메뉴 건너뛰기




Volumn 29, Issue 5, 1997, Pages 349-357

Optimization-based planning for the stochastic lot-scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; INDUSTRIAL ECONOMICS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; RANDOM PROCESSES; SCHEDULING; STRATEGIC PLANNING;

EID: 0031145148     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179708966340     Document Type: Article
Times cited : (39)

References (17)
  • 1
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP) review and extensions
    • Elmaghraby, S. E., (1978) The economic lot scheduling problem (ELSP) review and extensions. Management Science, 24, 587–598.
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 3
    • 0000331249 scopus 로고
    • Scheduling economic lot size production runs
    • Davis, S. G., (1990) Scheduling economic lot size production runs. Management Science, 36 (8), 985–998.
    • (1990) Management Science , vol.36 , Issue.8 , pp. 985-998
    • Davis, S.G.1
  • 4
    • 84989742214 scopus 로고
    • The economic lot scheduling problem with finite backorder costs
    • Gallego, G., and Roundy, R., (1992) The economic lot scheduling problem with finite backorder costs. Naval Research Logistics, 39, 729–739.
    • (1992) Naval Research Logistics , vol.39 , pp. 729-739
    • Gallego, G.1    Roundy, R.2
  • 6
    • 0025564737 scopus 로고
    • Scheduling the production of several items with random demands in a single facility
    • Gallego, G., (1990) Scheduling the production of several items with random demands in a single facility. Management Science, 36 (12), 1579–1592.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1579-1592
    • Gallego, G.1
  • 7
    • 0028393317 scopus 로고
    • Multi-item, single-machine scheduling problem with stochastic demands a comparison of heuristics
    • Gascon, A., Leachman, R.C., and Lefrancois, P., (1994) Multi-item, single-machine scheduling problem with stochastic demands a comparison of heuristics. International Journal of Production Research, 32 (3), 583–596.
    • (1994) International Journal of Production Research , vol.32 , Issue.3 , pp. 583-596
    • Gascon, A.1    Leachman, R.C.2    Lefrancois, P.3
  • 8
    • 0001267220 scopus 로고
    • The strategic use of capacity slack in the economic lot scheduling problem with random demand
    • Bourland, K. E., and Yano, C., (1994) The strategic use of capacity slack in the economic lot scheduling problem with random demand. Management Science, 40 (12), 1690–1704.
    • (1994) Management Science , vol.40 , Issue.12 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.2
  • 9
    • 0001706406 scopus 로고    scopus 로고
    • The stochastic economic lot scheduling problem cyclical ase-stock policies with idle times
    • Federgruen, A., and Katalan, Z., (1996) The stochastic economic lot scheduling problem cyclical ase-stock policies with idle times. Management Science, 42 (4), 783–796.
    • (1996) Management Science , vol.42 , Issue.4 , pp. 783-796
    • Federgruen, A.1    Katalan, Z.2
  • 11
    • 0027927413 scopus 로고
    • Economic lot scheduling problem with raw material considerations
    • Gallego, G., and Joneja, D., (1994) Economic lot scheduling problem with raw material considerations. Operations Research, 42 (1), 92–101.
    • (1994) Operations Research , vol.42 , Issue.1 , pp. 92-101
    • Gallego, G.1    Joneja, D.2
  • 12
    • 0017933645 scopus 로고
    • Scheduling rules for the multiple product single machine system with stochastic demand
    • Vergin, R. C., and Lee, T. N., (1978) Scheduling rules for the multiple product single machine system with stochastic demand. 1NFOR, 16 (1), 64–73.
    • (1978) 1NFOR , vol.16 , Issue.1 , pp. 64-73
    • Vergin, R.C.1    Lee, T.N.2
  • 13
    • 0023977009 scopus 로고
    • A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
    • Leachman, R. C., and Gascon, A., (1988) A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands. Management Science, 34, 377–390.
    • (1988) Management Science , vol.34 , pp. 377-390
    • Leachman, R.C.1    Gascon, A.2
  • 14
    • 0019057204 scopus 로고
    • The multi-product production cycling problem
    • Graves, S. C., (1980) The multi-product production cycling problem. AIIE Transactions, 12, 233–240.
    • (1980) AIIE Transactions , vol.12 , pp. 233-240
    • Graves, S.C.1
  • 15
    • 0030287501 scopus 로고    scopus 로고
    • Multi-item, multi-period production planning with uncertain demand
    • Sox, C. R., and Muckstadt, J. A., (1996) Multi-item, multi-period production planning with uncertain demand. 11E Transactions, 28 (1), 891–900.
    • (1996) 11E Transactions , vol.28 , Issue.1 , pp. 891-900
    • Sox, C.R.1    Muckstadt, J.A.2
  • 16
    • 85023851880 scopus 로고
    • Presented at INFORMS Conference, New Orleans., IBM Corporate Business Planning
    • Weber, P., (1995) Practical issues in demand forecasting. Presented at INFORMS Conference, New Orleans. IBM Corporate Business Planning.
    • (1995) Practical issues in demand forecasting.
    • Weber, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.