Spektrum. 11:1989;3-16.
-
(1989)
O.R. Spektrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
13
-
-
0034161039
-
Efficient jobshop dispatching rules: Further developments
-
Holthaus O., Rajendran C. Efficient jobshop dispatching rules: Further developments. Production Planning and Control. 11:2000;171-178.
-
(2000)
Production Planning and Control
, vol.11
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
14
-
-
0029387523
-
Technical note: Evaluation of scheduling rules with commensurate customer priorities in job shops
-
Jensen J.B., Philipoom P.R., Malhotra M.K. Technical note: Evaluation of scheduling rules with commensurate customer priorities in job shops. Journal of Operations Management. 13:1995;213-228.
-
(1995)
Journal of Operations Management
, vol.13
, pp. 213-228
-
-
Jensen, J.B.1
Philipoom, P.R.2
Malhotra, M.K.3
-
15
-
-
0012298197
-
Priority dispatching with operation due-dates in a job shop
-
Kanet J.J., Hayya J.G. Priority dispatching with operation due-dates in a job shop. Journal of Operations Management. 2:1982;167-176.
-
(1982)
Journal of Operations Management
, vol.2
, pp. 167-176
-
-
Kanet, J.J.1
Hayya, J.G.2
-
16
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
Kutanoglu E., Sabuncuoglu I. An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research. 37:1999;165-188.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 165-188
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
17
-
-
0021521848
-
Confidence intervals for steady state Simulation: I. A survey of fixed sample survey procedures
-
Law A.M., Kelton W.D. Confidence intervals for steady state Simulation: I. A survey of fixed sample survey procedures. Operations Research. 32:1984;1221-1239.
-
(1984)
Operations Research
, vol.32
, pp. 1221-1239
-
-
Law, A.M.1
Kelton, W.D.2
-
24
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flow shops and job shops
-
Rajendran C., Holthaus O. A comparative study of dispatching rules in dynamic flow shops and job shops. European Journal of Operational Research. 116:1999;156-170.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
25
-
-
29444438437
-
Dynamic job shop Scheduling: A survey of simulation research
-
Ramasesh R. Dynamic job shop Scheduling: A survey of simulation research. OMEGA. 16:1990;43-57.
-
(1990)
OMEGA
, vol.16
, pp. 43-57
-
-
Ramasesh, R.1
-
26
-
-
0016885524
-
A statistical comparison of the performance of simple dispatching rules for a particular set of job shops
-
Rochette R., Sadowski R.P. A statistical comparison of the performance of simple dispatching rules for a particular set of job shops. International Journal of Production Research. 14:1976;63-75.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
27
-
-
0023437076
-
A comparative analysis of the COVERT job sequencing rule using various shop performance parameters
-
Russell R.S., Dar-el E.M., Taylor III B.W. A comparative analysis of the COVERT job sequencing rule using various shop performance parameters. International Journal of Production Research. 25:1987;1523-1540.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1523-1540
-
-
Russell, R.S.1
Dar-El, E.M.2
Taylor III, B.W.3
-
28
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
Vepsalainen A.P.J., Morton T.E. Priority rules for job shops with weighted tardiness costs. Management Science. 33:1987;1035-1047.
-
(1987)
Management Science
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
|