-
1
-
-
0034433761
-
"Development of pavement type evaluation procedure for Texas Department of Transportation"
-
Transportation Research Board, National Research Council, Washington, D.C
-
Beg, M., Zhang, Z., and Hudson, W. R. (2000). "Development of pavement type evaluation procedure for Texas Department of Transportation." Transportation Research Record No. 1699, Transportation Research Board, National Research Council, Washington, D.C., 23-32.
-
(2000)
Transportation Research Record No. 1699
, pp. 23-32
-
-
Beg, M.1
Zhang, Z.2
Hudson, W.R.3
-
2
-
-
0004023304
-
-
California Department of Transportation (Caltrans.) Maintenance and Transportation Programming, Sacramento, Calif
-
California Department of Transportation (Caltrans. (1998). Ten-year state highway system rehabilitation plan 1998-99 through 2007-08, Maintenance and Transportation Programming, Sacramento, Calif.
-
(1998)
Ten-year State Highway System Rehabilitation Plan 1998-99 Through 2007-08
-
-
-
3
-
-
28844488278
-
-
California Department of Transportation (Caltrans. (June 15, 2003)
-
California Department of Transportation (Caltrans. (2000). (http://www.dot.gov/...ar/006034/Specials/04-006034ad9.pdf) (June 15, 2003).
-
(2000)
-
-
-
4
-
-
28844470721
-
"Existing highways"
-
(June 12, 2003)
-
"Existing highways." (2002). (June 12, 2003).
-
(2002)
-
-
-
5
-
-
11644308477
-
"Lane rental - Innovative way to reduce road construction time"
-
Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental - Innovative way to reduce road construction time." J. Constr Eng. Manage., 124(5), 411-417.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.5
, pp. 411-417
-
-
Herbsman, Z.J.1
Glagola, C.R.2
-
6
-
-
0003693579
-
-
Transportation Research Board, National Research Council, Washington, D.C
-
Highway Capacity Manual (HCM). (2000). Transportation Research Board, National Research Council, Washington, D.C.
-
(2000)
Highway Capacity Manual (HCM)
-
-
-
7
-
-
28844454200
-
"Integrated design/construction/operations analysis for fast-track urban freeway reconstruction"
-
in press
-
Lee, E. B., Harvey, J. T., and Thomas, D. (2005). "Integrated design/construction/operations analysis for fast-track urban freeway reconstruction." J. Constr. Eng. Manage., 131(12), in press.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.12
-
-
Lee, E.B.1
Harvey, J.T.2
Thomas, D.3
-
8
-
-
15944379640
-
"Computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)"
-
Lee, E. B., and Ibbs, C. W. (2005). "Computer simulation model: Construction analysis for highway rehabilitation strategies (CA4PRS)." J. Constr Eng. Manage., 131(4), 449-458.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 449-458
-
-
Lee, E.B.1
Ibbs, C.W.2
-
9
-
-
0034433072
-
"Construction productivity and constraints for concrete pavement rehabilitation in urban corridors"
-
Transportation Research Board, National Research Council, Washington, D.C
-
Lee, E. B., Ibbs, W., Roesler, J., and Harvey, J. (2000). "Construction productivity and constraints for concrete pavement rehabilitation in urban corridors." Transportation Research Record No. 1712, Transportation Research Board, National Research Council, Washington, D.C., 13-22.
-
(2000)
Transportation Research Record No. 1712
, pp. 13-22
-
-
Lee, E.B.1
Ibbs, W.2
Roesler, J.3
Harvey, J.4
-
10
-
-
28844458012
-
"Fast-track asphalt concrete pavement rehabilitation on I-710 Long Beach (CA) during 55-hour weekend closures"
-
Washington, D.C
-
Lee, E. B., Lee, H., Harvey, J., and Monismith, C. (2003). "Fast-track asphalt concrete pavement rehabilitation on I-710 Long Beach (CA) during 55-hour weekend closures." 2004 Transportation Research Board Meeting, Washington, D.C.
-
(2003)
2004 Transportation Research Board Meeting
-
-
Lee, E.B.1
Lee, H.2
Harvey, J.3
Monismith, C.4
-
11
-
-
0012656277
-
"Case study of urban concrete pavement reconstruction on Interstate 10"
-
Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2002). "Case study of urban concrete pavement reconstruction on Interstate 10." J. Constr Eng. Manage., 128(l), 49-56.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 49-56
-
-
Lee, E.B.1
Roesler, J.R.2
Harvey, J.T.3
Ibbs, C.W.4
-
12
-
-
28844470987
-
"Work zone traffic impact analysis: Simulation-based case study of the interstate 15 Devore (CA) reconstruction project"
-
Technical Rep., California Department of Transportation, Sacramento, Calif
-
Ma, J., Gardes, Y., Lee, E. B., and Warren, C. (2003). "Work zone traffic impact analysis: Simulation-based case study of the interstate 15 Devore (CA) reconstruction project." Technical Rep., California Department of Transportation, Sacramento, Calif.
-
(2003)
-
-
Ma, J.1
Gardes, Y.2
Lee, E.B.3
Warren, C.4
-
15
-
-
28844475490
-
-
Regents of University of California: FREQ12 Simulation Model. (June 26, 2003)
-
Regents of University of California: FREQ12 Simulation Model. (2002). (June 26, 2003).
-
(2002)
-
-
|