메뉴 건너뛰기




Volumn 128, Issue 1, 2002, Pages 49-56

Case study of urban concrete pavement reconstruction on interstate 10

Author keywords

California; Case reports; Concrete pavements; Interstate high ways; Reconstruction; Urban areas

Indexed keywords

CALIFORNIA; CASE REPORTS; LONG-LIFE PAVEMENTS; TRAFFIC MANAGEMENT;

EID: 0012656277     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:1(49)     Document Type: Article
Times cited : (21)

References (6)
  • 1
    • 13944270806 scopus 로고    scopus 로고
    • Caltrans Maintenance Program, Pavement Management Information Branch, Sacramento, Calif.
    • California Department of Transportation (Caltrans). (1996). 1995 state of the pavement, Caltrans Maintenance Program, Pavement Management Information Branch, Sacramento, Calif.
    • (1996) 1995 State of the Pavement
  • 3
    • 0029469924 scopus 로고
    • Time is money: Innovative contracting methods in highway construction
    • Herbsman, Z., Chen, W. T., and Epstein, W. C. (1995). "Time is money: Innovative contracting methods in highway construction." J. Constr. Eng. Manage., 121(3), 273-281.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 273-281
    • Herbsman, Z.1    Chen, W.T.2    Epstein, W.C.3
  • 4
    • 13944276106 scopus 로고    scopus 로고
    • Case study of urban concrete pavement reconstruction and traffic management for the 1-10 (Pomona, Calif.) project
    • Innovative Pavement Research Foundation, Falls Church, Va.
    • Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2000c). "Case study of urban concrete pavement reconstruction and traffic management for the 1-10 (Pomona, Calif.) project." Research Reports and Findings No: DTFH61-99-X-00008, Innovative Pavement Research Foundation, Falls Church, Va.
    • (2000) Research Reports and Findings No: DTFH61-99-X-00008 , vol.DTFH61-99-X-00008
    • Lee, E.B.1    Roesler, J.R.2    Harvey, J.T.3    Ibbs, C.W.4
  • 5
    • 13944272808 scopus 로고    scopus 로고
    • Constructability and productivity analysis for long life concrete pavement rehabilitation strategies
    • Pavement Research Center, Univ. of California, Berkeley, Calif.
    • Lee, E. B., Ibbs, C. W., Harvey, J. T., and Roesler, J. R. (2000a). "Constructability and productivity analysis for long life concrete pavement rehabilitation Strategies." Final Rep. FHWA/CA/OR-2000/01, Pavement Research Center, Univ. of California, Berkeley, Calif.
    • (2000) Final Rep. , vol.FHWA-CA-OR-2000-01
    • Lee, E.B.1    Ibbs, C.W.2    Harvey, J.T.3    Roesler, J.R.4
  • 6
    • 0034433072 scopus 로고    scopus 로고
    • Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
    • Transportation Research Board, Washington, D.C.
    • Lee, E. B., Ibbs, C. W., Roesler, J. R., and Harvey, J. T. (2000b). "Construction productivity and constraints for concrete pavement rehabilitation in urban corridors." Transportation Research Record No. 1712, Transportation Research Board, Washington, D.C., 13-22.
    • (2000) Transportation Research Record No. 1712 , vol.1712 , pp. 13-22
    • Lee, E.B.1    Ibbs, C.W.2    Roesler, J.R.3    Harvey, J.T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.