-
1
-
-
15944377870
-
Guidelines for warranty, multi-parameter, and best value contracting
-
Transportation Research Board, Washington, D.C.
-
Anderson, A. D., and Russell, J. S. (2001). "Guidelines for warranty, multi-parameter, and best value contracting." Res. Rep. Series: NCHRP (National Cooperative Highway Research Program) Rep. No. 451, Transportation Research Board, Washington, D.C.
-
(2001)
Res. Rep. Series: NCHRP (National Cooperative Highway Research Program) Rep. No. 451
, vol.451
-
-
Anderson, A.D.1
Russell, J.S.2
-
2
-
-
5244376247
-
Incentive/disincentive provisions in highway contracts
-
Arditi, D., Khisty, J., and Yasamis, F. (1997). "Incentive/ disincentive provisions in highway contracts." J. Constr. Eng. Manage., 123(3), 302-307.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 302-307
-
-
Arditi, D.1
Khisty, J.2
Yasamis, F.3
-
4
-
-
29044434295
-
Public roads
-
U.S. Department of Transportation, Washington, D.C., Winter
-
Federal Highway Administration (FHWA). (1996). "Public roads." J. Highway Res. Development, U.S. Department of Transportation, Washington, D.C., Winter.
-
(1996)
J. Highway Res. Development
-
-
-
5
-
-
11644308477
-
Lane rental - Innovative way to reduce road construction time
-
Herbsman, Z. J., and Glagola, C. R. (1998). "Lane rental - Innovative way to reduce road construction time." J. Constr. Eng. Manage., 124(5), 411-417.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.5
, pp. 411-417
-
-
Herbsman, Z.J.1
Glagola, C.R.2
-
7
-
-
0036962093
-
Construction productivity analysis for asphalt concrete pavement rehabilitation in urban corridors
-
Transportation Research Board, Washington, D.C.
-
Lee, E. B., Harvey, J. T., Ibbs, C. W., and St. Martin, J. (2002a). "Construction productivity analysis for asphalt concrete pavement rehabilitation in urban corridors." Transportation Research Record 1813, Transportation Research Board, Washington, D.C., 285-294.
-
(2002)
Transportation Research Record
, vol.1813
, pp. 285-294
-
-
Lee, E.B.1
Harvey, J.T.2
Ibbs, C.W.3
St Martin, J.4
-
8
-
-
0034433072
-
Construction productivity and constraints for concrete pavement rehabilitation in urban corridors
-
Transportation Research Board, Washington, D.C.
-
Lee, E. B., Ibbs, C. W., Roesler, J., and Harvey, J. T. (2000). "Construction productivity and constraints for concrete pavement rehabilitation in urban corridors." Transportation Research Record 1712, Transportation Research Board, Washington, D.C., 13-22.
-
(2000)
Transportation Research Record
, vol.1712
, pp. 13-22
-
-
Lee, E.B.1
Ibbs, C.W.2
Roesler, J.3
Harvey, J.T.4
-
9
-
-
15944414569
-
Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis
-
in press
-
Lee, E. B., Ibbs, C. W., and Thomas, D. (2005). "Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis." J. Infrastruct. Syst., in press.
-
(2005)
J. Infrastruct. Syst.
-
-
Lee, E.B.1
Ibbs, C.W.2
Thomas, D.3
-
10
-
-
15944407332
-
Fast-track asphalt concrete pavement rehabilitation on I-710 long Beach (CA) during 55-hour weekend closures
-
(CD-ROM), Transportation Research Board, National Research Council, Washington, D.C.
-
Lee, E. B., Lee, H. J., Monismith, C., and Harvey, J. T. (2003). "Fast-track asphalt concrete pavement rehabilitation on I-710 Long Beach (CA) during 55-hour weekend closures." Preprints of the Transportation Research Board 83rd Annual Meeting (CD-ROM), Transportation Research Board, National Research Council, Washington, D.C.
-
(2003)
Preprints of the Transportation Research Board 83rd Annual Meeting
-
-
Lee, E.B.1
Lee, H.J.2
Monismith, C.3
Harvey, J.T.4
-
11
-
-
0012656277
-
Case study of urban concrete pavement reconstruction on interstate 10
-
Lee, E. B., Roesler, J. R., Harvey, J. T., and Ibbs, C. W. (2002b). "Case study of urban concrete pavement reconstruction on interstate 10." J. Constr. Eng. Manage., 128(1), 49-56.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 49-56
-
-
Lee, E.B.1
Roesler, J.R.2
Harvey, J.T.3
Ibbs, C.W.4
-
12
-
-
0003906653
-
-
Van Nostrand Reinhold, New York
-
Moder, J., Phillips, C., and Davis, E. (1983). Project management with CPM, PERT, and precedence diagram, 3rd Ed., Van Nostrand Reinhold, New York.
-
(1983)
Project Management with CPM, PERT, and Precedence Diagram, 3rd Ed.
-
-
Moder, J.1
Phillips, C.2
Davis, E.3
-
13
-
-
0142174789
-
Evaluation of longer-life concrete pavements for California using accelerated pavement testing
-
Reno, Nev.
-
Roesler, J. R., Harvey, J. T., Hung, D., Du Plessis, L., and Bush, D. (1999). "Evaluation of longer-life concrete pavements for California using accelerated pavement testing." Proc., Accelerated Pavement Testing Int. Conf., Reno, Nev.
-
(1999)
Proc., Accelerated Pavement Testing Int. Conf.
-
-
Roesler, J.R.1
Harvey, J.T.2
Hung, D.3
Du Plessis, L.4
Bush, D.5
-
15
-
-
14744281187
-
MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement
-
Timm, D., Voller, V., Lee, E. B., and Harvey, J. T. (2001). "MultiCool: A numerical solution program for multi-layer cooling time of asphalt concrete pavement." Int. J. Pavement Eng., 2, 169-185.
-
(2001)
Int. J. Pavement Eng.
, vol.2
, pp. 169-185
-
-
Timm, D.1
Voller, V.2
Lee, E.B.3
Harvey, J.T.4
-
17
-
-
84860098998
-
-
December 15, 2003
-
U.S. Congressional Budget Office. (1988). "U.S. Congressional Budget Office (CBO) study." 〈http://www.tc.gc.ca/POL/en/Report/ Highway_Benefit-Cost%20_Analysis/Chapter5.htm〉 (December 15, 2003).
-
(1988)
U.S. Congressional Budget Office (CBO) Study
-
-
-
19
-
-
84860100237
-
-
June 12, 2003
-
Wisconsin Department of Transportation (WisDOT). (2002). 〈http:// www.dot.wisconsin.gov/projects/state/sixyear/hwys.htm〉 (June 12, 2003).
-
(2002)
-
-
|