-
1
-
-
0029288359
-
The economic lot delivery scheduling problem the common cycle case
-
Hahm, J., and Yano, C.A., (1995) The economic lot delivery scheduling problem the common cycle case. HE Transactions, 27, 113–125.
-
(1995)
HE Transactions
, vol.27
, pp. 113-125
-
-
Hahm, J.1
Yano, C.A.2
-
2
-
-
0029293670
-
The economic lot delivery scheduling problem models for nested schedules
-
Hahm, J., and Yano, C.A., (1995) The economic lot delivery scheduling problem models for nested schedules. HE Transactions, 27, 126–139.
-
(1995)
HE Transactions
, vol.27
, pp. 126-139
-
-
Hahm, J.1
Yano, C.A.2
-
3
-
-
0029354494
-
The economic lot delivery scheduling problem powers of two policies
-
Hahm, J., and Yano, C.A., (1995) The economic lot delivery scheduling problem powers of two policies. Transportation Science, 29 (3), 222–241.
-
(1995)
Transportation Science
, vol.29
, Issue.3
, pp. 222-241
-
-
Hahm, J.1
Yano, C.A.2
-
5
-
-
34248539177
-
Flexibility in manufacturing a survey
-
Sethi, A.K., and Sethi, P.S., (1990) Flexibility in manufacturing a survey. The International Journal of Flexible Manufacturing Systems, 2, 289–328.
-
(1990)
The International Journal of Flexible Manufacturing Systems
, vol.2
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, P.S.2
-
6
-
-
0025243881
-
Deliberately slowing down output in a family production context
-
Silver, E.A., (1990) Deliberately slowing down output in a family production context. International Journal of Production Research, 28 (1), 17–27.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 17-27
-
-
Silver, E.A.1
-
7
-
-
0026373729
-
Controllable production rates in a family production context
-
Moon, I., Gallego, G., and Simchi-Levi, D., (1991) Controllable production rates in a family production context. International Journal of Production Research, 29, 2459–2470.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2459-2470
-
-
Moon, I.1
Gallego, G.2
Simchi-Levi, D.3
-
8
-
-
0027594688
-
Reduced production rates in the economic lot scheduling problem
-
Gallego, G., (1993) Reduced production rates in the economic lot scheduling problem. International Journal of Production Research, 31 (5), 1035–1046.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1035-1046
-
-
Gallego, G.1
-
9
-
-
0030734428
-
The scheduling of economic lot sizes on volume flexible production systems
-
Khouja, M., (1997) The scheduling of economic lot sizes on volume flexible production systems. The International Journal of Production Economics, 48, 73–86.
-
(1997)
The International Journal of Production Economics
, vol.48
, pp. 73-86
-
-
Khouja, M.1
-
10
-
-
0033225735
-
A note on “deliberately slowing down output in a family production context
-
Khouja, M., (1999) A note on “deliberately slowing down output in a family production context.” International Journal of Production Research, 37, 4067–4077.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 4067-4077
-
-
Khouja, M.1
-
11
-
-
1842560385
-
A supply chain inventory model with rework cost and variable unit production times
-
Khouja, M., (1996) A supply chain inventory model with rework cost and variable unit production times. Management Science and Regional Development, 1 (2) 3–21.
-
(1996)
Management Science and Regional Development
, vol.1
, Issue.2
, pp. 3-21
-
-
Khouja, M.1
-
12
-
-
38249010317
-
The economic lot delivery scheduling problem the single item case
-
Hahm, J., and Yano, C.A., (1992) The economic lot delivery scheduling problem the single item case. International Journal of Production Economics, 28, 235–252.
-
(1992)
International Journal of Production Economics
, vol.28
, pp. 235-252
-
-
Hahm, J.1
Yano, C.A.2
-
13
-
-
0022613610
-
Optimal lot sizing, process quality improvement, and setup cost reduction
-
Porteus, E.L., (1986) Optimal lot sizing, process quality improvement, and setup cost reduction. Operations Research, 34, 137–144.
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
14
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt, M.J., and Lee, H.L., (1986) Economic production cycles with imperfect production processes. HE Transactions, 17, 48–54.
-
(1986)
HE Transactions
, vol.17
, pp. 48-54
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
15
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
Cheng, T.C.E., (1991) An economic order quantity model with demand-dependent unit production cost and imperfect production processes. HE Transactions, 23 (1), 23–28.
-
(1991)
HE Transactions
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
16
-
-
0028698197
-
An economic production lot size model with imperfect quality and variable production rate
-
Khouja, M., and Mehrez, A., (1994) An economic production lot size model with imperfect quality and variable production rate. Journal of the Operational Research Society, 45 (12), 1405–1417.
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.12
, pp. 1405-1417
-
-
Khouja, M.1
Mehrez, A.2
-
17
-
-
0029481403
-
Optimal robot operation and selection using quality and output trade-off
-
Khouja, M., Rabinowitz, G., and Mehrez, A., (1995) Optimal robot operation and selection using quality and output trade-off. The International Journal of Advanced Manufacturing Technology, 10, 342–355.
-
(1995)
The International Journal of Advanced Manufacturing Technology
, vol.10
, pp. 342-355
-
-
Khouja, M.1
Rabinowitz, G.2
Mehrez, A.3
-
18
-
-
0029252434
-
A decision analysis view of the effect of robot repeatability on profit
-
Mehrez, A., Offodile, O.F., and Ahn, B., (1995) A decision analysis view of the effect of robot repeatability on profit. HE Transactions, 27, 60–71.
-
(1995)
HE Transactions
, vol.27
, pp. 60-71
-
-
Mehrez, A.1
Offodile, O.F.2
Ahn, B.3
-
19
-
-
0028436756
-
A statistical-economic framework for evaluating the effect of robot repeatability on profit
-
Mehrez, A., and Offodile, O.F., (1994) A statistical-economic framework for evaluating the effect of robot repeatability on profit. HE Transaction, 26 (3), 101–110.
-
(1994)
HE Transaction
, vol.26
, Issue.3
, pp. 101-110
-
-
Mehrez, A.1
Offodile, O.F.2
-
21
-
-
0001963572
-
Flexibility in manufacturing plants
-
Elsevier, New York, NY
-
Falkner, C.H., (1986) Flexibility in manufacturing plants, in Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, Elsevier, New York, NY. pp. 95–106.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems
, pp. 95-106
-
-
Falkner, C.H.1
-
22
-
-
0000911188
-
Measurement of manufacturing flexibility
-
Ramasesh, R.V., and Jayakumar, M.D., (1991) Measurement of manufacturing flexibility. Journal of Operations Management, 10 (4), 446–467.
-
(1991)
Journal of Operations Management
, vol.10
, pp. 446-467
-
-
Ramasesh, R.V.1
Jayakumar, M.D.2
-
23
-
-
0026141756
-
Optimizing processing rates for flexible manufacturing systems
-
Schweitzer, P.J., and Seidmann, A., (1991) Optimizing processing rates for flexible manufacturing systems. Management Science, 37, 454–466.
-
(1991)
Management Science
, vol.37
, pp. 454-466
-
-
Schweitzer, P.J.1
Seidmann, A.2
-
24
-
-
0003981879
-
-
Drozda, T.J. and Wick, C. (eds), Society of Mechanical Engineers, Dearborn, MI
-
Drozda, T.J. and Wick, C. (eds) (1983) Tool and Manufacturing Engineers Handbook, Vol. 1, Society of Mechanical Engineers, Dearborn, MI.
-
(1983)
Tool and Manufacturing Engineers Handbook
, vol.1
-
-
|